Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T22CM02647
Parcel: 13819039A

Address:
402 W MEDINA RD

Review Status: Completed

Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG

Permit Number - T22CM02647
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
04/21/2022 STEVE SHIELDS ZONING REVIEW Reqs Change ZONING REVIEW TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT:
T22CM02647
402 W Medina Rd - R-1 – DP21-0313
Adult Day Care (1st Review)

TRANSMITTAL: April 21, 2022

This site is located in the R-1 zone (UDC 4.7.8). Adult Day Care is a permitted use in this zone (Table 4.8-2) subject to Use Specific Standards 4.9.4.B.1

1. Zoning has reviewed the building plans for compliance with DP21-0313 and although it appears that the plans are in compliance until the DP is approved by all review agencies Zoning cannot approve the building plans.

If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov.
04/21/2022 SSHIELD1 COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Completed
04/26/2022 SAFEBUILT 2ND PARTY REVIEW REVIEW Reqs Change Activity Number: T22CM02647

GENERAL:
Provide written responses to all review comments.
Provide a complete plan set.
Provide additional documents as requested by review staff.


STRUCTURAL REVIEW COMMENTS:
Denied
1. Provide Geotechnical Report for the proposed building per International Building Code 2018, Section 1803.1.
2. Provide schedule of special inspections as required in IBC Section 1705.
3. Structural steel, components and fasteners for the roof screen are to be protected against corrosion in accordance with AISC 360 Section B.13 as indicated in IBC 2018 Section 2203.1.
4. Designer is to coordinate venting and drainage hole requirements for HSS tube members that are galvanized using the hot-dip galvanizing process. Provide for plugs as needed.
AWS D-19.0 calls for welds on galvanized steel to be free of zinc. Field welds on galvanized parts requires the removal of the zinc coating in the area of weld. Provide zinc paint (approved by the galvanizer) and apply as required to the weld and steel area to provide protection.
1. Locate Shear Walls SW1 & SW2 on Plan as called out on Shear Walls Schedule.
2. DEFERRED SUBMITTAL REQUIREMENTS
Structural general notes are to include any components of the building that may be considered deferred submittals. IBC
Section 107.3.4.1 requires deferred submittals to be approved by the building official.
If items will be deferred the plans are to clearly note the following per IBC Section 107.3.4.1:
* To be reviewed by design professional in responsible charge.
* Design professional shall affix a notation that the deferred items are in general conformance with their design of the building.
* They shall be submitted for review by the building official.
* Shall not be installed until approved by building official.
Submit a response letter addressing these correction items and provide bubbles on the revisions to the drawings.


BUILDING REVIEW COMMENTS:
Denied
1. Provide a Building Code Data Legend . Include the following code information for the building proposed:
Occupancy Classification(s)
For Mixed Occupancy Buildings, state whether the “non-separated” or “separated” option was chosen from Sections 508.3 / 508.4.
Description of Use
Type of Construction
Sprinklers:
Allowable and Actual Stories
Allowable and Actual Height
Allowable and Actual Floor Area
Occupant Load Calculations
Justification to exceed allowable area in Table 503 (if applicable)
Justification to exceed allowable height or stories in Table 503 (if applicable)
1. Provide a list of deferred submittals.
2. Provide a thorough egress plan that indicates all exits, travel distances, exit signage, furniture plan and any other applicable requirements.
3. Provide required plumbing fixture calculations.
4. The water fountain reduces the required width of egress and accessible paths more than the permitted amount. Remove or relocate the water fountain in accordance with Section 1003.3.3. and 1003.3.4.
5. The water fountain does not meet the accessibility requirements of Section 1109.5.1. Provide all detailed drawings for the water fountain.
6. The water fountain does not have the proper clear floor space provided in accordance with Section 602.2 and 305 of ANSI A117.1.
7. Provide enlarged dimensioned plans for toilet rooms #1 and #2.
8. Provide clarification as to why a shower is provided for the women's toilet and not the men's.
9. Provide a full specification manual for the project.
10. Additional exit signage is required on the RCP in accordance with Section 1013. There are no exit signs indicating the main exit.
11. Indicate the location of all required egress illumination in accordance with Section 1008.
12. Sheet A6: The clear floor space required for the toilets are incorrect. Provide a properly sized clear floor spaces for the toilets in accordance with Section 604.3.1 of ANSI A117.1.
13. Due to be provided incomplete plan additional comment may occur once all information is provided.


