Inspection Status: Re-inspection required

Inspection History: COT - RSBU - Roof Nailing 

Date Description Inspector Results Comments
10/08/2024 COT - RSBU - Roof Nailing  Re-inspection required 10/8/24: plans state per note 11 no page S2 that sheathing is required throughout exterior walls at perimeter of house, anchor bolt spacing is 32" o.c (over spaced throughout), anchor bolts must be properly fastened, shot pins required 6" from edge of sill plate at interior no. Bearing walls, discrepancies in plans (details call for 2-hour party wall on pgA2. and 1-hour wall on pg.A1.
10/10/2024 COT - RSBU - Roof Nailing  Re-inspection required 10/8/24: plans state per note 11 no page S2 that sheathing is required throughout exterior walls at perimeter of house, anchor bolt spacing is 32" o.c (over spaced throughout), anchor bolts must be properly fastened, shot pins required 6" from edge of sill plate at interior no. Bearing walls, discrepancies in plans (details call for 2-hour party wall on pgA2. and 1-hour wall on pg.A1.
10/10/24: trimmer studs require shims at headers to make full contact, compromised sill plates need to be replaced, fire wall partition wall must extend 30" above deck, h2.5 missing h2.5 at truss, discrepancy at truss spacing (called out at 16" o.c and 24" o.c). Clips missing throughout per detail 4/S4. STOPPED INSPECTION MORE ITEMS MAY BE ADDED.
11/05/2024 COT - RSBU - Roof Nailing  Passed 11/5/2024 corrections were made. Approved.