Inspection Status: Partial Pass
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/26/2026 |
ENGR Grading Final |
|
Partial Pass |
10/26/26 Grading is almost complete. Areas along Cherrybell need to be smoothed. Piles need to be removed or smoothed and basin 1 need to be finished with top elevation at 2461.0 and bottom 2458.25.- Inlets and outlets ready for riprap. Also finish Water Harvesting Basin A... Smooth out behind curbs and prepare landscaped areas for landscaping materials and finish all areas that have been disturbed. Large stockpile on west side will be kept for fill in phase 2. |
| 11/17/2026 |
ENGR Grading Final |
|
Passed |
Grading is substantially complete for Phase 1. Excess fill stockpile will be utilized in future phase. Slopes and Basins are correct. Some dirt behind the curbs should be removed to provide space for 2" layer of DG in landscaped areas. |