Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
06/12/2024
Applicant:
Description:
GC model 100 duplex

Permit Reviews

Permit Number - TC-MDP-0524-00635
Permit Status: Complete
Permit Description: GC model 100 duplex
Start Date Submittal Complete Date Status  
07/25/2024 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.3 08/06/2024 REQUIRES RESUBMIT Review Details
06/21/2024 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 07/02/2024 REQUIRES RESUBMIT Review Details
08/22/2024 RESTAMP - RESIDENTIAL v.1 08/27/2024 APPROVED Review Details
06/14/2024 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 06/14/2024 REQUIRES RESUBMIT Review Details
08/09/2024 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.4 08/22/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0524-00635
Permit Status: Complete
Permit Description: GC model 100 duplex
Date Description Comments
06/14/2024 Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512
05/17/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
05/17/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0524-00635
Permite Description: GC model 100 duplex
Total Outstanding Inspections - 11
Last Inspection Date Description Inspector Results Comments
01/02/2025 COT - RSBU - Interior Shear Bracing N/A Re-inspection required 01/02/2025
East firewall on unit 1 is missing drywall screws above ceiling. All joints have to be taped above ceiling.
Missing blocking above west window in kitchen.
Missing drywall screws in northeast bedroom.

unit 2: Firewall needs screws above ceiling line. also needs tape on all joints above ceiling.
01/15/2025 COT - RSPL - Yard Water Line N/A Re-inspection required 01/15/25

Water line not under test. Must also have a gauge showing 60 psi in the lines.
01/15/2025 COT - RSPL - Sewer N/A Re-inspection required 01/15/25

Sewer line not under test and missing green tracer wire.
01/15/2025 COT - RSPL - Backwater Valve N/A Re-inspection required 01/15/25

