Inspection Status: Partial Pass
Inspection History: COT - LCEL - Electrical Underground
| Date |
Description |
Inspector |
Results |
Comments |
| 09/09/2026 |
COT - LCEL - Electrical Underground |
|
Partial Pass |
9-9-26: 2 separate trenches each containing 2-4" & 4-2" Schedule 40 electrical secondary conduits stemming from electrical room in a northern direction. Okay to backfill approximately 130' of trenches using shading materials. |
| 09/24/2026 |
COT - LCEL - Electrical Underground |
|
Partial Pass |
9/24/2026 Partial pass. All Conduit in place. Schedule 40 for Two services. Ones the original and Future secondaries in place at equipment area. (Electrical room) Okay to backfill progress areas. |