Permit: T18CM08523

Parcel: 12404100A


Addresses:

930 E 2ND ST


Inspection Status: Approved

Inspection History: REINFORCED MASONRY PRE-GROUT

Permit Number - T18CM08523

Inspection Description - REINFORCED MASONRY PRE-GROUT

Inspection Status - Approved

Date Description Inspector Results Comments
11/12/2020 REINFORCED MASONRY PRE-GROUT Approved 1090
02/20/2020 REINFORCED MASONRY PRE-GROUT Partial Approval West wall of generator room at 4’-9’4". Ok to grout progress areas.
01/30/2020 REINFORCED MASONRY PRE-GROUT Partial Approval Level #2; CMU walls at GL: C/7-5; 5/B-C; A/7.8-8.3; Level #1 area at door #11B. Ok to place grout in progress areas.
01/24/2020 REINFORCED MASONRY PRE-GROUT Partial Approval Level #1, CMU walls at GL: C/1-3.4 at 8’-12’; Generator Room East wall (#126) at 4’-8’; top-out at GL: 1/C-C.3; C.3/1-1.5. Ok to place grout in progress areas.
01/23/2020 REINFORCED MASONRY PRE-GROUT Partial Approval Level #1; Generator Room #126 at 4’-8’; Fire command room #127: interior walls at 4’-8’, exterior wall at 14’6" (top out). CMU wall at 0’-4’ at GL: C/1-3.4. Ok to place grout in progress areas.
01/21/2020 REINFORCED MASONRY PRE-GROUT Not ready for Inspection Rained out.
01/17/2020 REINFORCED MASONRY PRE-GROUT Partial Approval Top-out 1st floor, west of mail room #102. Grid line7.5 - d.5 to e.8 and c- 8-6.
01/15/2020 REINFORCED MASONRY PRE-GROUT Not ready for Inspection reschedule for 16 January.
01/14/2020 REINFORCED MASONRY PRE-GROUT Partial Approval Level #1; CMU wall at 12’-16’ (top out) at GL: 7/D.5-H; MDF Room #108 at 4’-8’; Resident storage Room #107 at 4’-8’. Ok to place grout in progress areas.
01/10/2020 REINFORCED MASONRY PRE-GROUT Partial Approval CMU Wall# at 4’-8’; Level #1; Room 102; corridor; hotel electric room #150A, wall at GL: 9/A-J. Ok to grout progress areas.
01/08/2020 REINFORCED MASONRY PRE-GROUT Partial Approval Level #1; Hotel Electric Room, #150A at 0’-4’. Note: West CMU wall, block size changed from 8" to 6" to accommodate electrical equipment.
01/03/2020 REINFORCED MASONRY PRE-GROUT Partial Approval Level #2; Loading area (L wall). Topped out, CMU walls at GL: 6/A-B; B/5-6; topped out. Ok to place grout in progress areas.
12/30/2019 REINFORCED MASONRY PRE-GROUT Partial Approval Level #1; Curved arc, topped out at GL: B-9/C-8. Level #2; Northwest, Pump Room #124, at 4’-8’. Level #1; CMU wall at GL: 7/H-C.8. Ok to grout progress areas.
12/27/2019 REINFORCED MASONRY PRE-GROUT Partial Approval Level 12 columns northeast quadrant from core east OK to pour. Level two masonry pump room second lift OK to grout. North and west walls level two OK to grout to top of wall.Level 12 north elevator shaft OK to pour
12/23/2019 REINFORCED MASONRY PRE-GROUT Partial Approval Level #1; CMU Arc in ramp at GL; B.9-C.8 at 8’-12’. Level #2, CMU walls at GL: A/1.8-A.5; A.2/1-F/1 at 4’-8’. Ok to grout progress areas.
12/20/2019 REINFORCED MASONRY PRE-GROUT Not ready for Inspection Level #2 walls and elevator not ready for inspection.
12/20/2019 REINFORCED MASONRY PRE-GROUT Not ready for Inspection Level #2 walls and elevator not ready for inspection.
12/19/2019 REINFORCED MASONRY PRE-GROUT Partial Approval Level #2; CMU walls at 0’-4’, GL: A/1.8-3; 1/A.2-B.5. Ok to place grout in progress areas.