Sewer line not under test and missing green tracer wire.
05/20/2025 COT - RSEL - Electrical Underground N/A Not Applicable
05/20/2025 COT - BULD - SWG Clearance N/A Not Applicable
05/20/2025 COT - RSPL - Gas Pressure Test N/A Not Applicable
06/23/2025 COT - RSME - Mechanical Final N/A Re-inspection required Provide plans on site. Provide vacuum breakers at exterior hose bibs. Coat all exterior pipes. Add mud to exterior for exposure of plumbing. Exterior receptacles need to be WR and do not reset. Properly insulate exterior water lines. Missing anti tip for stove. Provide hammer arrestor on hot line for dishwasher. Cut down clean out and provide proper caps. Seal all exterior penetrations. Provide ladder for roof access. Electrical panel has not been made up. Receptacle in bedroom missing yolk. Stopped inspection. Other items may apply. 5/20/2025
6/23/25: proper clean out covers required at driveway, UV tape required at insulation on exterior hose-bibs, GFCI receptacles required at exterior, all exterior plastic piping must be coated for UV protection, leak at hose bib that is kinked, Arc-fault breakers required throughout, anti-tip required, GFCI required at garbage disposal, cut Cleanouts and add proper caps, GFCI at laundry, exhaust fan covers must be installed, properly secure liquid tight at water heater disconnect box, T&P must terminate in pan, no roof access.
06/23/2025 RSBU - Building Final N/A Re-inspection required Provide plans on site. Provide vacuum breakers at exterior hose bibs. Coat all exterior pipes. Add mud to exterior for exposure of plumbing. Exterior receptacles need to be WR and do not reset. Properly insulate exterior water lines. Missing anti tip for stove. Provide hammer arrestor on hot line for dishwasher. Cut down clean out and provide proper caps. Seal all exterior penetrations. Provide ladder for roof access. Electrical panel has not been made up. Receptacle in bedroom missing yolk. Stopped inspection. Other items may apply. 5/20/2025
6/23/25: proper clean out covers required at driveway, UV tape required at insulation on exterior hose-bibs, GFCI receptacles required at exterior, all exterior plastic piping must be coated for UV protection, leak at hose bib that is kinked, Arc-fault breakers required throughout, anti-tip required, GFCI required at garbage disposal, cut Cleanouts and add proper caps, GFCI at laundry, exhaust fan covers must be installed, properly secure liquid tight at water heater disconnect box, T&P must terminate in pan, no roof access. per City of Tucson all inclusive home design please provide an accessible route/entrance per approved plans.
06/23/2025 COT - RSPL - Plumbing Final N/A Re-inspection required Provide plans on site. Provide vacuum breakers at exterior hose bibs. Coat all exterior pipes. Add mud to exterior for exposure of plumbing. Exterior receptacles need to be WR and do not reset. Properly insulate exterior water lines. Missing anti tip for stove. Provide hammer arrestor on hot line for dishwasher. Cut down clean out and provide proper caps. Seal all exterior penetrations. Provide ladder for roof access. Electrical panel has not been made up. Receptacle in bedroom missing yolk. Stopped inspection. Other items may apply. 5/20/2025
6/23/25: proper clean out covers required at driveway, UV tape required at insulation on exterior hose-bibs, GFCI receptacles required at exterior, all exterior plastic piping must be coated for UV protection, leak at hose bib that is kinked, Arc-fault breakers required throughout, anti-tip required, GFCI required at garbage disposal, cut Cleanouts and add proper caps, GFCI at laundry, exhaust fan covers must be installed, properly secure liquid tight at water heater disconnect box, T&P must terminate in pan, no roof access.
06/23/2025 COT - RSEL - Electrical Final N/A Re-inspection required Provide plans on site. Provide vacuum breakers at exterior hose bibs. Coat all exterior pipes. Add mud to exterior for exposure of plumbing. Exterior receptacles need to be WR and do not reset. Properly insulate exterior water lines. Missing anti tip for stove. Provide hammer arrestor on hot line for dishwasher. Cut down clean out and provide proper caps. Seal all exterior penetrations. Provide ladder for roof access. Electrical panel has not been made up. Receptacle in bedroom missing yolk. Stopped inspection. Other items may apply. 5/20/2025
6/23/25: proper clean out covers required at driveway, UV tape required at insulation on exterior hose-bibs, GFCI receptacles required at exterior, all exterior plastic piping must be coated for UV protection, leak at hose bib that is kinked, Arc-fault breakers required throughout, anti-tip required, GFCI required at garbage disposal, cut Cleanouts and add proper caps, GFCI at laundry, exhaust fan covers must be installed, properly secure liquid tight at water heater disconnect box, T&P must terminate in pan, no roof access.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0524-00635
Permit Description: GC model 100 duplex
Total Completed Inspections - 19
Date Description Inspector Results Comments
08/30/2024 COT - RSPL - Rough Soil Passed Ok to cover progress areas.
09/12/2024 COT - RSBU - Preslab Passed Ensure slab area is properly termite treated
09/12/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
11/05/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 11/5/2024 corrections were made. Approved.
11/05/2024 COT - RSBU - Roof Nailing Passed 11/5/2024 corrections were made. Approved.
12/20/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 12/20/24 corrections have been made, ok to proceed.
01/03/2025 COT - RSBU - Interior Shear Bracing Passed 1-3-25, interior shear approved. Okay to tape & texture drywall.
01/17/2025 COT - RSPL - Yard Water Line Passed 01/17/25

Passed. OK to backfill shading required.
01/17/2025 COT - RSPL - Sewer Passed 01/17/25

Passed. OK to backfill shading required.
01/17/2025 COT - RSPL - Backwater Valve Passed 01/17/25

Passed.
04/17/2025 BULD - Electrical Clearance Passed 4-17-25, okay to energize panel. ECO clearance issued to TEP.
05/20/2025 COT - RSEL - Grounding/Bonding Passed
05/21/2025 ENGR Engineering Final Passed Site is clean and safe, in accordance with approved plans. CofO ready.
05/20/2025 RSBU - Building Progress Passed
06/23/2025 COT - RSEL - Outdoor Lighting Passed
07/09/2025 COT - RSME - Mechanical Final Passed
07/09/2025 RSBU - Building Final Passed
07/09/2025 COT - RSPL - Plumbing Final Passed
07/09/2025 COT - RSEL - Electrical Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
C1-1671 SITE PLAN -V4_V4.PDF DOCUMENTS VIEW