Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - LCBU - Preslab
Permit Number - T21CM09775
Inspection Description - COT - LCBU - Preslab
Inspection Status - Not Ready
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2022 | COT - LCBU - Preslab | Not Ready | ||
| 10/26/2022 | COT - LCBU - Preslab | Not Ready | ||
| 03/11/2025 | COT - LCBU - Preslab | Partial Pass | 2/13/25: footing 3 at GL B-C/6 reinforced per plan ok to proceed. 2/11/25: 16 spread footers reinforced per plan. Ok to proceed 2/13/25: Footing 3 per plan at GL B-C/6 ok to proceed with concrete placement. 2/14/25: Building 1 continuous footer (F5) reinforcement per plan from GL D/9-15, A.5-D/15. 2/19/25: Building 1 continuous footer (F5) reinforcement per plan from GL D/9-1, C-D/1. 2/27/25: reinforcement per plan at continuous footers on GL A-D/1 and D/1-3. 3-6-25, #5 rebar missing at columns-grid line A-D/5-10. Reinspection required. Note: please schedule all future inspections on Building 1 under Building 1 3/11/25: reinforcement per plans at slab on grade at GL A-D/5-10 building |
|
| 11/06/2025 | COT - LCBU - Preslab | Passed | 11-6-25: approved. | |
| 11/06/2025 | COT - LCBU - Preslab | Passed | 11-6-25: preslab approved. |