Status:
Complete
Type:
Commercial Building
Apply Date:
10/24/2024
Applicant:
Architecture & Engineering City of Tucson
Description:
CIP Project - LRSC pre-fab metal bldg

Permit Reviews

Permit Number - TC-COM-1024-02056
Permit Status: Complete
Permit Description: CIP Project - LRSC pre-fab metal bldg
Start Date Submittal Complete Date Status  
01/02/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/02/2025 APPROVED Review Details
11/20/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 11/28/2025 APPROVED Review Details
10/28/2024 COMMERCIAL REVIEW - LIMITED v.1 11/12/2024 APPROVED Review Details
12/23/2024 RESTAMP - COMMERCIAL v.1 12/26/2024 APPROVED Review Details

Conditions

Permit Number - TC-COM-1024-02056
Permit Status: Complete
Permit Description: CIP Project - LRSC pre-fab metal bldg
Date Description Comments
10/28/2024 Address corrected on permit to Building 6 Per Applicant upload.
10/28/2024 SPECIAL INSPECTION FOR CONCRETE (Placement of Cast-in-Place Anchor Bolts) IS REQUIRED.
10/28/2024 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
10/28/2024 This project requires the completion of a Fire Construction Permit PRIOR TO FINALING this permit.
10/28/2024 Post-Installed Anchor Inspection Report is required.
01/06/2025 SPECIAL INSPECTION FOR POST-INSTALLED ANCHORS REQUIRED
01/02/2025 PRE-FABRICATED METAL BUILDING DESIGN MUST BE SUBMITTED AND APPROVED BY BUILDING SAFETY PRIOR TO FINAL INSPECTIONS
01/06/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
10/28/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
10/28/2024 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
10/28/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
10/28/2024 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.
06/18/2026 WATER STERILIZATION REPORT IS REQUIRED.
10/28/2024 SPECIAL INSPECTION FOR WELDING IS REQUIRED OR PROVIDE FABRICATOR'S CERTIFICATE OF COMPLIANCE

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-1024-02056
Permite Description: CIP Project - LRSC pre-fab metal bldg
Total Outstanding Inspections - 8
Last Inspection Date Description Inspector Results Comments
01/23/2025 BULD - Electrical Clearance N/A Not Ready
05/12/2026 COT - BULD - SWG Clearance N/A Not Applicable 5-12-26: Not applicable.
12/02/2025 COT - LCEL - Electrical Intermediate N/A Partial Pass 12-2-25: in wall electrical at room's 101, 102, 103 verified per plans. Okay to drywall progress areas.
Note: An RFI will possibly be submitted in the near future showing the mini split condensation draining into mop sink.
10/09/2025 COT - HCBU - Excavation/Rebar/Zoning N/A Partial Pass
12/12/2025 COT - LCBU - Building Progress N/A Partial Pass 12/12/2025 partial pass Drywall screw inspection. Approved. Okay to proceed progress areas.
06/04/2025 COT - HCEL - Grounding/Bonding N/A Partial Pass 6/4/25: partial pass for UFER
09/26/2025 COT - HCEL - Electrical Underground N/A Partial Pass 9-26-25: verified trench depth for 2- 4" schedule 40 electrical primary conduits from “J2” equipment, west to existing TEP manhole. Okay to backfill approximately 160' of trench.
COT - FCON - Fire - Final N/A Not Ready Need address on building. Need a knox box and a FACP and Riser room sign.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-1024-02056
Permit Description: CIP Project - LRSC pre-fab metal bldg
Total Completed Inspections - 15
Date Description Inspector Results Comments
12/09/2025 COT - LCPL - Plumbing Intermediate Passed 12.9.25
Approved
05/12/2026 COT - LCME - Mechanical Intermediate Passed 5-12-26: mechanical intermediates approved.
05/12/2026 BULD - Electrical Clearance Passed 5-12-26: previously inspected & approved.
05/12/2026 COT - LCEL - Electrical Intermediate Passed 5-12-26: electrical intermediates approved.
05/27/2026 COT - HCBU - Excavation/Rebar/Zoning Passed
05/27/2026 COT - LCBU - Building Progress Passed
05/27/2026 COT - HCEL - Grounding/Bonding Passed
05/27/2026 COT - HCEL - Electrical Underground Passed
06/25/2026 TRSP - ROW - Final/Close-Out Passed building is entirely on landfill property with no impact to right of way, passed and approved
07/01/2026 COT - LCEL - Electrical Final Passed 7-1-26: electrical final approved.
07/01/2026 ENGR Engineering Final Passed
07/01/2026 COT - LCPL - Plumbing Final Passed 7-1-26: plumbing final approved.
07/01/2026 COT - LCME - Mechanical Final Passed 7-1-26: mechanical final approved.
07/01/2026 COT - LCBU - Building Final Passed 7-1-26: building final approved. Okay to apply for a C of O.
07/07/2026 COT - FCON - Fire - Final Passed

Documents

File Name Document Type  
LOFC_LETTEROFCOMPLETION (SSRS).PDF DOCUMENTS VIEW
BY FUSION WATER STERILIZATION REPORT-2026-07-01_V1.PDF DOCUMENTS VIEW
CIP ANCHORS_V1.PDF DOCUMENTS VIEW
COT LOS REALES BYFUSION BUILDING SIC-FINAL-2026-07-01_V1.PDF DOCUMENTS VIEW
DENSITY REPORTS_V1.PDF DOCUMENTS VIEW
EARTHWORK DFRS_V1.PDF DOCUMENTS VIEW
SOIL LAB REPORTS_V1.PDF DOCUMENTS VIEW
STEEL_V1.PDF DOCUMENTS VIEW
PEMB DEFERRED SUBMITTAL_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
SPECIAL_INSPECTION_CERTIFICATE ATEK STAMP 2024-12-6-2024-12-31_V1.PDF DOCUMENTS VIEW
CONS-722.03_BYFUSION_REV 4_24-1220_V1.PDF DOCUMENTS VIEW
123340 LOS REALES BYFUSION METAL BUILDING STRUCTURAL CALCS_V1.PDF DOCUMENTS VIEW
230255 LRSC BYFUSION BUILDING GEOTECH RPT_V1.PDF DOCUMENTS VIEW