Permit: TD-DEV-0623-00280
Permit Details
Status:
Approved
Type:
Development Package
Address:
1698 S CHERRYBELL SV
Address NEW:
1698 S CHERRYBELL SV
Apply Date:
06/16/2023
Applicant:
Britt Petersen
Description:
*Revision #1 (building sf) started 6/20/24* Master Plan for expansion/addition/site improvements for Goodwill Industries. Expansion of existing building, new warehouse, new loading docks and access drives off of Cherrybell Stravenue, parking additions, new drainage basins, and site improvements.
Permit Reviews
Permit Number - TD-DEV-0623-00280
Permit Status: Approved
Permit Description: *Revision #1 (building sf) started 6/20/24* Master Plan for expansion/addition/site improvements for Goodwill Industries. Expansion of existing building, new warehouse, new loading docks and access drives off of Cherrybell Stravenue, parking additions, new drainage basins, and site improvements.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/15/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/12/2025 | APPROVED |
| 06/20/2023 | DEVELOPMENT PACKAGE NEW v.1 | 06/20/2023 | REQUIRES RESUBMIT |
| 08/30/2023 | DEVELOPMENT PACKAGE NEW v.3 | 10/04/2023 | REQUIRES RESUBMIT |
| 02/05/2024 | DEVELOPMENT PACKAGE NEW v.5 | 03/01/2024 | REQUIRES RESUBMIT |
| 06/20/2024 | DEVELOPMENT PACKAGE NEW v.1 | 07/31/2024 | APPROVED |
| 03/21/2024 | DEVELOPMENT PACKAGE NEW v.6 | 04/02/2024 | APPROVED |
| 06/29/2023 | DEVELOPMENT PACKAGE NEW v.2 | 08/03/2023 | REQUIRES RESUBMIT |
| 11/30/2023 | DEVELOPMENT PACKAGE NEW v.4 | 01/02/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TD-DEV-0623-00280
Permit Status: Approved
Permit Description: *Revision #1 (building sf) started 6/20/24* Master Plan for expansion/addition/site improvements for Goodwill Industries. Expansion of existing building, new warehouse, new loading docks and access drives off of Cherrybell Stravenue, parking additions, new drainage basins, and site improvements.
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 10/02/2025 | CRWHPLAN NEEDS TO BE CREATED PRIOR TO CLOSEOUT |
Outstanding Inspections
Permit Status: Approved
Permit Number: TD-DEV-0623-00280
Permite Description: *Revision #1 (building sf) started 6/20/24* Master Plan for expansion/addition/site improvements for Goodwill Industries. Expansion of existing building, new warehouse, new loading docks and access drives off of Cherrybell Stravenue, parking additions, new drainage basins, and site improvements.
Total Outstanding Inspections - 7
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/05/2026 | SITE - Stormwater Follow-up | N/A | Partial Pass | |
| 05/13/2026 | N/A | Partial Pass | ABT poly drain trench drain system inverts and slope at dock correct . 12" ADS N-12 smooth wall drain pipe bedded correct. Slope correct from catch basin at end of trench to basin 1 .5% slope good. OK to backfill drain pipe except the ends where catch basin and manhole are. 18" ADS drain pipe at basin outflow bedded correct. OK to Backfill. Schedule inspections for catch basin and man hole before backfilling. Schedule inspection for head wall outlet structure at basin 1 |
|
| 06/03/2026 | ENGR - Drainage Structures | N/A | Not Ready | Concrete Outlet Weir for Basin 1 not per plan. Reschedule when ready. It is ok to switch manhole from PAG SD 302/303 to Pima County SD 205 at SDMH -1 The cover must state Storm Drain. Reschedule this inspection when Base is poured and ready to pour next section |
| 06/09/2026 | N/A | Not Applicable | Light pole base inspection under misc. concrete structure inspection. | |
| 06/09/2026 | N/A | Partial Pass | Three light pole footings; 1 at NE corner of docks, 1 south side of docks entrance drive, 1 NW of docks: dimensions, depths, reinforcement cage, and ground wire are good. Okay to pour three light pole bases. | |
| 06/17/2026 | N/A | Partial Pass | 6/17/26 Bollards set to correct depth and hight above sidewalk in footings snd are per plan. Ensure that they are not more than 5’ OC. |
|
| 06/17/2026 | N/A | Partial Pass | Sidewalk entry pad ay at front entrance to new building correct. okay to pour. |
Completed Inspections
Permit Status: Approved
Permit Number: TD-DEV-0623-00280
Permit Description: *Revision #1 (building sf) started 6/20/24* Master Plan for expansion/addition/site improvements for Goodwill Industries. Expansion of existing building, new warehouse, new loading docks and access drives off of Cherrybell Stravenue, parking additions, new drainage basins, and site improvements.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/18/2025 | PDSD Engineering Division Pre-Construction SITE | Passed | I met With GC Erich Schmidt and Goodwill representative. We went over the plans and the site and the inspections needed for the scope of phase 1. This is the North section of the Site outlined in Red in the site plan. Site looked good. He will be calling in his initial storm water and Grading Inspections for Monday. |
|
| 08/04/2025 | SITE - Stormwater Setup and Controls | Passed | ||
| 01/20/2026 | SITE - Stormwater Follow-up | Passed | All BMP’s are currently correct and functioning. | |
| 05/13/2026 | Passed | Grading is rough, but looks good for initial grading inspection. Basin number one needs to be dug a little deeper. The inverted drain pipe is below bottom of basin. Loading dock slope looks good and general parking area on other side of ridge in front of dock slopes look correct to grading sheet. |
Scheduled Inspections
Scheduled Inspections - TD-DEV-0623-00280
Status: Approved
Description: *Revision #1 (building sf) started 6/20/24* Master Plan for expansion/addition/site improvements for Goodwill Industries. Expansion of existing building, new warehouse, new loading docks and access drives off of Cherrybell Stravenue, parking additions, new drainage basins, and site improvements.
| Scheduled Date | Description | Entered By | Entered Date |
|---|---|---|---|
| 01/18/2026 | SITE - Stormwater Follow-up | Scheduled |
For information about today’s scheduled inspections please refer to the
PDSD Daily Inspections Dashboards (Desktop)
PDSD Daily Inspections Dashboards (Mobile)
.