Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Partial Pass
Inspection History
Permit Number - TD-DEV-0324-00096
Inspection Description -
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/13/2025 | Partial Pass | No significant progress. Manhole will need to be cleaned out due to dirt washing into structure. | ||
| 07/01/2025 | Partial Pass | Contractor gave us a copy of the changes made by engineer of record for the manhole on the north side of the building | ||
| 09/12/2025 | Partial Pass | 9/12/25 8” PVC drain pipe, connected to roof drain. Backflow installed correctly. Drain pipe slopes down approximately 40’ goes under cast wall footer to 24 inch RCP. Collar is good and joint is grouted correctly. Backfill this and lifts and take compaction tests of lifts. Slurry underneath footer and vibrate correctly. Okay to Backfill and Slurry underneath footer Next week 24” RCP will be exposed again to continue 18” RCP to new Catch Basin At curb. Make sure this connection has correct clearance away from 24” Bell and call us back in to reinspected that run. |
||
| 11/10/2025 | Partial Pass | 11/10/25 Approx 100' 12" RCP at 1% running up grade, west in front of store, from manhole at NE of building. Trench correct, shading correct. Ok to backfill. Submit compaction reports to the portal. Inspector will be on site at 4:00 am Wednesday for next section in front of entrance. |
||
| 11/12/2025 | Partial Pass | SD run on South side of building okay to the west end of the existing main entrance. | ||
| 11/13/2025 | Passed | Verified compaction with Terracon, Installation accepted. |