Permit Details

Status:
Issued
Type:
Commercial Building
Address NEW:
5590 E TRAVEL PLAZA WY
Apply Date:
03/23/2023
Applicant:
Charmalee Jayawardena
Description:
NEW TRUCK TIRE AND LIGHT MECHANICAL MAINTENANCE FACILITY

Permit Reviews

Permit Number - TC-COM-0323-00868
Permit Status: Issued
Permit Description: NEW TRUCK TIRE AND LIGHT MECHANICAL MAINTENANCE FACILITY
Start Date Submittal Complete Date Status  
07/21/2023 COMMERCIAL REVIEW - FULL v.2 07/21/2023 REQUIRES RESUBMIT Review Details
12/06/2023 RESTAMP - COMMERCIAL v.1 12/07/2023 APPROVED Review Details
06/05/2025 RESTAMP - COMMERCIAL v.1 06/06/2025 APPROVED Review Details
03/26/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/01/2025 APPROVED Review Details
07/29/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/01/2025 APPROVED Review Details
11/27/2023 COMMERCIAL REVIEW - FULL v.3 12/06/2023 APPROVED Review Details
11/20/2025 COMMERCIAL REVIEW - FULL v.3 12/12/2025 APPROVED Review Details
08/12/2026 RESTAMP - COMMERCIAL v.1 08/18/2026 APPROVED Review Details
05/01/2025 COMMERCIAL REVIEW - FULL REVISION v.1 05/23/2025 REQUIRES RESUBMIT Review Details
03/24/2023 COMMERCIAL REVIEW - FULL v.1 04/21/2023 REQUIRES RESUBMIT Review Details
09/29/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/29/2025 REQUIRES RESUBMIT Review Details
07/24/2023 COMMERCIAL REVIEW - FULL v.1 08/16/2023 REQUIRES RESUBMIT Review Details
09/25/2025 COMMERCIAL REVIEW - FULL v.2 09/26/2025 REQUIRES RESUBMIT Review Details
06/05/2025 COMMERCIAL REVIEW - FULL REVISION v.2 06/05/2025 APPROVED Review Details
10/31/2023 COMMERCIAL REVIEW - FULL v.2 11/22/2023 REQUIRES RESUBMIT Review Details
08/07/2025 COMMERCIAL REVIEW - FULL v.1 08/27/2025 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0323-00868
Permit Status: Issued
Permit Description: NEW TRUCK TIRE AND LIGHT MECHANICAL MAINTENANCE FACILITY
Total Outstanding Activity Conditions - 6
Date Name
11/13/2023 AIR BALANCING/COMMISSIONING REPORT IS REQUIRED.
11/13/2023 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
11/13/2023 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
11/13/2023 SPECIAL INSPECTION FOR OUTDOOR LIGHTING IS REQUIRED.
11/13/2023 Please submit a separate sign permit for an signs associated with this projet.
11/13/2023 Stair Designs must be submitted and approved prior to...

