Inspection Status: Partial Pass

Inspection History: COT - LCPL - Plumbing Final 

Date Description Inspector Results Comments
02/25/2025 COT - LCPL - Plumbing Final  Partial Pass 2-25-25, underground plumbing verified as per approved plans. Okay to backfill with shading.
02/28/2025 COT - LCPL - Plumbing Final  Partial Pass 2-25-25, underground plumbing verified as per approved plans. Okay to backfill with shading.
2/28/25: pre-con for sewer
04/11/2025 COT - LCPL - Plumbing Final  Partial Pass 4-11-25, okay to backfill approximately 110' of sewer connection. Sewer to be tested at a later date.
06/12/2026 COT - LCPL - Plumbing Final  Re-inspection required 6-12-26: pending fixtures at mop sink & verify water pressure.
06/25/2026 COT - LCPL - Plumbing Final  Re-inspection required 6-25-26: label junction box above ceiling at I.T. room, submit an updated mechanical RFI for HVAC units installed on south eastern section of building. Units are smaller than what plans originally called for and are being over amped. Max breaker should be 31 but there is a 35 amp breaker at panel instead. Insulate copper water line at east side of building with a minimum of R3. Submit all required 3rd party reports to the city for review & approval. Permit cannot be finalized until all conditions are satisfied.
07/01/2026 COT - LCPL - Plumbing Final  Passed 7-1-26: plumbing final approved.