Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Inspection Status: Partial Pass

Inspection History: ENGR Engineering Final

Date Description Inspector Results Comments
08/26/2026 ENGR Engineering Final Partial Pass Site is complete except:
-Handicap ramp that accesses landscaped area on west side of site is being rebuilt so it complies.
- Section of asphalt patch over utility trench that settled on NE side of building.
Okay to apply for TCO level 4 while these 2 repairs are completed. These 2 areas need to be cordoned off sufficiently with safety barrier during repair and access cannot be compromised.
-Outstanding conditions need to be satisfied pending Final.