MECHANICAL REVIEW COMMENTS:
Denied
1. A level working platform shall be provided for appliances installed in an approved manner on roof's having a slope of 3 units vertical in 12 units horizontal sheet M3 (IMC2018,306.5.1)
2. Provide mechanical roof plan (IMC2018,106.3.1)
3. Provide an approved ventilation calculation table. (i.g. the total area for this building is 6,080 square feet, the total area your providing in your table is 5,300 square feet, your missing 78 square feet, also your lumping all the rooms as offices, when you got different rooms that must be calculated as different occupancies with different CFM requirements than an office. for example a dining room, Zuma room, sleeping room requires different outside air than an office and they must be listed accordingly sheet M4 (IMC2018,106.3.1)
4. Public restrooms require 70 cfm of exhaust air you got 60 cfm and you dont specify if it is continuous or intermittent exhaust sheet M4 (IMC2018,403.3.1.1)


ELECTRICAL REVIEW COMMENTS
Denied
E-1:
Need to provide interior lighting Comcheck to show compliance with IECC 2018.
Need to provide exterior lighting calculations for average site lighting illumination.
E-2:
Need to show meter location, typically right next to service panel.
Should explicitly call out AC units 1-3 with note that they are located on roof (with receptacle).
E-3:
Need to show/provide a grounding information with grounding conductor size.
Need to provide panel load calculation to prove panel size is adequate (this in typically lower than connected load). Should use NEC 220 branch circuit calculations for reference.
Would suggest to provide a 42 CB panel.


PLUMBING REVIEW COMMENTS:
Denied
First Plumbing Review:
1). The required Adult daycare shower would need to be available to all, the shower shown on plan pages A1, P1, & P2 show the only available shower in the womens restroom? -IPC 403.1
2). Add scupper sizing calculations to plan page A5 - IPC 1106.1, 1106.5
3). Label the secondary the required secondary scuppers on plan page A5 -IPC 1108
4). Do the scuppers have downspouts? if yes illustrate to termination point with sizes & calculations. -IPC 1106.3
5). Sanitary plan page P2 riser diagram is missing the office rest room & P7 high/Low drinking fountain. -IPC 106.3.1
6). P8 sink on plan pages P1 & p2 can't drain thru toilet/Lav vertical wet vent, P8 sink will need to tie in downstream. -IPC 912.1.1
7). Hot water system will require an recirculating pump & hot return line update plan page P1 piping plan & water heater detail. -IPC 607.2
8). Hose Bibs on plan page P1 need shut off valves -IPC 606.2
9). P3A urinal, P8 sink P2 toilet, & P6 lav missing from Plan page P2 fixture schedule. -IPC 303
10). illustrate AC condensate to its termination point on the plumbing plans. -IPC section 314


If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov
04/27/2022 JPEELDA1 FIRE REVIEW Reqs Change Denied
1. Provide a Building Code Data Legend . Include the following code information for the building proposed:
Occupancy Classification(s)
For Mixed Occupancy Buildings, state whether the “non-separated” or “separated” option was chosen from Sections 508.3 / 508.4.
Description of Use
Type of Construction
Sprinklers:
Allowable and Actual Stories
Allowable and Actual Height
Allowable and Actual Floor Area
Occupant Load Calculations
Justification to exceed allowable area in Table 503 (if applicable)
Justification to exceed allowable height or stories in Table 503 (if applicable)
1. Provide a list of deferred submittals.
2. Provide a thorough egress plan that indicates all exits, travel distances, exit signage, furniture plan and any other applicable requirements.
05/04/2022 ROBERT SHERRY WATER REVIEW Reqs Change Show the location of the proposed water meter, backflow preventer, and the water service pipe on a site plan. Provide the size of the water meter serving this building, the size of the reduced pressure backflow preventer associated with the water meter, and the total water demand served by the water meter. Reference: Section 107.2.1 and 107.2.6, IBC 2018.
05/26/2022 SSHIELD1 ENGINEERING REVIEW Reqs Change See Zoning comments

Final Status

Task End Date Reviewer's Name Type of Review Description
05/26/2022 VVERA1 OUT TO CUSTOMER Completed