Inspection Status: Passed

Inspection History: COT - LCBU - Building Final 

Date Description Inspector Results Comments
01/08/2026 COT - LCBU - Building Final  Passed 1-8-26: Building Final Approved. All corrections made & 3rd party reports attached.
11/14/2025 COT - LCBU - Building Final  Re-inspection required 11-14-25: install restroom sign with braile at warehouse, complete installation of mini split at I.t. Room and install missing cover, add R3 insulation to hot leg of water heater, men's restroom grab bars must be installed 36" aff and measured to the top of bars, mirrors above lavatories must be installed at 40" to reflective surface, missing hose at mop sink, paint all plastics at rooftop.
NOTE: Submit 3rd party inspection report for masonry pre-grout to the city for review. See inspection dated 9-9-25 for details.
11/18/2025 COT - LCBU - Building Final  Partial Pass 11-18-25: corrections made. Partial pass-pending pending 3rd party inspection report for masonry pregrout regarding cmu wall/ reinforcement for loading dock -see notes from 9-9-25 for information.
12/23/2025 COT - LCBU - Building Final  Partial Pass 12-23-25: submit letter that was requested for stem wall, pre slab, grout at loading dock walls. Submit as an attachment to the city- document must indicate that un-inspected items were completed per plans and meets or exceeds the 2018 IBC.