Permit: T19CM05544
Permit Details
Apply Date:
08/02/2019
Applicant:
N/A
Description:
SELF STORGAE
Contractors:
- CANYON BUILDING AND DESIGN L L C
Permit Reviews
Permit Number - T19CM05544
Permit Status: C of o
Permit Description: SELF STORGAE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/23/2020 | RESUB - SITE/GRADING ALL | 03/25/2020 | COMPLETED |
| 03/25/2020 | RESUBMITTAL | 04/03/2020 | COMPLETED |
| 04/03/2020 | RESUBMITTAL | 08/25/2021 | COMPLETED |
| 08/07/2019 | PLANS OK TO SUBMIT - COMM | 08/15/2019 | COMPLETED |
| 08/15/2019 | COMMERCIAL - NEW | 11/20/2019 | COMPLETED |
| 08/25/2021 | REVISION - - 1ST | 09/16/2021 | COMPLETED |
| 11/20/2019 | RESUB - SITE/GRADING ALL | 01/23/2020 | COMPLETED |
Completed Inspections
Permit Status: C of o
Permit Number: T19CM05544
Permit Description: SELF STORGAE
Total Completed Inspections - 38
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/08/2020 | ROOF NAILING | ENEWCOMB | Approved | |
| 10/30/2020 | STEM WALL/RETAINING WALL | JBURGE | Approved | Partial. Retaining wall at GL: U/4.5-7: approximately 25 ‘x14-18’. Changes as per RFI #39 and SK #14 and SK 18. Ok to place concrete in progress area. |
| 12/16/2020 | EXCAVATION/LAYOUT REBAR & ZON | JBURGE | Approved | Partial. Exterior perimeter footings for slab at GL: 10-2/O-Q; Basement Stairwell footing; Retaining wall at GL: 17/O-Q. Ok to place concrete in progress areas. |
| 12/22/2020 | REINFORCED MASONRY PRE-GROUT | JBURGE | Approved | Partial. Restraining wall at sub grade level at GL: 15.5-17. Ok to grout solid in progress area. 24"-60". |
| 04/22/2021 | SEWER - PRE CONSTRUCTION MTG | JBURGE | Approved | |
| 04/22/2021 | PLUMBING - BACK WATER VALVE | JBURGE | Approved | Partial. Water lines in place, hydro tested. Valves to be placed at a later date. |
| 05/12/2021 | PLUMBING - ABOVE CEILING | JBURGE | Approved | Partial. West side roof drains from level #1 to basement area (3 primary drains and 3 secondary drains) |
| 09/13/2021 | PLUMBING - FINAL | RSHERRY | Approved | WATER DISINFECTION REPORT REQUIRED |
| 11/15/2021 | PLUMBING - ROUGH, SOIL | JBURGE | Approved | Partial. 1 1/2” domestic water line at South/Southeast side of structure. Ok to cover progress areas. |
| 11/22/2021 | FRAMING | JBURGE | Approved | Not ready. Contractor cancelled. |
| 12/09/2021 | PLUMBING - ROOF DRAINS | JBURGE | Approved | Partial. East portion, middle section primary and secondary roof drains. |
| 12/17/2021 | ELECTRIC - UFER | JBURGE | Approved | Approved. Ok to cover. |
| 12/22/2021 | ELECTRIC - UNDERGROUND | JBURGE | Approved | Partial. Conduits for light poles (2). Caisson footings for light poles. Ok to place concrete in progress areas. |
| 12/22/2021 | BUILDING PRE-SLAB | JBURGE | Approved | . Partial. Loading dock apron at East area. Ok to place concrete in progress areas. |
| 12/30/2021 | TEP CLEARANCE - PM | JBURGE | Approved | CODE ECO |
| 12/30/2021 | ELECTRIC - INTERMEDIATE | JBURGE | Approved | Partial. Switch gear and panels in place. Ok to energize service and set meter. CLEARANCE: Code: ECO |
| 03/10/2022 | EXT METAL CLIPS/EXT SHEATHING | JBURGE | Approved | Approved |
| 03/10/2022 | STUCCO MESH | JBURGE | Approved | Approved |
| 03/10/2022 | U VALUE FOR WINDOW | JBURGE | Approved | Approved |
| 03/10/2022 | FIREWALL/FIREBARRIER/FIRESTOP | JBURGE | Approved | Approved |
| 03/10/2022 | ELECTRIC - ABOVE CEILING | JBURGE | Approved | Approved |
| 03/10/2022 | ELECTRIC - TEMPORARY SERVICE | JBURGE | Approved | Approved |
| 03/10/2022 | ELECTRIC - CONSTRUCTION POWER | JBURGE | Approved | Approved |
| 03/10/2022 | ELECTRIC - OUTDOOR LIGHTING | JBURGE | Approved | Approved |
| 03/10/2022 | PLUMBING - INTERMEDIATE | JBURGE | Approved | Approved |
| 03/10/2022 | MECHANICAL - INTERMEDIATE | JBURGE | Approved | Approved |
| 03/25/2022 | PLUMBING - YARD WTR LINE/TEST | JBURGE | Approved | Approved |
| 03/25/2022 | OUTDOOR LIGHTING FINAL | JBURGE | Approved | Approved |
| 03/25/2022 | BUILDING ABOVE CEILING | JBURGE | Approved | Approved |
| 04/18/2022 | ELECTRIC - FINAL | JBURGE | Approved | Approved |
| 06/02/2022 | MECHANICAL - FINAL | RSHERRY | Approved | REVIEW OF AIR BALANCE REPORT COMPLETED |
| 06/03/2022 | BUILDING - PROGRESS | JBURGE | Approved | Approved |
| 06/08/2022 | FIRE - FINAL | wmotto1 | Approved | |
| 06/08/2022 | FIRE - ALARM FINAL | wmotto1 | Approved | |
| 06/08/2022 | FIRE SPKLR - FINAL | wmotto1 | Approved | |
| 06/17/2022 | ENGINEERING - FINAL | DROBERTS | Approved | APPROVED FOR A FULL C OF O PENDING ALL OTHER INSPECTIONS. DP IS PENDING WAITING FOR THE APPROVED PLANS FOR ALL REMAINING WORK FOR THIS SITE THAT DOES NOT AFFECT THE PEDESTRIAN INGRESS AND EGRESS FOR THE BUILDING AT ALL LOCATIONS. |
| 06/17/2022 | CERTIFICATE OF OCCUPANCY | JBURGE | Approved | Approved. Ok to make application for Certificate of Occupancy. |
| 06/17/2022 | BUILDING - FINAL | JBURGE | Approved | Approved |