Inspection Status: Approved
Inspection History: FRAMING
| Date |
Description |
Inspector |
Results |
Comments |
| 03/10/2022 |
FRAMING |
|
Approved |
Approved |
| 11/22/2021 |
FRAMING |
|
Not ready for Inspection |
Not ready. Contractor cancelled. |
| 11/17/2021 |
FRAMING |
|
Partial Approval |
Partial. Level #3; metal framing system at GL: 2-10/K.5-U. Ok to cover interior walls. |
| 10/14/2021 |
FRAMING |
|
Partial Approval |
Partial. Level #3 at GL: N-U/2-9.5; Level #2.5 at GL: U-X/1-6. Ok to place concrete in progress areas. |
| 07/28/2021 |
FRAMING |
|
Partial Approval |
Partial. Level #2 metal stud framing at GL: H.5-Q/2-14. Ok to cover walls. |
| 07/22/2021 |
FRAMING |
|
Partial Approval |
Partial. Level #2 at GL: 14-24/A.5-Q. Metal stud framing system. Ok to cover walls. |
| 07/07/2021 |
FRAMING |
|
Partial Approval |
Partial. Metal framing at GL: 4-24/A-H.5. Ok to cover progress areas. |
| 06/18/2021 |
FRAMING |
|
Partial Approval |
Partial. Framing for storage areas at GL: A-H/4-24. Ok to apply interior sheathing in progress areas. |
| 06/15/2021 |
FRAMING |
|
Partial Approval |
Partial. Level #1 and ,Level #2 partitions at GL: H-Q/7-24. |
| 06/01/2021 |
FRAMING |
|
Cancelled |
CANCELLED CONTRACTOR NEVER CALLED BACK |
| 05/14/2021 |
FRAMING |
|
Partial Approval |
Partial. Framing in area H-I/5-24; one side interior sheathing. |
| 04/08/2021 |
FRAMING |
|
Partial Approval |
Partial. Basement level at GL: H.5-Q/15-24. Ok to panel walls. |
| 03/31/2021 |
FRAMING |
|
Partial Approval |
Partial. Basement level; Northeast portion. Ok to cover walls when hold downs are in place. |
| 09/22/2020 |
FRAMING |
|
Not ready for Inspection |
|