Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 04/23/2025 |
PDSD Engineering Division Pre-Construction SITE |
|
Passed |
For the contractor to call in every two weeks for the swap, and as needed, also inform the contractor that we would need to review all the compaction test and the trench lines all the underground storm drains as it has been built |