Permit: TC-COM-0625-01137
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
6223 S PALO VERDE RD UNIT 151
Address NEW:
6223 S PALO VERDE RD UNIT 151
Apply Date:
06/10/2025
Applicant:
Andrew Venne
Description:
Interior Remodel
Permit Reviews
Permit Number - TC-COM-0625-01137
Permit Status: Complete
Permit Description: Interior Remodel
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/17/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 12/26/2025 | APPROVED |
| 07/31/2025 | RESTAMP - COMMERCIAL v.1 | 07/31/2025 | APPROVED |
| 12/09/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/11/2025 | REQUIRES RESUBMIT |
| 07/10/2025 | COMMERCIAL REVIEW - FULL v.2 | 07/31/2025 | APPROVED |
| 06/12/2025 | COMMERCIAL REVIEW - FULL v.1 | 07/02/2025 | REQUIRES RESUBMIT |
| 09/15/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/16/2025 | APPROVED |
Conditions
Permit Number - TC-COM-0625-01137
Permit Status: Complete
Permit Description: Interior Remodel
| Date | Description | Comments |
|---|---|---|
| 06/27/2025 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 07/29/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 06/27/2025 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 06/12/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 07/29/2025 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. | |
| 06/27/2025 | SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0625-01137
Permite Description: Interior Remodel
Total Outstanding Inspections - 6
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/14/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | 11-14-25: not applicable |
| 08/11/2025 | COT - LCPL - Plumbing Final | N/A | Canceled | Canceled per plumber. 8/11/2025 |
| 12/23/2025 | COT - LCBU - Building Final | N/A | Partial Pass | 12-23-25: submit letter that was requested for stem wall, pre slab, grout at loading dock walls. Submit as an attachment to the city- document must indicate that un-inspected items were completed per plans and meets or exceeds the 2018 IBC. |
| 09/09/2025 | COT - LCBU - Masonry Pregrout | N/A | Re-inspection required | 9-9-25: arrived on site at approximately 1315 hours. CMU wall was already grouted so I was not able to verify reinforcement. Submit a letter to the city for review/approval documenting that reinforcement at dock wall was per approved plans & attach 3rd party inspection report to letter as well. |
| 12/23/2025 | COT - LCBU - Preslab | N/A | Partial Pass | 12-23-25: submit letter that was requested for stem wall, pre slab, grout at loading dock walls. Submit as an attachment to the city- document must indicate that un-inspected items were completed per plans and meets or exceeds the 2018 IBC. |
| 12/23/2025 | COT - LCBU - Stem Wall/Retaining Wall | N/A | Partial Pass | 12-23-25: submit letter that was requested for stem wall, pre slab, grout at loading dock walls. Submit as an attachment to the city- document must indicate that un-inspected items were completed per plans and meets or exceeds the 2018 IBC. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0625-01137
Permit Description: Interior Remodel
Total Completed Inspections - 19
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/12/2025 | COT - HCPL - Rough Soil | Passed | 8-12-25: underground plumbing verified per plans. Okay to backfill with shading materials. | |
| 08/19/2025 | COT - LCBU - Excavation/Rebar/Zoning | Passed | 8.19.25 APPROVED |
|
| 09/17/2025 | COT - LCBU - Framing | Passed | 9-17-25: framing inspection approved. | |
| 09/17/2025 | COT - LCEL - Electrical Intermediate | Passed | 9-17-25: electrical intermediates approved. Okay to continue construction at progress areas. | |
| 10/09/2025 | BULD - Electrical Clearance | Passed | 10/9/25: ECO TEP CLEARANCE FOR UNIT 151. VERBAL CLEARANCE 1:30pm | |
| 10/21/2025 | COT - LCEL - Electrical Above Ceiling | Passed | 10-21-25: above ceiling junction boxes labeled, lights properly secured, and seismic wires in place. Mechanical properly secured/pookie joints approved. Okay to continue with TI. | |
| 11/14/2025 | COT - LCEL - Grounding/Bonding | Passed | 11-14-25: approved. | |
| 11/14/2025 | COT - LCEL - Electrical Final | Passed | 11-14-25: approved | |
| 11/18/2025 | COT - FCON - Fire - Final | Passed | ||
| 11/18/2025 | COT - FCON - Sprinkler - Final | Passed | ||
| 11/18/2025 | COT - LCME - Mechanical Final | Passed | 11-18-25: mechanical final approved. | |
| 11/18/2025 | COT - LCPL - Plumbing Final | Passed | 11-18-25: plumbing final approved. | |
| 12/09/2025 | ENGR Engineering Final | Passed | ||
| 12/23/2025 | TRSP - ROW - Final/Close-Out | Passed | Work was completed outside of the right of way | |
| 12/23/2025 | COT - LCEL - Electrical Underground | Passed | 12-23-25: approved. | |
| 01/08/2026 | COT - LCBU - Building Final | Passed | 1-8-26: Building Final Approved. All corrections made & 3rd party reports attached. | |
| 01/08/2026 | COT - LCBU - Masonry Pregrout | Passed | 1-8-26: approved-3rd party report attached. | |
| 01/08/2026 | COT - LCBU - Preslab | Passed | 1-8-26: approved-3rd party report attached. | |
| 01/08/2026 | COT - LCBU - Stem Wall/Retaining Wall | Passed | 1-8-26: approved-3rd party report attached. |