Permit Details

Status:
In Review
Type:
Commercial Building
Address:
5736 S 12TH AV
Address NEW:
5736 S 12TH AV
Apply Date:
06/15/2021
Applicant:
burak bekat
Description:
TI: BAKERY ADDITIONAL 45 SFTO BUILDING

Permit Reviews

Permit Number - T21CM04975
Permit Status: In review
Permit Description: TI: BAKERY ADDITIONAL 45 SFTO BUILDING
Start Date Submittal Complete Date Status  
06/02/2022 REVISION - - 1ST 06/07/2022 COMPLETED Review Details
06/15/2021 COMMERCIAL - BLDG/FIRE/ZONING/ENG 07/22/2021 COMPLETED Review Details
09/10/2021 RESUBMITTAL 10/19/2021 COMPLETED Review Details
09/14/2022 REVISION - - 2ND 09/19/2022 COMPLETED Review Details
09/29/2022 REVISION - - 2ND 10/14/2022 COMPLETED Review Details
11/30/2021 RESUBMITTAL 12/07/2021 COMPLETED Review Details
03/18/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/18/2024 APPROVED Review Details
03/26/2026 SPECIAL INSPECTION REVIEW v.1 03/27/2026 REQUIRES RESUBMIT Review Details
04/02/2026 SPECIAL INSPECTION REVIEW v.2 N/A IN REVIEW Review Details

Outstanding Activity Conditions

Permit Number - T21CM04975
Permit Status: In review
Permit Description: TI: BAKERY ADDITIONAL 45 SFTO BUILDING
Total Outstanding Activity Conditions - 5
Date Name
03/27/2026 WATER STERILIZATION REPORT IS REQUIRED.
09/16/2021 SPECIAL INSPECTION FOR CONCRETE IS REQUIRED..
09/16/2021 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
09/16/2021 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.
09/16/2021 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.

Outstanding Inspections

Permit Status: In Review
Permit Number: T21CM04975
Permite Description: TI: BAKERY ADDITIONAL 45 SFTO BUILDING
Total Outstanding Inspections - 18
Last Inspection Date Description Inspector Results Comments
11/04/2022 COT - LCBU - Building Above Ceiling N/A Canceled Inspection Canceled
11/04/2022 COT - LCPL - Plumbing Progress N/A Canceled Inspection Canceled
11/04/2022 COT - LCBU - Exterior Clips/Sheathing N/A Canceled Inspection Canceled
11/04/2022 COT - HCBU - Interior Shear Bracing N/A Canceled Inspection Canceled
04/06/2023 COT - LCPL - Plumbing Intermediate N/A Not Ready New framing revision not on site, truss calcs not on site, gas test not ready, ABS vent scheduled to be rerouted. Not ready!
08/11/2023 COT - HCBU - Excavation/Rebar/Zoning N/A Not Ready
07/20/2023 COT - LCBU - Building Progress N/A Not Ready
08/16/2023 COT - LCBU - Preslab N/A Partial Pass for back landing
07/28/2023 COT - LCEL - Electrical Above Ceiling N/A Not Ready
08/08/2023 COT - LCEL - Electrical Intermediate N/A Partial Pass please install bond bushings at all panels and boxes
07/28/2023 COT - LCME - Mechanical Above Ceiling N/A Not Ready
07/26/2024 COT - FCON - Fire - Final N/A Partial Pass Address, suite numbers, fire extinguishers mounted.
07/28/2023 COT - LCME - Mechanical Intermediate N/A Not Ready
07/26/2024 COT - LCBU - Building Final N/A Re-inspection required Partial pending other inspections. 7/26/2024
ADA grab bars are too high along with the mirror.
06/18/2024 COT - LCEL - Outdoor Lighting N/A Not Ready 1/17/24: permit extension
6/18/24: permit extension not ready
07/26/2024 COT - LCEL - Electrical Final N/A Re-inspection required Provide covers for knockouts at shell building add labels to blanks on j boxes. Print panel schedules. 7/26/2024
06/18/2024 COT - LCME - Mechanical Final N/A Not Ready 1/17/24: permit extension
6/18/24: permit extension not ready
06/18/2024 COT - LCPL - Plumbing Final N/A Not Ready 1/17/24: permit extension
6/18/24: permit extension

