Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - LCPL - Sewer
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2022 | COT - LCPL - Sewer | Not Ready | ||
| 02/13/2025 | COT - LCPL - Sewer | Partial Pass | 2/7/25: partial pass for underground sewer 200' run ok to backfill at risk. Pressure test will be conducted once sewer system is complete 2/11/25: partial pass for underground sewer north end of project 450'. Backfill at risk shading required. Air pressure test required 2-12-25, partial pass for underground sewer approximately 100 ft run on northwest quad- backfill at own risk. Air pressure required once sewer system is complete. 2/13/25: sewer run complete. backfill at own risk. Air pressure required |
|
| 11/06/2025 | COT - LCPL - Sewer | Re-inspection required | 11-6-25: air pressure test required from the 2-way clean outside of building and tested up to the HCS connection point. | |
| 12/11/2025 | COT - LCPL - Sewer | Passed | 12-11-25: air test verified on entire sewer run at 4psi. |