Permit: TC-COM-0226-00261
Permit Details
Status:
In Revision
Type:
Commercial Building
Address:
3430 E VALENCIA RD
Address NEW:
3430 E VALENCIA RD
Apply Date:
02/23/2026
Applicant:
Chris Ward
Description:
Proposed construction of a 162,240 sf SHELL ONLY/Speculative Building and associated site work (REV #1: REVISED ELECTRICAL ROOM & TRANSFORMER)
Permit Reviews
Permit Number - TC-COM-0226-00261
Permit Status: In revision
Permit Description: Proposed construction of a 162,240 sf SHELL ONLY/Speculative Building and associated site work (REV #1: REVISED ELECTRICAL ROOM & TRANSFORMER)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/27/2026 | COMMERCIAL REVIEW - FULL v.1 | 03/24/2026 | REQUIRES RESUBMIT |
| 11/05/2026 | COMMERCIAL REVIEW - FULL REVISION v.2 | N/A | IN REVIEW |
| 05/20/2026 | COMMERCIAL REVIEW - FULL v.3 | 05/28/2026 | REQUIRES RESUBMIT |
| 07/14/2026 | COMMERCIAL REVIEW - FULL v.5 | 07/29/2026 | APPROVED |
| 09/28/2026 | COMMERCIAL REVIEW - FULL REVISION v.1 | 10/20/2026 | REQUIRES RESUBMIT |
| 04/20/2026 | COMMERCIAL REVIEW - FULL v.2 | 05/12/2026 | REQUIRES RESUBMIT |
| 06/01/2026 | COMMERCIAL REVIEW - FULL v.4 | 06/01/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-COM-0226-00261
Permit Status: In revision
Permit Description: Proposed construction of a 162,240 sf SHELL ONLY/Speculative Building and associated site work (REV #1: REVISED ELECTRICAL ROOM & TRANSFORMER)
Total Outstanding Activity Conditions - 7
| Date | Name |
|---|---|
| 03/23/2026 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 03/23/2026 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 03/23/2026 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
| 03/23/2026 | SPECIAL INSPECTION FOR SPECIAL MOMENT RESISTING STEEL FRAMES IS REQUIRED. |
| 03/23/2026 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
| 05/27/2026 | SPECIAL INSPECTION FOR COLD FORM STEEL FRAMING IS REQUIRED. |
| 05/27/2026 | SPECIAL INSPECTION FOR WOOD FRAMING IS REQUIRED. |
Conditions
Permit Number - TC-COM-0226-00261
Permit Status: In revision
Permit Description: Proposed construction of a 162,240 sf SHELL ONLY/Speculative Building and associated site work (REV #1: REVISED ELECTRICAL ROOM & TRANSFORMER)
| Date | Description | Comments |
|---|---|---|
| 02/27/2026 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 02/27/2026 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 03/23/2026 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. |
Outstanding Inspections
Permit Status: In Revision
Permit Number: TC-COM-0226-00261
Permite Description: Proposed construction of a 162,240 sf SHELL ONLY/Speculative Building and associated site work (REV #1: REVISED ELECTRICAL ROOM & TRANSFORMER)
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/28/2026 | BULD - Electrical Clearance | N/A | Re-inspection required | 8-28-26: contractor requested temp power. Please submit an electrical site plan to the city for review & approval. 2 layers of felt paper are required behind panel, label breakers, and install a weather resistant gfci at panel. |
| 09/09/2026 | COT - LCPL - Rough Soil | N/A | Partial Pass | 9-9-26: underground plumbing verified under test and per floor plumbing plan-P1.0. Correct number of clean outs together with tracer wire for underground plumbing outside of slab. Okay to backfill using shading materials. |
| 09/24/2026 | COT - LCEL - Electrical Underground | N/A | Partial Pass | 9/24/2026 Partial pass. All Conduit in place. Schedule 40 for Two services. Ones the original and Future secondaries in place at equipment area. (Electrical room) Okay to backfill progress areas. |
| 10/06/2026 | COT - LCBU - Preslab | N/A | Re-inspection required | 10/6/26: pre slab it not ready- missing rebar at corners and reinforcement spacing for slab on grade at several areas is not per plans-add reinforcement where spacing is more than 18' o.c., provide a report together with photos with chairs every 4' o.c, a vapor barrier is required at areas having flooring. Reschedule inspection when ready. |
| 11/03/2026 | COT - HCBU - Excavation/Rebar/Zoning | N/A | Partial Pass | 11/3/26: partial pass for panel reinforcement. Panels 1, 7-21, 70, 71, 72, 73 are approved for concrete placement. |