Permit: T21CM09775

Parcel: 140260390

Inspection Status: Not Ready

Inspection History: COT - LCBU - Preslab  

Permit Number - T21CM09775

Inspection Description - COT - LCBU - Preslab  

Inspection Status - Not Ready

Date Description Inspector Results Comments
10/26/2022 COT - LCBU - Preslab   Not Ready
10/26/2022 COT - LCBU - Preslab   Not Ready
03/11/2025 COT - LCBU - Preslab   Partial Pass 2/13/25: footing 3 at GL B-C/6 reinforced per plan ok to proceed.
2/11/25: 16 spread footers reinforced per plan. Ok to proceed
2/13/25: Footing 3 per plan at GL B-C/6 ok to proceed with concrete placement.
2/14/25: Building 1 continuous footer (F5) reinforcement per plan from GL D/9-15, A.5-D/15.
2/19/25: Building 1 continuous footer (F5) reinforcement per plan from GL D/9-1, C-D/1.
2/27/25: reinforcement per plan at continuous footers on GL A-D/1 and D/1-3.

3-6-25, #5 rebar missing at columns-grid line A-D/5-10. Reinspection required.
Note: please schedule all future inspections on Building 1 under Building 1
3/11/25: reinforcement per plans at slab on grade at GL A-D/5-10 building
11/06/2025 COT - LCBU - Preslab   Passed 11-6-25: approved.
11/06/2025 COT - LCBU - Preslab   Passed 11-6-25: preslab approved.