12/18/2019 REINFORCED MASONRY PRE-GROUT Partial Approval CMU walls at Level #1; West walls at Southwest loading area at 16’-18’6" (topped out). South elevator shaft at 16’-18’6". Ok to grout progress areas.
12/17/2019 REINFORCED MASONRY PRE-GROUT Partial Approval South elevator core at 8’-12’. Northwest columns at GL:A.2/1; B.5/1. Ok to place grout in progress areas.
12/11/2019 REINFORCED MASONRY PRE-GROUT Partial Approval Loading area (curve at 4’-8’); GL: 9-7.8; Level #2, West CMU wall at 0’-4’; GL: A/3-5; Level #2; North CMU wall at 0’-4’ on GL: 1/C-F. Ok to place concrete in progress areas.
12/06/2019 REINFORCED MASONRY PRE-GROUT Partial Approval CMU walls at Level#2; Pump Room #124; 0’-4’; Level #1; Pump room access area T 8’-12’. Ok to grout progress areas.
12/05/2019 REINFORCED MASONRY PRE-GROUT Not ready for Inspection Contractor cancelled. Reschedule for 6 December
12/03/2019 REINFORCED MASONRY PRE-GROUT Partial Approval West exterior CMU walls: Residential Electric Room #121 top out at 16’ - 20, pump room #122 at 12’ - 16’, Fire Pump Room at 12’ - 16’. Ok to place grout in progress areas
11/25/2019 REINFORCED MASONRY PRE-GROUT Partial Approval West exterior wall at 8'-12': Residential Electric, Electric Distribution; Fire Pump, Pump Room (4'-8'): ok to place grout in progress areas
11/25/2019 REINFORCED MASONRY PRE-GROUT Partial Approval Level #1; Northwest loading area; Generator room; Fire Command center CMU walls at 8'-12'. Ok to grout progress areas.
11/14/2019 REINFORCED MASONRY PRE-GROUT Partial Approval Level #1; Loading Room topped-out, GL: 12/A-C at approximately 22’6". Ramp area at #106; GL: C.5-E.5/7-7.5. Ok to place grout in progress areas.
11/12/2019 REINFORCED MASONRY PRE-GROUT Partial Approval Trash room, North wall; top-out. Trash room; East wall at 12’-16’. Loading area, South wall at 12’-16’. Generator room and Fire Command room: 0’-4’. Ok to place grout in progress areas.
11/06/2019 REINFORCED MASONRY PRE-GROUT Partial Approval Bicycle storage area top-out at 16’8"; trash room North wall at 8’-12’, East wall at 8’-12’, CMU wall T GL: 12/A-C 8’-12’, Ok to grout progress areas.
10/28/2019 REINFORCED MASONRY PRE-GROUT Partial Approval Level #1 CMU walls at GL: 12/A-C at 12’; C/11-12 at 10’6" in loading area; 10/A-C at 4’; Bike storage area at 10’6"; Trash enclosure at 9.5/A-C at 8’. Ok to place grout in progress areas.
10/18/2019 REINFORCED MASONRY PRE-GROUT Partial Approval CMU walls at 0"-48" at GL: A-D/9.5-12. Ok to place grout in progress areas.
10/10/2019 REINFORCED MASONRY PRE-GROUT Partial Approval CMU walls at 9'6" (topped out); GL: 9/B-C; 9.25/F-F.5; F/9-9.75; 9.75/D-E.5; D/9.5-9.75. OK to place grout in progress areas.
10/01/2019 REINFORCED MASONRY PRE-GROUT Partial Approval Level #3; crash/demising wall at GL: F.5/2-8.5; 9.5/D-F; F/8.5-10, (0’ - 4’). Ok to place grout in progress areas.
09/24/2019 REINFORCED MASONRY PRE-GROUT Partial Approval Parking garage Level #1; storage area, bicycle storage, electric room, pump room: 4’ to top out. Ok to place grout in progress areas.
09/19/2019 REINFORCED MASONRY PRE-GROUT Partial Approval Parking garage at Level #1; CMU walls at 0”-48” at Electric room ; pump room; bicycle storage room; general storage rooms: Ok to place grout in progress areas.