Inspection Status: Not Ready

Inspection History: BULD - Electrical Clearance

Date Description Inspector Results Comments
01/23/2025 BULD - Electrical Clearance Not Ready
04/15/2025 BULD - Electrical Clearance Partial Pass 4/15/25: electrical underground for 9 light poles and 1 future stub out per plan, 2" conduit for light poles and 1" conduit for low-voltage
04/21/2026 BULD - Electrical Clearance Passed 4-21-26: okay to energize meter. ECO clearance issued to TEP.
05/12/2026 BULD - Electrical Clearance Passed 5-12-26: previously inspected & approved.
06/27/2025 BULD - Electrical Clearance Partial Pass X3 2” for future power and x1 is for future data. Heading East of pad. Approximately 90’. Okay to backfill progress areas. 6/27/2025
07/11/2025 BULD - Electrical Clearance Partial Pass 7-10-25: verified trench depth on 2-4" & 1-2 1/2" schedule 40 electrical conduits for data
located south of pad. Okay to backfill approximately 150' of trench and continue with construction.
07/22/2025 BULD - Electrical Clearance Partial Pass 7-22-25: verified trench depth for 2-4" & 2 1/2" Schedule 40 low voltage electrical conduits. Okay to backfill approximately 130' of trench and continue with construction at progress areas.