Permit: T18CM08523

Parcel: 12404100A


Addresses:

930 E 2ND ST

Inspection Status: Approved

Inspection History: EXT METAL CLIPS/EXT SHEATHING

Date Description Inspector Results Comments
11/12/2020 EXT METAL CLIPS/EXT SHEATHING Approved 1090
03/26/2020 EXT METAL CLIPS/EXT SHEATHING Partial Approval Level #15, parapet walls at perimeter and bar roof parapet; dens-glas sheathing. Ok to waterproof progress areas.
01/24/2020 EXT METAL CLIPS/EXT SHEATHING Partial Approval Level #8; exterior wall panels #8001-8019; 8031-8049.
01/23/2020 EXT METAL CLIPS/EXT SHEATHING Partial Approval Level #14, South: 20 concrete columns at GL: A/7.8; A/9; A/10; A/12; B/7; B/7.8/; B/9; B/10; B/12; C/7; C/11; C/..12; D/7; D.3/11; D.3/12; E/7; E/8; F/7; F/8; G/7; . Ok to place concrete in progress areas.
11/15/2019 EXT METAL CLIPS/EXT SHEATHING Partial Approval Level #3 exterior walls North and East, South wall partial. Ok to waterproof progress areas.
11/12/2019 EXT METAL CLIPS/EXT SHEATHING Partial Approval Exterior sheathing on Level #2; North, East and South Exterior walls. Ok to waterproof progress areas.