Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T21CM09775

Parcel: 140260390

Inspection Status: Not Ready

Inspection History: COT - LCEL - Electrical Underground 

Permit Number - T21CM09775

Inspection Description - COT - LCEL - Electrical Underground 

Inspection Status - Not Ready

Date Description Inspector Results Comments
10/26/2022 COT - LCEL - Electrical Underground  Not Ready
03/11/2025 COT - LCEL - Electrical Underground  Partial Pass 3/11/25: (11) SCH 40 4" conduit stubbing out from MS1 10' running towards building 2 ok to backfill progress area. (4) SCH 40 4" from low voltage stubbing out
03/14/2025 COT - LCEL - Electrical Underground  Partial Pass 3-14-25, 5-SCH 40-1 1/2" conduits for fire pump room and panel verified per plans. Okay to backfill at progress areas.
03/18/2025 COT - LCEL - Electrical Underground  Not Ready 3-18-25, not ready
04/15/2025 COT - LCEL - Electrical Underground  Partial Pass 3/11/25: (11) SCH 40 4" conduit stubbing out from MS1 10' running towards building 2 ok to backfill progress area. (4) SCH 40 4" from low voltage stubbing out 10'
3-14-25, 5-SCH 40-1 1/2" conduits for fire pump room and panel verified per plans. Okay to backfill at progress areas.
3-18-25, not ready
4/15/25: electrical underground for 3 light pole bases on south east side of project approved to backfill. Ok to proceed
11/06/2025 COT - LCEL - Electrical Underground  Passed 11-6-25: electrical underground approved.