Parcel: 10510242A


Addresses:

455 E WETMORE RD


Inspection Status: Partial Pass

Inspection History: ENGR Paving

Permit Number - TD-DEV-0324-00096

Inspection Description - ENGR Paving

Inspection Status - Partial Pass

Date Description Inspector Results Comments
09/25/2025 ENGR Paving Partial Pass 9/25/25
Submit good compaction report of Subgrade . Concrete test cylinders to meet specifications per plan- AB is correct, concrete 6" depth with dowels at joints. Straighten dowels as needed if bent. Okay to pour pending good AB Reports 95% from joint at NE corner of building to front edge of East loading dock.

9/25/25
Drain pipe reinspection- contractor at risk to Replace PAG 307 type 1 Single catch basin at curb installed with the Double CB called for per plan pending determination of Engineer of Record. Ok to backfill Storm Drain and submit good compaction report.
11/06/2025 ENGR Paving Partial Pass 11/7/25
PCCP 6" north of store from last cold joint going west to loading dock.
Reveals on curb correct. Compaction test in AB not yet done.
put expansion material at cold joints and dowels at joint of previous pour.
Pending compaction reports that comply and pictures showing all loose areas rolled and smooth, Okay to place 6" concrete paving. Submit compaction reports and cylinders results to the permit.
11/10/2025 ENGR Paving Partial Pass 11/10/25
PCCP 6" north of store from last cold joint going west adjacent to loading dock.
Reveals on curb correct. Submit compaction reports in Subgrade and AB to the portal.
put expansion material at cold joints and dowels at joint of previous pour. Send picture of dowels at last cold joint.
Okay to place 6" concrete paving pending picture of dowels. Submit compaction reports and cylinders results to the permit.
11/13/2025 ENGR Paving Partial Pass 11/14/25

PCCP 6" north of store from last cold joint at start of Catch Basin in middle of driveline.
Submit compaction reports in Subgrade and AB to the portal.
Expansion material at cold joints and dowels at joint of previous pour.
Spoils pile needs to be cleaned up to south of catch basin. Send picture showing this.
Okay to place 6" concrete paving up to expansion joint in gutter curb approximately 20 ft east of manhole. Submit compaction reports and cylinders results to the permit.
Okay to pour further west pending pictures of correct grading and depths and pending compaction reports up to and past stoop and man hole west to corner of building.