Permit: TD-DEV-0623-00280

Parcel: 129091410

Inspection Status: Not Ready

Inspection History: ENGR - Drainage Structures

Date Description Inspector Results Comments
06/03/2026 ENGR - Drainage Structures Not Ready Concrete Outlet Weir for Basin 1 not per plan. Reschedule when ready.

It is ok to switch manhole from PAG SD 302/303 to Pima County SD 205 at SDMH -1
The cover must state Storm Drain.
Reschedule this inspection when Base is poured and ready to pour next section
06/04/2026 ENGR - Drainage Structures Partial Pass Basin #1 weir now correct to plan and survey. Okay to pour weir.

Curb cut for drainage from parking lot into basin #1 not poured in correct location to plan and will not drain correctly. It needs to be relocated to the north per plan in order to drain.

Base of SDMH-1 poured and looks good. Loading Dock poured and also look good.

Pick one construction entrance with good track out or provide track outs that comply to SWPPP at both entrances. Use larger diameter angular rock. 2-4"
Keep concrete clean-out waste in the concrete cleanout. Contain any contaminants. Contaminants need to be cleaned up right away if they are hitting dirt.