Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: TC-COM-0323-00868
Parcel: 14037068J

Review Status: Requires Resubmit

Review Details: BUILDING DEFERRED SUBMITTAL REVIEW v.1

Permit Number - TC-COM-0323-00868
Review Name: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
11/12/2026 Bldg Permits - Post Review Express PENDING ASSIGNMENT
11/12/2026 Stair Design (Deferred Submittal) Express REQUIRES RESUBMIT Please submit a complete set of revised/corrected documents and a written response addressing each review comment and explaining how it was resolved. The original submittal was incomplete, and additional comments may be issued upon subsequent review.
Please email me with any questions regarding the comments below: mark.masek@tucsonaz.gov
Comment 1. Please address and comply with the following requirements for the deferred submittal identified on Sheet S1.1 under the heading METAL STAIRS. IBC 107.3.4.1 Deferred submittals.
1. Fabricator shall retain a professional engineer licensed in the state of the project, to provide the design for all metal stairs, and railings, on the project. The design shall include a comprehensive engineering analysis that complies with the applicable building codes.
2. Fabricator shall submit shop drawings and design calculations for review prior to fabrication. Calculations shall bear the engineer’s stamp and signature
3. Fabrication. Calculations structural performance of stairs and railings: metal stairs shall be designed to conform to the international building code, latest edition, stair framing and landings shall be designed for 100 psf live load. Limit deflection of treads, platforms, and framing members to l/240 or 1/2 inch. Whichever is less
4. Additionally, Documents for deferred submittal items shall be submitted to the Registered Design Professional in Responsible Charge (Architect and/or Structural Engineer of Record) for review and approval. The design professional shall apply their shop drawing review stamp and forward the documents to the Building Official with a notation indicating that the deferred submittal documents have been reviewed and found to be in general conformance with the building design.
Comment 3. The stairway appears to have an open riser and the construction drawings indicate a closed riser please address.

Please contact me if you have any questions about the above comments.
Mark Masek
Plans Examiner – Building Safety
Planning and Development Services | City of Tucson
main 520.837.4994
email mark.masek@tucsonaz.gov
11/12/2026 PDSD Application Completeness Express REVIEW COMPLETED