Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - LCPL - Plumbing Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/12/2024 | COT - LCPL - Plumbing Final | Partial Pass | 1/12/24: Mail water line passed ok to backfill | |
| 01/17/2025 | COT - LCPL - Plumbing Final | Re-inspection required | 1/12/24: Mail water line passed ok to backfill 1/17/25: ADA restrooms must be complete for final, receptacles at dining and prep counter must be GFCI, all exterior plastic piping must be coated for uv protection, conditions must be satisfied prior to final, (Fire,Engineering, R.O.W) must be passed prior to final. |
|
| 01/28/2025 | COT - LCPL - Plumbing Final | Not Ready | 1/12/24: Mail water line passed ok to backfill 1/17/25: ADA restrooms must be complete for final, receptacles at dining and prep counter must be GFCI, all exterior plastic piping must be coated for uv protection, conditions must be satisfied prior to final, (Fire,Engineering, R.O.W) must be passed prior to final. 1/28/25: not ready |
|
| 03/26/2025 | COT - LCPL - Plumbing Final | Not Ready | ||
| 04/04/2025 | COT - LCPL - Plumbing Final | Passed |