Inspection Status: Passed

Inspection History: COT - LCBU - Preslab  

Date Description Inspector Results Comments
01/08/2026 COT - LCBU - Preslab   Passed 1-8-26: approved-3rd party report attached.
09/02/2025 COT - LCBU - Preslab   Partial Pass 9-2-25: loading dock reinforcement to be inspected by engineering.
11/14/2025 COT - LCBU - Preslab   Passed 11-14-25: approved.
12/23/2025 COT - LCBU - Preslab   Partial Pass 12-23-25: submit letter that was requested for stem wall, pre slab, grout at loading dock walls. Submit as an attachment to the city- document must indicate that un-inspected items were completed per plans and meets or exceeds the 2018 IBC.