Permit Details

Status:
Issued
Type:
Commercial Building
Address NEW:
5590 E TRAVEL PLAZA WY
Apply Date:
03/23/2023
Applicant:
Charmalee Jayawardena
Description:
NEW TRUCK TIRE AND LIGHT MECHANICAL MAINTENANCE FACILITY

Permit Reviews

Permit Number - TC-COM-0323-00868
Permit Status: Issued
Permit Description: NEW TRUCK TIRE AND LIGHT MECHANICAL MAINTENANCE FACILITY
Start Date Submittal Complete Date Status  
07/21/2023 COMMERCIAL REVIEW - FULL v.2 07/21/2023 REQUIRES RESUBMIT Review Details
12/06/2023 RESTAMP - COMMERCIAL v.1 12/07/2023 APPROVED Review Details
06/05/2025 RESTAMP - COMMERCIAL v.1 06/06/2025 APPROVED Review Details
03/26/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/01/2025 APPROVED Review Details
08/27/2026 SPECIAL INSPECTION REVIEW v.1 08/28/2026 APPROVED Review Details
07/29/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/01/2025 APPROVED Review Details
09/02/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 N/A APPROVED Review Details
11/27/2023 COMMERCIAL REVIEW - FULL v.3 12/06/2023 APPROVED Review Details
11/20/2025 COMMERCIAL REVIEW - FULL v.3 12/12/2025 APPROVED Review Details
08/12/2026 RESTAMP - COMMERCIAL v.1 08/18/2026 APPROVED Review Details
05/01/2025 COMMERCIAL REVIEW - FULL REVISION v.1 05/23/2025 REQUIRES RESUBMIT Review Details
03/24/2023 COMMERCIAL REVIEW - FULL v.1 04/21/2023 REQUIRES RESUBMIT Review Details
09/29/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/29/2025 REQUIRES RESUBMIT Review Details
07/24/2023 COMMERCIAL REVIEW - FULL v.1 08/16/2023 REQUIRES RESUBMIT Review Details
09/25/2025 COMMERCIAL REVIEW - FULL v.2 09/26/2025 REQUIRES RESUBMIT Review Details
06/05/2025 COMMERCIAL REVIEW - FULL REVISION v.2 06/05/2025 APPROVED Review Details
10/31/2023 COMMERCIAL REVIEW - FULL v.2 11/22/2023 REQUIRES RESUBMIT Review Details
08/07/2025 COMMERCIAL REVIEW - FULL v.1 08/27/2025 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0323-00868
Permit Status: Issued
Permit Description: NEW TRUCK TIRE AND LIGHT MECHANICAL MAINTENANCE FACILITY
Total Outstanding Activity Conditions - 3
Date Name
11/13/2023 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
11/13/2023 SPECIAL INSPECTION FOR OUTDOOR LIGHTING IS REQUIRED.
11/13/2023 Stair Designs must be submitted and approved prior to...

Conditions

Permit Number - TC-COM-0323-00868
Permit Status: Issued
Permit Description: NEW TRUCK TIRE AND LIGHT MECHANICAL MAINTENANCE FACILITY
Date Description Comments
11/13/2023 AIR BALANCING/COMMISSIONING REPORT IS REQUIRED.
07/28/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
06/06/2025 Prior to Issuance: This project requires issuance of a Development Package (DP) permit prior to issuance of this permit. Prior to TCO/Final: This project requires full completion of a Development Package (DP) permit prior to Temporary C of O and/or final completion this permit.
11/13/2023 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
08/28/2026 Prior to Final - Special Inspections - SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
11/13/2023 Please submit a separate sign permit for an signs associated with this projet.
07/28/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
02/05/2025 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.
11/13/2023 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-COM-0323-00868
Permite Description: NEW TRUCK TIRE AND LIGHT MECHANICAL MAINTENANCE FACILITY
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
11/26/2025 COT - HCPL - Rough Soil N/A Re-inspection required 11-26-25: city approved plans not on site-Reschedule inspection.
12/10/2025 COT - HCPL - Sewer N/A Not Ready Courtesy inspection. 12/10/2025
12/19/2025 COT - HCBU - Preslab N/A Re-inspection required 12/19/25: reinforcement at (3)interior spread footings must maintain 3" clearance from earth, all plumbing at slab must be wrapped to protect from concrete.
05/28/2026 COT - HCPL - Yard Water Line N/A Partial Pass 5-28-26: main water line verified under test at 80psi. Okay to backfill using shading materials.
08/26/2026 ENGR Engineering Final N/A Partial Pass Site is complete except:
-Handicap ramp that accesses landscaped area on west side of site is being rebuilt so it complies.
- Section of asphalt patch over utility trench that settled on NE side of building.
Okay to apply for TCO level 4 while these 2 repairs are completed. These 2 areas need to be cordoned off sufficiently with safety barrier during repair and access cannot be compromised.
-Outstanding conditions need to be satisfied pending Final.
08/31/2026 COT - HCBU - Building Final N/A Partial Pass 8/31/26: OKAY TO REQUEST LEVEL 4 TCO. PENDING CONDITIONS

Completed Inspections

Permit Status: Issued
Permit Number: TC-COM-0323-00868
Permit Description: NEW TRUCK TIRE AND LIGHT MECHANICAL MAINTENANCE FACILITY
Total Completed Inspections - 20
Date Description Inspector Results Comments
10/24/2025 COT - HCBU - Excavation/Rebar/Zoning Passed 10/24/25
Corrections made on the corners.
12/02/2025 COT - HCPL - Rough Soil Passed 12-2-25: underground plumbing verified under test and per plans. Okay to backfill with shading materials.
03/31/2026 COT - HCPL - Gas Pressure Test Passed 3-31-26: gas pressure test approved.
05/19/2026 COT - HCPL - Sewer Passed 5-19-26: final section of SDR35 PVC sewer pipe verified under test. Okay to backfill approximately 70' of open trench.
07/30/2026 BULD - Electrical Clearance Passed 7-30-26: okay to meter/energize system. ECO clearance issued to TEP.
08/20/2026 COT - HCPL - Plumbing Final Passed
08/20/2026 COT - HCEL - Electrical Final Passed
08/20/2026 COT - HCBU - Framing Passed
08/20/2026 COT - HCBU - Preslab Passed
08/20/2026 COT - HCEL - Electrical Intermediate Passed
08/25/2026 COT - HCPL - Backwater Valve Passed
08/25/2026 COT - HCEL - Grounding/Bonding Passed
08/25/2026 PDSD Heavy Commercial Building Division Pre-Construction Meeting Passed
08/25/2026 COT - HCPL - Yard Water Line Passed 8-25-26: main water line approved.
08/25/2026 COT - HCPL - Gas Final Passed 8-25-26: approved.
08/25/2026 COT - HCME - Venting Passed 8-25-26: venting approved.
08/25/2026 COT - HCEL - Electrical Underground Passed
08/26/2026 COT - FCON - Fire - Final Passed Per chris basadua this inspection passed the previous day.
08/31/2026 TRSP - ROW - Final/Close-Out Passed Job site is new building structure on private property with no impact to right of way, approved
08/31/2026 COT - HCME - Mechanical Final Passed