Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/27/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Not Ready | 11/27/25. Not ready | |
| 12/06/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 11/27/25. Not ready 12/6/24: seal all penetrations through vapor barrier (rips,tears,staples), seal all penetrations through top plate throughout, seal bottom plate with foam, FHA plate required at dryer exhaust vent, grey water piping required (not installed), 2 lights required per plan in closet, wire size at multiple circuits not per plan, carbon monoxide detector and smoke detector missing outside of bedrooms, receptacles missing at exterior, plumbing at shower/tub not complete and not under test, multiple circuits tied together. STOPPED INSPECTION MORE ITEMS MAY BE ADDED. |
|
| 12/18/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Not Ready | 12/18/24. Stud shoes required at 2x4 where 2" PVC runs through, fire blocking required at main service panel (Check top plates as well). Exterior lights must have receptacle, grounded and sealed. RE INSPECTION required. NOT READY. Revised plans also have been sent in but not approved. DO NOT PROCEED. | |
| 12/20/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 12/20/24 corrections have been made, ok to proceed. |