Inspection Status: Approved
Inspection History: EXT METAL CLIPS/EXT SHEATHING
| Date |
Description |
Inspector |
Results |
Comments |
| 11/12/2020 |
EXT METAL CLIPS/EXT SHEATHING |
|
Approved |
1090 |
| 03/26/2020 |
EXT METAL CLIPS/EXT SHEATHING |
|
Partial Approval |
Level #15, parapet walls at perimeter and bar roof parapet; dens-glas sheathing. Ok to waterproof progress areas. |
| 01/24/2020 |
EXT METAL CLIPS/EXT SHEATHING |
|
Partial Approval |
Level #8; exterior wall panels #8001-8019; 8031-8049. |
| 01/23/2020 |
EXT METAL CLIPS/EXT SHEATHING |
|
Partial Approval |
Level #14, South: 20 concrete columns at GL: A/7.8; A/9; A/10; A/12; B/7; B/7.8/; B/9; B/10; B/12; C/7; C/11; C/..12; D/7; D.3/11; D.3/12; E/7; E/8; F/7; F/8; G/7; . Ok to place concrete in progress areas. |
| 11/15/2019 |
EXT METAL CLIPS/EXT SHEATHING |
|
Partial Approval |
Level #3 exterior walls North and East, South wall partial. Ok to waterproof progress areas. |
| 11/12/2019 |
EXT METAL CLIPS/EXT SHEATHING |
|
Partial Approval |
Exterior sheathing on Level #2; North, East and South Exterior walls. Ok to waterproof progress areas. |