Permit Details

Status:
L of c
Type:
COMMERCIAL NEW
Address:
930 E 2ND ST
Address NEW:
930 E 2ND ST
Apply Date:
10/25/2018
Applicant:
METRO TUCSON EXPEDITING & DEVELOPMENT
Description:
FOUNDATION FOR MULTI USE BUILDING
Contractors:
  • U E B BUILDERS INC *** APA ***

Permit Reviews

Permit Number - T18CM08523
Permit Status: L of c
Permit Description: FOUNDATION FOR MULTI USE BUILDING
Start Date Submittal Complete Date Status  
01/25/2019 3RD PARTY REVIEW - REVISION/OTHER 01/28/2019 COMPLETED Review Details
03/20/2019 3RD PARTY REVIEW - REVISION/OTHER-2ND 03/20/2019 COMPLETED Review Details
10/25/2018 PLANS OK TO SUBMIT - COMM 10/25/2018 COMPLETED Review Details
10/30/2018 3RD PARTY REVIEW - COMMERCIAL 12/31/2018 COMPLETED Review Details
12/31/2018 POST 3RD PARTY REVIEW 01/10/2019 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T18CM08523
Permit Status: L of c
Permit Description: FOUNDATION FOR MULTI USE BUILDING
Total Outstanding Activity Conditions - 1
Date Name
10/25/2018 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: L of c
Permit Number: T18CM08523
Permit Description: FOUNDATION FOR MULTI USE BUILDING
Total Completed Inspections - 37
Date Description Inspector Results Comments
06/21/2019 ELECTRIC - UNDERGROUND JBURGE Approved Temporary power at South perimeter wall: 3 each 4" conduits and 8 each 2" conduits. Primary power conduits from vaults to penetration of west perimeter wall; approximately 100': 30 each 4" conduits and 10 each 2" conduits. Ok to cover progress areas
07/03/2019 TEP CLEARANCE - PM JBURGE Approved CODE TMPP
07/03/2019 ELECTRIC - SERVICE UPGRADE JBURGE Approved Switch gear and power cabinets. Ok to set meter and energize system.

CLEARANCE: CODE; TMPP
07/18/2019 PLUMBING - PRE SLAB JBURGE Approved Hilti sleeves in place for floor penetrations
10/07/2019 STEM WALL/RETAINING WALL JCLAXTON Approved
10/14/2019 PLUMBING - ROUGH, SOIL JBURGE Approved 2 each 4". Grease lines from building to grease trap (approximately 50 feet). Ok to cover progress areas. Roof drains; 2each at 8" from Level #1 to South manhole. Ok to cover progress areas.
11/13/2019 SHEET ROCK NAILING JBURGE Approved Contractor cancelled.
11/15/2019 PLUMBING - ABOVE CEILING JBURGE Approved Levels 1 & 2; waste and
Vent lines at East and South areas
11/15/2019 EXT METAL CLIPS/EXT SHEATHING JBURGE Approved Level #3 exterior walls North and East, South wall partial. Ok to waterproof progress areas.
11/22/2019 MECHANICAL - FINAL JBURGE Approved Contractor cancelled.
12/03/2019 PLUMBING - INTERMEDIATE RCHANDLER Approved PREVIOUSLY AP REOPENED FOR REINSPECTION
12/03/2019 ELECTRIC - ABOVE CEILING JBURGE Approved In wall electric at Level #3; Rooms 315; 317; 319; 322. Rooms at 3 South are not ready.
12/03/2019 MECHANICAL - ABOVE CEILING JBURGE Approved Level #3; Rooms 315; 317; 319; 321; 322. Rooms at 3 South not ready
12/03/2019 BUILDING ABOVE CEILING JBURGE Approved Contractor cancelled
12/03/2019 PLUMBING - FINAL RCHANDLER Approved
12/23/2019 MECHANICAL - INTERMEDIATE JBURGE Approved In wall Mechanical.
12/23/2019 ELECTRIC - INTERMEDIATE JBURGE Approved In wall electric in room 310. Ok to cover walls.
12/26/2019 FRAMING ESTEVENS Approved Level 5 unit # 531.
12/30/2019 REINFORCED MASONRY PRE-GROUT JBURGE Approved Level #1; Curved arc, topped out at GL: B-9/C-8. Level #2; Northwest, Pump Room #124, at 4’-8’. Level #1; CMU wall at GL: 7/H-C.8. Ok to grout progress areas.
12/30/2019 BUILDING PRE-SLAB JBURGE Approved Contractor cancelled.
12/30/2019 EXCAVATION/LAYOUT REBAR & ZON JBURGE Approved Contractor cancelled.
05/01/2020 GAS CLEARANCE JBURGE Approved CODE
05/20/2020 BUILDING - FINAL JBURGE Approved INSPECTOR APPROVED BUILDING FINAL. PENDIN FIRE AND ZONING.
05/20/2020 PLUMBING - SEWER HCS CONNECT JBURGE Approved
05/20/2020 PLUMBING - MD GAS/PRECONST MTG JBURGE Approved
05/20/2020 ELECTRIC - CABLE DROP JBURGE Approved
05/20/2020 ELECTRIC - UFER JBURGE Approved
07/15/2020 TEP CLEARANCE - AM JBURGE Approved CODE ECO/ Level #6; Meter sets at #600; 601; 602; 603; 604; 605; 607; 609; 610; 611; 630; 631; 632; 633; 634; 636.
08/20/2020 ENGINEERING - FINAL DROBERTS Approved OK FOR A TCO, BUT NOT READY FOR A FINAL. WALKED THE SITE AND HAVE ADDRESSED SOME AREAS THAT NEED TI BE ATTENDED TO PRIOR TO ALLOWING PEDESTRIAN WITHIN THE PATHWAYS. GENERAL CLEANUP OF WORK AREAS THAT HAVE BEEN WORKED ON THROUGH THE NIGHT. MINOR SWEEPING OF ALL AREAS THAT WILL BE UTILIZED FOR ACCESS INTO THE BUILDING. THE CONTRACTOR IS HAULING PLANTING MATERIAL ALONG THE EAST SIDE OF THE BUILDING BYT IS PLANNING ON HAVING IT COMPLETE BY 8:00 am THIS MORNING. ADA COMPLIANCY HAS NOT BEEN FULLY CHECKED AND WILL BE EVALUATED AND CORRECTED OVER THE NEXT FEW WEEKS AS NEEDED.
11/12/2020 BUILDING - PROGRESS JBURGE Approved 1090
11/12/2020 FIREWALL/FIREBARRIER/FIRESTOP JBURGE Approved 1090
11/12/2020 ELECTRIC - FINAL JBURGE Approved 1090
11/12/2020 ELECTRIC - CONSTRUCTION POWER JBURGE Approved 1090
02/16/2021 NPPO - FINAL DROBERTS Approved
02/16/2021 SIGN - FINAL DROBERTS Approved
02/16/2021 LANDSCAPE - FINAL DROBERTS Approved
02/17/2021 RIGHT OF WAY - FINAL DR Approved Punchlist items completed per Jack Kokot.