Completed Inspections

Permit Status: In Review
Permit Number: T21CM04975
Permit Description: TI: BAKERY ADDITIONAL 45 SFTO BUILDING
Total Completed Inspections - 26
Date Description Inspector Results Comments
02/15/2023 COT - HCPL - Rough Soil Passed All underground plumbing is complete and holding water for the water test. Okay to backfill and re-pour concrete slab.
04/10/2023 COT - LCPL - Gas Pressure Test Passed Gas lines are holding 15# of compressed air for 8+ hours.
01/17/2024 COT - BULD - SWG Clearance Passed Gas lines are holding 15# of compressed air for 8+ hours.
04/10/2023 COT - LCPL - Plumbing Intermediate Passed 4-10-23: Plumbing rough in is complete. Okay to insulate and sheet rock walls.
04/10/2023 COT - LCBU - Framing Passed 4-10-23: Metal stud framing is complete. Truss calf's are on-site. Metal stud has been reinforced at 3" vent stack in bathroom. Gas lines are holding 15# of compressed air. Electrical rough in in framed walls is complete.
04/10/2023 COT - LCBU - Roof Nailing Passed 4-10-23: Roof nailing is complete. H2.5 clips are properly nailed to joist & top plate. Truss calc's are on-site. Okay to dry in roof and install roofing material.
01/17/2024 BULD - Electrical Clearance Passed 4 METERS, METER H, METER B, METER C AND METER CT. TEP is requiring that the meter be labeled 2M.
07/28/2023 COT - LCEL - Electrical Progress Passed
07/28/2023 COT - LCME - Mechanical Progress Passed
07/28/2023 COT - LCPL - Plumbing Above Ceiling Passed
08/01/2023 COT - LCBU - Excavation/Rebar/Zoning Passed
08/18/2023 COT - HCBU - Masonry Pregrout Passed 8/18/23: 3rd and final lift including bond beam ok to grout.
07/26/2024 COT - HCBU - Excavation/Rebar/Zoning Passed
07/26/2024 COT - LCBU - Building Progress Passed
07/26/2024 COT - LCBU - Preslab Passed
07/26/2024 COT - LCBU - Sustainability Passed
07/26/2024 COT - LCEL - Electrical Above Ceiling Passed
07/26/2024 COT - LCEL - Electrical Intermediate Passed
07/26/2024 COT - HCBU - Building Progress Passed
03/27/2026 COT - LCME - Mechanical Above Ceiling Passed 3-27-26: approved.
03/27/2026 COT - FCON - Fire - Final Passed
03/27/2026 COT - LCME - Mechanical Intermediate Passed 3-27-26: approved.
04/01/2026 COT - LCEL - Outdoor Lighting Passed 4-1-26: outdoor lighting approved.
04/01/2026 COT - LCEL - Electrical Final Passed 4-1-26: electrical final approved.
04/01/2026 COT - LCME - Mechanical Final Passed 4-1-26: mechanical final approved.
04/01/2026 COT - LCPL - Plumbing Final Passed 4-1-26: plumbing final approved.

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
LOAD CALCS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
MECHANICAL COMCHECK 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV1_JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV1_PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV1_PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV2 APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV2 PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV2_2_PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV2_2_STRUCTURAL CALCULATIONS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV2_LETTER 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REVISION APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REVISION NARRATIVE 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
STRUCTURAL CALCS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
TEST - BALANCE REPORT_V1.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
LOAD CALCS.PDF DOCUMENTS VIEW
MECHANICAL COMCHECK.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW
REV1_JOB CARD.PDF DOCUMENTS VIEW
REV1_PERMIT.PDF DOCUMENTS VIEW
REV1_PLAN SET.PDF DOCUMENTS VIEW
REV2 APPLICATION.PDF DOCUMENTS VIEW
REV2 PERMIT.PDF DOCUMENTS VIEW
REV2_2_PLAN SET.PDF DOCUMENTS VIEW
REV2_2_STRUCTURAL CALCULATIONS.PDF DOCUMENTS VIEW
REV2_LETTER.PDF DOCUMENTS VIEW
REVISION APPLICATION.PDF DOCUMENTS VIEW
REVISION NARRATIVE.PDF DOCUMENTS VIEW
STRUCTURAL CALCS.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
LOAD CALCS.PDF DOCUMENTS VIEW
MECHANICAL COMCHECK.PDF DOCUMENTS VIEW
PLAN SET.PDF CONSTRPLANS VIEW
STRUCTURAL CALCS.PDF DOCUMENTS VIEW