Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T21CM09775
Permit Details
Apply Date:
12/21/2021
Applicant:
Description:
Proposed construction of a 67,600sf shell building and associated site work.
Permit Reviews
Permit Number - T21CM09775
Permit Status: Issued
Permit Description: Proposed construction of a 67,600sf shell building and associated site work.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/18/2022 | RESUBMITTAL | 04/14/2022 | COMPLETED |
05/13/2022 | RESUBMITTAL | 05/31/2022 | COMPLETED |
06/04/2022 | RESUBMITTAL | 07/06/2022 | COMPLETED |
07/21/2022 | RESUBMITTAL | 08/01/2022 | COMPLETED |
12/21/2021 | COMMERCIAL - BLDG/FIRE/ZONING/ENG | 02/02/2022 | COMPLETED |
10/23/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/24/2024 | APPROVED |
07/09/2024 | RESTAMP - COMMERCIAL v.1 | 07/15/2024 | APPROVED |
01/16/2025 | COMMERCIAL REVIEW - FULL v.1 | 02/06/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - T21CM09775
Permit Status: Issued
Permit Description: Proposed construction of a 67,600sf shell building and associated site work.
Total Outstanding Activity Conditions - 12
Date | Name |
---|---|
11/04/2024 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. |
11/04/2024 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. |
11/04/2024 | SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED. |
11/04/2024 | SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. |
11/04/2024 | SPECIAL INSPECTION FOR SPECIAL MOMENT-RESISTING CONCRETE FRAME IS REQUIRED. |
11/04/2024 | Curtain Walls Designs must be submitted and approved prior to final. |
11/04/2024 | Please submit a separate sign permit for an signs associated with this projet. |
11/04/2024 | Separate TFD permits are required for: Fire Alarm |
11/04/2024 | Separate TFD permits are required for: Fire Protection |
11/04/2024 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. |
11/04/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
11/04/2024 | SPECIAL INSPECTION FOR WOOD FRAMED DIAPHRAGMS AND SHEAR WALLS IS REQUIRED. |
Conditions
Permit Number - T21CM09775
Permit Status: Issued
Permit Description: Proposed construction of a 67,600sf shell building and associated site work.
Date | Description | Comments |
---|---|---|
06/10/2024 | Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512 to confirm Building Unit Numbers. | |
06/15/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
06/10/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
07/15/2024 | Prior to Issuance: This project requires issuance of a Development Package (DP) permit prior to issuance of this permit. Prior to TCO/Final: This project requires full completion of a Development Package (DP) permit prior to Temporary C of O and/or final completion this permit. | |
06/10/2024 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. |
Outstanding Inspections
Permit Status: Issued
Permit Number: T21CM09775
Permite Description: Proposed construction of a 67,600sf shell building and associated site work.
Total Outstanding Inspections - 33
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | COT - LCPL - Gas Pressure Test | N/A | Not Ready | |
10/26/2022 | COT - LCBU - Building Above Ceiling | N/A | Not Ready | |
10/26/2022 | COT - LCEL - Electrical Progress | N/A | Not Ready | |
10/27/2022 | COT - LCBU - Building Final | N/A | Not Ready | |
10/26/2022 | COT - LCEL - Electrical Intermediate | N/A | Not Ready | |
10/27/2022 | COT - LCBU - Framing | N/A | Not Ready | |
10/26/2022 | COT - LCEL - Electrical Underground | N/A | Not Ready | |
10/26/2022 | COT - LCPL - Plumbing Progress | N/A | Not Ready | |
10/26/2022 | COT - LCME - Mechanical Above Ceiling | N/A | Not Ready | |
10/26/2022 | COT - LCME - Mechanical Progress | N/A | Not Ready | |
10/26/2022 | COT - LCBU - Firewall/Fire Barrier/Firestop | N/A | Not Ready | |
10/26/2022 | COT - FCON - Underground Flush | N/A | Not Ready | |
10/26/2022 | COT - LCEL - Outdoor Lighting | N/A | Not Ready | |
10/26/2022 | COT - LCBU - Preslab | N/A | Not Ready | |
10/27/2022 | COT - LCPL - Plumbing Intermediate | N/A | Not Ready | |
10/26/2022 | COT - FCON - Alarm - Final | N/A | Not Ready | |
10/27/2022 | COT - LCEL - Electrical Final | N/A | Not Ready | |
10/26/2022 | COT - FCON - Sprinkler - Final | N/A | Not Ready | |
10/26/2022 | COT - LCBU - Exterior Clips/Sheathing | N/A | Not Ready | |
10/26/2022 | COT - LCBU - Sustainability | N/A | Not Ready | |
10/26/2022 | COT - LCPL - Rough Soil | N/A | Not Ready | |
10/26/2022 | COT - FCON - Fire - Final | N/A | Not Ready | |
10/26/2022 | COT - LCEL - Electrical Above Ceiling | N/A | Not Ready | |
10/26/2022 | COT - LCME - Mechanical Intermediate | N/A | Not Ready | |
10/26/2022 | COT - LCBU - Roof Nailing | N/A | Not Ready | |
10/26/2022 | FCON – OH Piping & Hydro | N/A | Not Ready | |
10/26/2022 | COT - LCBU - Building Progress | N/A | Not Ready | |
10/26/2022 | COT - FCON - Underground Pressure | N/A | Not Ready | |
10/26/2022 | COT - LCPL - Backwater Valve | N/A | Not Ready | |
10/26/2022 | COT - LCME - Mechanical Final | N/A | Not Ready | |
10/26/2022 | COT - LCPL - Plumbing Final | N/A | Not Ready | |
02/13/2025 | COT - LCBU - Excavation/Rebar/Zoning | N/A | Partial Pass | 2/13/25: footing 3 at GL B-C/6 reinforced per plan ok to proceed. |
02/13/2025 | COT - LCPL - Sewer | N/A | Partial Pass | 2/7/25: partial pass for underground sewer 200' run ok to backfill at risk. Pressure test will be conducted once sewer system is complete 2/11/25: partial pass for underground sewer north end of project 450'. Backfill at risk shading required. Air pressure test required 2-12-25, partial pass for underground sewer approximately 100 ft run on northwest quad- backfill at own risk. Air pressure required once sewer system is complete. 2/13/25: sewer run complete. backfill at own risk. Air pressure required |