Inspection Status: Not Ready

Inspection History: COT - LCME - Mechanical Final 

Date Description Inspector Results Comments
05/12/2026 COT - LCME - Mechanical Final  Not Ready 5-12-26: not ready.
06/12/2026 COT - LCME - Mechanical Final  Re-inspection required 6-12-26: verify minimum Mini split breaker. Current breaker is a 20 amp but not indicated on panel schedule or on unit itself.
06/25/2026 COT - LCME - Mechanical Final  Re-inspection required 6-25-26: label junction box above ceiling at I.T. room, submit an updated mechanical RFI for HVAC units installed on south eastern section of building. Units are smaller than what plans originally called for and are being over amped. Max breaker should be 31 but there is a 35 amp breaker at panel instead. Insulate copper water line at east side of building with a minimum of R3. Submit all required 3rd party reports to the city for review & approval. Permit cannot be finalized until all conditions are satisfied.
07/01/2026 COT - LCME - Mechanical Final  Passed 7-1-26: mechanical final approved.