Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Inspection Status: Not Ready

Inspection History: COT - LCBU - Building Final 

Date Description Inspector Results Comments
04/10/2025 COT - LCBU - Building Final  Not Ready
06/25/2026 COT - LCBU - Building Final  Re-inspection required 6-25-26: label junction box above ceiling at I.T. room, submit an updated mechanical RFI for HVAC units installed on south eastern section of building. Units are smaller than what plans originally called for and are being over amped. Max breaker should be 31 but there is a 35 amp breaker at panel instead. Insulate copper water line at east side of building with a minimum of R3. Submit all required 3rd party reports to the city for review & approval. Permit cannot be finalized until all conditions are satisfied.
07/01/2026 COT - LCBU - Building Final  Passed 7-1-26: building final approved. Okay to apply for a C of O.