Inspection History Details
Inspection Status: Passed
Inspection History: COT - LCBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/08/2026 | COT - LCBU - Building Final | Passed | 1-8-26: Building Final Approved. All corrections made & 3rd party reports attached. | |
| 11/14/2025 | COT - LCBU - Building Final | Re-inspection required | 11-14-25: install restroom sign with braile at warehouse, complete installation of mini split at I.t. Room and install missing cover, add R3 insulation to hot leg of water heater, men's restroom grab bars must be installed 36" aff and measured to the top of bars, mirrors above lavatories must be installed at 40" to reflective surface, missing hose at mop sink, paint all plastics at rooftop. NOTE: Submit 3rd party inspection report for masonry pre-grout to the city for review. See inspection dated 9-9-25 for details. |
|
| 11/18/2025 | COT - LCBU - Building Final | Partial Pass | 11-18-25: corrections made. Partial pass-pending pending 3rd party inspection report for masonry pregrout regarding cmu wall/ reinforcement for loading dock -see notes from 9-9-25 for information. | |
| 12/23/2025 | COT - LCBU - Building Final | Partial Pass | 12-23-25: submit letter that was requested for stem wall, pre slab, grout at loading dock walls. Submit as an attachment to the city- document must indicate that un-inspected items were completed per plans and meets or exceeds the 2018 IBC. |