Inspection History Details
Inspection Status: Re-inspection required
Inspection History: RSBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/20/2025 | RSBU - Building Final | Re-inspection required | Provide plans on site. Provide vacuum breakers at exterior hose bibs. Coat all exterior pipes. Add mud to exterior for exposure of plumbing. Exterior receptacles need to be WR and do not reset. Properly insulate exterior water lines. Missing anti tip for stove. Provide hammer arrestor on hot line for dishwasher. Cut down clean out and provide proper caps. Seal all exterior penetrations. Provide ladder for roof access. Electrical panel has not been made up. Receptacle in bedroom missing yolk. Stopped inspection. Other items may apply. 5/20/2025 | |
| 06/23/2025 | RSBU - Building Final | Re-inspection required | Provide plans on site. Provide vacuum breakers at exterior hose bibs. Coat all exterior pipes. Add mud to exterior for exposure of plumbing. Exterior receptacles need to be WR and do not reset. Properly insulate exterior water lines. Missing anti tip for stove. Provide hammer arrestor on hot line for dishwasher. Cut down clean out and provide proper caps. Seal all exterior penetrations. Provide ladder for roof access. Electrical panel has not been made up. Receptacle in bedroom missing yolk. Stopped inspection. Other items may apply. 5/20/2025 6/23/25: proper clean out covers required at driveway, UV tape required at insulation on exterior hose-bibs, GFCI receptacles required at exterior, all exterior plastic piping must be coated for UV protection, leak at hose bib that is kinked, Arc-fault breakers required throughout, anti-tip required, GFCI required at garbage disposal, cut Cleanouts and add proper caps, GFCI at laundry, exhaust fan covers must be installed, properly secure liquid tight at water heater disconnect box, T&P must terminate in pan, no roof access. per City of Tucson all inclusive home design please provide an accessible route/entrance per approved plans. |
|
| 06/27/2025 | RSBU - Building Final | Re-inspection required | Provide plans on site. Provide vacuum breakers at exterior hose bibs. Coat all exterior pipes. Add mud to exterior for exposure of plumbing. Exterior receptacles need to be WR and do not reset. Properly insulate exterior water lines. Missing anti tip for stove. Provide hammer arrestor on hot line for dishwasher. Cut down clean out and provide proper caps. Seal all exterior penetrations. Provide ladder for roof access. Electrical panel has not been made up. Receptacle in bedroom missing yolk. Stopped inspection. Other items may apply. 5/20/2025 6/23/25: proper clean out covers required at driveway, UV tape required at insulation on exterior hose-bibs, GFCI receptacles required at exterior, all exterior plastic piping must be coated for UV protection, leak at hose bib that is kinked, Arc-fault breakers required throughout, anti-tip required, GFCI required at garbage disposal, cut Cleanouts and add proper caps, GFCI at laundry, exhaust fan covers must be installed, properly secure liquid tight at water heater disconnect box, T&P must terminate in pan, no roof access. 6/27/25: proper clean out covers required at driveway, properly secure liquid tight at water heater disconnect box, T&P must terminate in pan, no roof access. per City of Tucson all inclusive home design please provide an accessible route/entrance per approved plans. |
|
| 07/09/2025 | RSBU - Building Final | Passed |