Permit: TC-COM-0226-00261

Parcel: 140410070


Addresses:

3430 E VALENCIA RD

Inspection Status: Partial Pass

Inspection History: COT - HCBU - Excavation/Rebar/Zoning 

Date Description Inspector Results Comments
09/24/2026 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass 9/24/2026 Partial pass. Total of 44 spread footers. On grid lines B-E columns 2-12. Approved. Okay for concrete placement.
09/25/2026 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass 9/25/26: reinforcement on footing at GL: A/2-4 approved per S2.0/Detail 3. Okay for concrete placement.
10/01/2026 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass
10/08/2026 COT - HCBU - Excavation/Rebar/Zoning  Not Ready
10/09/2026 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass 10/9/26: properly compact pad at conduit areas along south end. Reinforcement at G/L:A-F/10-4 verified per plans. Okay for concrete at own risk.
10/09/2026 COT - HCBU - Excavation/Rebar/Zoning  Re-inspection required
10/13/2026 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass 10/13/26: reinforcement/pre slab for remaining slab on grade on east side from G/L: A-F/1-4 verified per plans. Okay for concrete placement.
10/28/2026 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass 10/28/2026 Partial pass. This is for panel rebar. Panels 52-69,2-6,10-12. Approved. Okay for concrete placement.
11/03/2026 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass 11/3/26: partial pass for panel reinforcement. Panels 1, 7-21, 70, 71, 72, 73 are approved for concrete placement.