Inspection Status: Canceled
Inspection History: COT - LCBU - Framing
| Date |
Description |
Inspector |
Results |
Comments |
| 11/04/2022 |
COT - LCBU - Framing |
|
Canceled |
Inspection Canceled |
| 04/06/2023 |
COT - LCBU - Framing |
|
Not Ready |
New framing revision not on site, truss calcs not on site, gas test not ready, ABS vent scheduled to be rerouted. Not ready! |
| 04/10/2023 |
COT - LCBU - Framing |
|
Passed |
4-10-23: Metal stud framing is complete. Truss calf's are on-site. Metal stud has been reinforced at 3" vent stack in bathroom. Gas lines are holding 15# of compressed air. Electrical rough in in framed walls is complete. |