Permit: T22CM02647
Permit Details
Apply Date:
04/12/2022
Applicant:
Al Gastelum
Description:
New construction Adult Day Care Facility 6080 sf
Permit Reviews
Permit Number - T22CM02647
Permit Status: Complete
Permit Description: New construction Adult Day Care Facility 6080 sf
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/12/2022 | COMMERCIAL - BLDG/FIRE/ZONING/ENG | 05/26/2022 | COMPLETED |
| 08/07/2022 | RESUBMITTAL | 09/07/2022 | COMPLETED |
| 03/24/2023 | COMMERCIAL REVIEW - FULL v.3 | 03/29/2023 | APPROVED |
| 04/01/2024 | COMMERCIAL REVIEW - FULL v.1 | 04/01/2024 | REQUIRES RESUBMIT |
| 11/23/2022 | COMMERCIAL REVIEW - FULL v.1 | 01/03/2023 | REQUIRES RESUBMIT |
| 04/17/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 04/21/2025 | APPROVED |
| 02/06/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 02/11/2025 | APPROVED |
| 04/09/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/10/2025 | APPROVED |
| 04/14/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/14/2025 | REQUIRES RESUBMIT |
| 04/02/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/03/2025 | APPROVED |
| 01/28/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/31/2025 | REQUIRES RESUBMIT |
| 03/01/2023 | COMMERCIAL REVIEW - FULL v.2 | 03/20/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - T22CM02647
Permit Status: Complete
Permit Description: New construction Adult Day Care Facility 6080 sf
| Date | Description | Comments |
|---|---|---|
| 03/16/2023 | AIR BALANCING/COMMISSIONING REPORT IS REQUIRED. | |
| 03/16/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. | |
| 03/16/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 03/16/2023 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. | |
| 03/16/2023 | SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED. | |
| 03/16/2023 | Exterior Doors Designs must be submitted and approved prior to final. | |
| 02/06/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 03/16/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 03/16/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. | |
| 03/16/2023 | WATER STERILIZATION REPORT IS REQUIRED. | |
| 03/16/2023 | SPECIAL INSPECTION FOR WOOD FRAMED DIAPHRAGMS AND SHEAR WALLS IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22CM02647
Permite Description: New construction Adult Day Care Facility 6080 sf
Total Outstanding Inspections - 6
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/22/2023 | COT - HCPL - Sewer | N/A | Partial Pass | 12/22/23 partial for sewer to property line, HCS to go, ok to cover |
| 09/20/2023 | COT - LCPL - Rough Soil | N/A | Partial Pass | 9/20/23: ok to back fill. Future plumbing line that was ran and capped off will need to be added to revision |
| 04/04/2025 | COT - HCBU - TCO | N/A | Not Applicable | |
| 04/04/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| COT - FCON - Fire - Final | N/A | Not Ready | ||
| 03/27/2024 | COT - HCBU - Interior Shear Bracing | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM02647
Permit Description: New construction Adult Day Care Facility 6080 sf
Total Completed Inspections - 30
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/03/2023 | COT - LCBU - Excavation/Rebar/Zoning | Passed | 10/3/23: reinforcement and holdowns per plan | |
| 10/03/2023 | COT - LCBU - Preslab | Passed | 10/3/23: reinforcement and holdowns per plan | |
| 11/21/2023 | COT - HCBU - Roof Nailing | Passed | ||
| 11/30/2023 | COT - HCBU - Exterior Clips/Sheathing | Passed | 11/21/23 block upper cord of trusses at glue lam beam and install hold downs per plan at back of house 11/30/23: corrections made. Ok to proceed |
|
| 01/12/2024 | COT - LCPL - Yard Water Line | Passed | 1/12/24: Mail water line passed ok to backfill | |
| 03/27/2024 | COT - HCME - Mechanical Intermediate | Passed | ||
| 03/27/2024 | COT - HCBU - Building Progress | Passed | ||
| 03/27/2024 | COT - HCME - Mechanical Above Ceiling | Passed | ||
| 03/27/2024 | COT - HCEL - Electrical Progress | Passed | ||
| 04/09/2024 | COT - HCEL - Electrical Above Ceiling | Passed | ||
| 04/09/2024 | COT - HCPL - Plumbing Above Ceiling | Passed | ||
| 04/09/2024 | COT - HCEL - Electrical Intermediate | Passed | ||
| 04/09/2024 | COT - LCBU - Framing | Passed | ||
| 04/09/2024 | COT - HCPL - Plumbing Intermediate | Passed | ||
| 04/09/2024 | COT - HCBU - Building Above Ceiling | Passed | ||
| 01/17/2025 | COT - HCEL - Electrical Underground | Passed | ||
| 01/17/2025 | COT - HCEL - Outdoor Lighting | Passed | ||
| 01/17/2025 | COT - HCME - Mechanical Progress | Passed | ||
| 01/17/2025 | COT - HCPL - Plumbing Progress | Passed | ||
| 01/17/2025 | COT - HCPL - Sewer | Passed | ||
| 01/17/2025 | COT - LCPL - Plumbing Roof Drains | Passed | ||
| 01/17/2025 | COT - LCPL - Sewer | Passed | ||
| 01/17/2025 | COT - LCPL - Rough Soil | Passed | ||
| 04/04/2025 | COT - LCPL - Plumbing Final | Passed | ||
| 04/04/2025 | COT - LCEL - Electrical Final | Passed | ||
| 04/04/2025 | COT - LCME - Mechanical Final | Passed | ||
| 04/07/2025 | COT - FCON - Fire - Final | Passed | ||
| 04/09/2025 | COT - LCBU - Building Final | Passed | 4/4/25: pending fire, row and conditions 4/9/25: pending engineering final and conditions |
|
| 04/09/2025 | ENGR Engineering Final | Passed | ||
| 04/09/2025 | TRSP - ROW - Final/Close-Out | Passed |