Inspection Status: Canceled

Inspection History: COT - LCPL - Plumbing Final 

Date Description Inspector Results Comments
08/11/2025 COT - LCPL - Plumbing Final  Canceled Canceled per plumber. 8/11/2025
11/14/2025 COT - LCPL - Plumbing Final  Re-inspection required 11-14-25: install restroom sign with braile at warehouse, complete installation of mini split at I.t. Room and install missing cover, add R3 insulation to hot leg of water heater, men's restroom grab bars must be installed 36" aff and measured to the top of bars, mirrors above lavatories must be installed at 40" to reflective surface, missing hose at mop sink, paint all plastics at rooftop.
NOTE: Submit 3rd party inspection report for masonry pre-grout to the city for review. See inspection dated 9-9-25 for details.
11/18/2025 COT - LCPL - Plumbing Final  Passed 11-18-25: plumbing final approved.