Inspection History Details
Inspection Status: Partial Pass
Inspection History
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/13/2026 | Partial Pass | ABT poly drain trench drain system inverts and slope at dock correct . 12" ADS N-12 smooth wall drain pipe bedded correct. Slope correct from catch basin at end of trench to basin 1 .5% slope good. OK to backfill drain pipe except the ends where catch basin and manhole are. 18" ADS drain pipe at basin outflow bedded correct. OK to Backfill. Schedule inspections for catch basin and man hole before backfilling. Schedule inspection for head wall outlet structure at basin 1 |