Conditions

Permit Number - TC-COM-0323-00868
Permit Status: Issued
Permit Description: NEW TRUCK TIRE AND LIGHT MECHANICAL MAINTENANCE FACILITY
Date Description Comments
07/28/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
06/06/2025 Prior to Issuance: This project requires issuance of a Development Package (DP) permit prior to issuance of this permit. Prior to TCO/Final: This project requires full completion of a Development Package (DP) permit prior to Temporary C of O and/or final completion this permit.
07/28/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
02/05/2025 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.
11/13/2023 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-COM-0323-00868
Permite Description: NEW TRUCK TIRE AND LIGHT MECHANICAL MAINTENANCE FACILITY
Total Outstanding Inspections - 9
Last Inspection Date Description Inspector Results Comments
11/26/2025 COT - HCPL - Rough Soil N/A Re-inspection required 11-26-25: city approved plans not on site-Reschedule inspection.
03/31/2026 COT - HCEL - Electrical Intermediate N/A Partial Pass 3-31-26: in wall rough electrical at room's 101, 104, 105, 106, 102, 103 verified per plans. Okay to continue with construction at progress areas.
04/07/2026 COT - HCME - Venting N/A Partial Pass 4-7-26: in wall DWV & domestic approved. Okay to drywall interior side at progress areas.
Note: drywall screw inspection at exterior walls with 1st layer of 5/8" approved. Okay to fire tape joints/seems. Take pictures of taping prior to installing 2nd layer of 5/8" drywall and text them to me. Screw inspection of plywood decking at mezzanine approved-okay to install 2nd layer.
04/09/2026 COT - HCPL - Gas Final N/A Partial Pass 4-9-26: pe gas pressure line for exterior equipment pad verified under test and per,plans. Okay to backfill approximately 10' of open trench using shading materials.
12/19/2025 COT - HCBU - Preslab N/A Re-inspection required 12/19/25: reinforcement at (3)interior spread footings must maintain 3" clearance from earth, all plumbing at slab must be wrapped to protect from concrete.
12/10/2025 COT - HCPL - Sewer N/A Not Ready Courtesy inspection. 12/10/2025
05/28/2026 COT - HCPL - Yard Water Line N/A Partial Pass 5-28-26: main water line verified under test at 80psi. Okay to backfill using shading materials.
06/02/2026 COT - HCBU - Framing N/A Partial Pass 6-2-26: HVAC/mechanical rough in at offices & restrooms approved. Okay to install ceiling tiles at progress areas . Also, inspected Air line pressure at 85psi.
07/20/2026 COT - HCPL - Plumbing Final N/A Partial Pass 7-20-26: no hot water & submit water sterilization/chlorination report to the city for review & approval.

Completed Inspections

Permit Status: Issued
Permit Number: TC-COM-0323-00868
Permit Description: NEW TRUCK TIRE AND LIGHT MECHANICAL MAINTENANCE FACILITY
Total Completed Inspections - 5
Date Description Inspector Results Comments
10/24/2025 COT - HCBU - Excavation/Rebar/Zoning Passed 10/24/25
Corrections made on the corners.
12/02/2025 COT - HCPL - Rough Soil Passed 12-2-25: underground plumbing verified under test and per plans. Okay to backfill with shading materials.
03/31/2026 COT - HCPL - Gas Pressure Test Passed 3-31-26: gas pressure test approved.
05/19/2026 COT - HCPL - Sewer Passed 5-19-26: final section of SDR35 PVC sewer pipe verified under test. Okay to backfill approximately 70' of open trench.
07/30/2026 BULD - Electrical Clearance Passed 7-30-26: okay to meter/energize system. ECO clearance issued to TEP.

Documents

File Name Document Type  
CONS-STMP_TUCSON_REVISION6_FULLSET_081225_V2.PDF DOCUMENTS VIEW
REVISION NARRATIVE 11-20-25_V2.PDF DOCUMENTS VIEW
13392-35971_DESIGN_CALCULATIONS_SIGNED_V1.PDF DOCUMENTS VIEW
13392-35971_FOR ERECTOR INSTALLATION_02.24.25_SIGNED_V1.PDF DOCUMENTS VIEW
13392-35971_LOC_SIGNED_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-STMP-TUCSON - REVISION -6-5-25_V2.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
SPECIAL INSPECTION FORM STMP TUCSON-2025-03-24_V1.PDF DOCUMENTS VIEW
STMP_TUCSON,AZ 11-27-23_V2.PDF DOCUMENTS VIEW
COMMENT RESPONSES-1_V1.PDF DOCUMENTS VIEW
STMP 0593 - TUCSON AZ - PRELIM REACT - 3 BAY_V1.PDF DOCUMENTS VIEW
STM PILOT - TUSCON, AZ - SIGNED_V1.PDF DOCUMENTS VIEW
STM PILOT TUCSON_STRUCTURAL CALCULATIONS_V1.PDF DOCUMENTS VIEW
COMMENT RESPONSES-1_V1.PDF DOCUMENTS VIEW
STM PILOT - TUSCON, AZ - SIGNED_V1.PDF DOCUMENTS VIEW
STM PILOT TUCSON_STRUCTURAL CALCULATIONS_V1.PDF DOCUMENTS VIEW
STMP 0593 - TUCSON AZ - PRELIM REACT - 3 BAY_V1.PDF DOCUMENTS VIEW