Inspection Status: Partial Pass
Inspection History: COT - HCEL - Electrical Underground
| Date |
Description |
Inspector |
Results |
Comments |
| 08/25/2026 |
COT - HCEL - Electrical Underground |
|
Partial Pass |
8-25-26: Provide a concrete slab for a "Working Space Floor". Per NEC Section 110.26(A)(6), the floor, grade, or working platform directly in front of the electrical panel must be "as level and flat as practical" for the entire required depth and width of the workspace (typically 36 inches deep and 30 inches wide). |
| 08/25/2026 |
COT - HCEL - Electrical Underground |
|
Passed |
|