Permit Details

Status:
Issued
Type:
Development Package
Address:
455 E WETMORE RD
Address NEW:
455 E WETMORE RD
Apply Date:
03/21/2024
Applicant:
Benjamin Jessop
Description:
Rev 1 - 7/18/25 - EV chargers; Expansion of existing Walmart from 87,000 SF to 164,000 SF on 11.71 acres.

Permit Reviews

Permit Number - TD-DEV-0324-00096
Permit Status: Issued
Permit Description: Rev 1 - 7/18/25 - EV chargers; Expansion of existing Walmart from 87,000 SF to 164,000 SF on 11.71 acres.
Start Date Submittal Complete Date Status  
11/08/2024 DEVELOPMENT PACKAGE NEW v.3 12/18/2024 REQUIRES RESUBMIT Review Details
09/03/2025 DEVELOPMENT PACKAGE NEW REVISION v.3 09/25/2025 APPROVED Review Details
07/22/2024 DEVELOPMENT PACKAGE NEW v.2 09/27/2024 REQUIRES RESUBMIT Review Details
07/30/2025 DEVELOPMENT PACKAGE NEW REVISION v.2 08/22/2025 REQUIRES RESUBMIT Review Details
03/22/2024 DEVELOPMENT PACKAGE NEW v.1 05/08/2024 REQUIRES RESUBMIT Review Details
11/04/2025 DEVELOPMENT PACKAGE NEW REVISION v.2 11/26/2025 APPROVED Review Details
07/18/2025 DEVELOPMENT PACKAGE NEW REVISION v.1 07/25/2025 REQUIRES RESUBMIT Review Details
10/13/2025 DEVELOPMENT PACKAGE NEW REVISION v.1 10/13/2025 REQUIRES RESUBMIT Review Details
01/07/2025 DEVELOPMENT PACKAGE NEW v.4 02/20/2025 APPROVED Review Details

Outstanding Inspections

Permit Status: Issued
Permit Number: TD-DEV-0324-00096
Permite Description: Rev 1 - 7/18/25 - EV chargers; Expansion of existing Walmart from 87,000 SF to 164,000 SF on 11.71 acres.
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
05/13/2025 Consultation SITE N/A Partial Pass Contractors going to start installing the RCP’s in the back of the Walmart will call in for another inspection for the trench and the bedding tomorrow
07/23/2025 ENGR - Drainage Structures N/A Partial Pass 7/23/25
Okay to pour Catch Basin 309. Unable to see Joint to Drainage pipe so do not backfill until we see it again after forms are stripped. Call us back out to reinspect.
11/10/2025 N/A Partial Pass 11/10/25
Approx 100' 12" RCP at 1% running up grade, west in front of store, from manhole at NE of building. Trench correct, shading correct. Ok to backfill. Submit compaction reports to the portal. Inspector will be on site at 4:00 am Wednesday for next section in front of entrance.
11/14/2025 ENGR Paving N/A Partial Pass 11/14/25

PCCP 6" north of store from last cold joint at start of Catch Basin in middle of driveline.
Submit compaction reports in Subgrade and AB to the portal.
Expansion material at cold joints and dowels at joint of previous pour.
Spoils pile needs to be cleaned up to south of catch basin. Send picture showing this.
Okay to place 6" concrete paving up to expansion joint in gutter curb approximately 20 ft east of manhole. Submit compaction reports and cylinders results to the permit.
Okay to pour further west pending pictures of correct grading and depths and pending compaction reports up to and past stoop and man hole west to corner of building.
12/10/2025 N/A Partial Pass 12/10/25
Seven 6" pipe Bollards are spaced 5' OC in front of Entryway. Depth of Footers is 51". As you go east the entryway becomes block wall adjacent to sidewalk. Here the spacing of 7 more is 8' OC per plans and accepted by Tsmr. Okay to pour bollards.
12/12/2025 N/A Partial Pass 12/12/25
Sidewalk section not Poured yesterday ready between cold joints. Toe down at bollard correct and dowels and expansion joints good. Another formed area in front of cart service door ready with expansion joints material and dowels.
Okay to pour these areas.

Completed Inspections

Permit Status: Issued
Permit Number: TD-DEV-0324-00096
Permit Description: Rev 1 - 7/18/25 - EV chargers; Expansion of existing Walmart from 87,000 SF to 164,000 SF on 11.71 acres.
Total Completed Inspections - 1
Date Description Inspector Results Comments
04/23/2025 PDSD Engineering Division Pre-Construction SITE Passed For the contractor to call in every two weeks for the swap, and as needed, also inform the contractor that we would need to review all the compaction test and the trench lines all the underground storm drains as it has been built

Documents

File Name Document Type  
2_REV1 - 1325.008 TUCSON AZ - EV PLANS_V2.PDF DOCUMENTS VIEW
2_REV1 - SP-06 SITE PLAN_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
REVISION 1 - APPROVED - FULL PLAN SET - 4_WALMART 1325 DEVELOPMENT PACKAGE_REV1_V1 - STAMPED 11.26.2025.PDF DOCUMENTS VIEW
1_WALMART 1325 DEVELOPMENT PACKAGE_V1.PDF DOCUMENTS VIEW
2_WALMART 1325 DEVELOPMENT PACKAGE USE THIS ONE_V1.PDF DOCUMENTS VIEW
DP 2ND REVIEW COMMENT RESPONSE UPDATED_V1.PDF DOCUMENTS VIEW
4_WALMART 1325 DEVELOPMENT PACKAGE_V3.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_WALMART 1325 DRAINAGE STATEMENT_V1.PDF DOCUMENTS VIEW
1_WALMART 1325 GEOTECH REPORT_V1.PDF DOCUMENTS VIEW
1_WALMART 1325 STORMWATER MANAGEMENT SET_V1.PDF DOCUMENTS VIEW
2_WALMART 1325 COMMENT RESPONSE_V1.PDF DOCUMENTS VIEW
2_WALMART 1325 DEVELOPMENT PACKAGE_V2.PDF DOCUMENTS VIEW
3_WALMART 1325 DEVELOPMENT PACKAGE_V2.PDF DOCUMENTS VIEW
4_2025-1-6 COMMENT RESPONSE_V2.PDF DOCUMENTS VIEW
4_SWD (LOT RECONFIGURATION TUCSON PLACE) - RECORDED_V1.PDF DOCUMENTS VIEW
DP 2ND REVIEW COMMENT RESPONSE_V1.PDF DOCUMENTS VIEW
MAIL -TSMR REQUEST - OUTLOOK_V1.PDF DOCUMENTS VIEW
MARK UP 1_WALMART 1325 DEVELOPMENT PACKAGE_V1 (2).PDF DOCUMENTS VIEW
RESPONSE LETTER.PDF DOCUMENTS VIEW
SITE MAP.PDF DOCUMENTS VIEW
1_WALMART 1325 DEVELOPMENT PACKAGE_V1.PDF PLANS UNDER REVIEW VIEW
1_WALMART 1325 GEOTECH REPORT_V1.PDF PLANS UNDER REVIEW VIEW
1_WALMART 1325 STORMWATER MANAGEMENT SET_V1.PDF PLANS UNDER REVIEW VIEW
1_FOR REFERENCE ONLY - DP BK9 PG68_V1.PDF PLANS UNDER REVIEW VIEW
1_FOR REFERENCE ONLY - DP BK10 PG47_V1.PDF PLANS UNDER REVIEW VIEW
1_WALMART 1325 DRAINAGE STATEMENT_V1.PDF PLANS UNDER REVIEW VIEW