Inspection History Details
Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
Permit Number - T18CM08523
Inspection Description - EXCAVATION/LAYOUT REBAR & ZON
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/20/2020 | EXCAVATION/LAYOUT REBAR & ZON | Approved | ||
| 02/10/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Information only; height of swimming pool walls to be determined. RFI on final height must be submitted for approval. | |
| 02/07/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level #15; 15 each concrete pedestals. Ok to place concrete in progress areas. | |
| 02/06/2020 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | Contractor cancelled. Reschedule for 7 February. | |
| 01/24/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level #14 South, columns at GL: E/9; F/9; G/9; G/7.9. Shear walls/elevator, stairwell #2. Ok to place concrete in progress areas. | |
| 01/23/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Level #14, South: 20 concrete columns at GL: A/7.8; A/9; A/10; A/12; B/7; B/7.8/; B/9; B/10; B/12; C/7; C/11; C/..12; D/7; D.3/11; D.3/12; E/7; E/8; F/7; F/8; G/7; . Ok to place concrete in progress areas. | |
| 01/18/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Post Tension Cable system, Level 14 North; 15 columns at GL: A/1.8; A/3; A/3.9; A.2/1; B/3/; B/4; B/5; B/6; B.5/1; B.5/2; C/6; C.3/1; C.3/2; D/6; D.4/1. Ok to place concrete in progress areas. Level #14 North; 15 CMU columns at GL: D.4/2; E/3.4; E/4; E.6/1; E.6/2; F/3.4; F/4; F.5/2; G/3; G/4; G.5/1; H/1.8; H/3; H/4. Level #14 North; Stairwell #1, shearwalls: GL: C/3.4-4.5; 3,4/C-D. OK to place concrete in progress areas. |
|
| 01/14/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Lev l #13 South, Shear walls for stairwell #2. Ok to place concrete in progress area. | |
| 01/13/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level #13 South, concrete columns at GL: A/7.8; A/9; A/10; A/12; B/7; B/7.8; B/9; B/10; B/12; C/7; C/11; C.1/12; D/7; D.3/10; D.3/12. Ok to place concrete in progress areas. | |
| 01/11/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level #13 South, Post Tension Cable system. Inspection interrupted by structural fire. To be rescheduled at 0530 hours 13 January. | |
| 01/10/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level 13 North, Post Tension Cable System and rebar are in place. Ok to place concrete. | |
| 01/09/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level #13 North, 14 columns at GL: A.2/1; B.5/1; C.3/1, A.2/1; B.5/2; C.3/2; A/3; B/3; A/4; B/4; B/5; B/6; C/6; D/6,. Ok to place concrete in progress areas. | |
| 01/08/2020 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | Contractor cancelled. | |
| 01/07/2020 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | Post Tension Cable System inspection rescheduled for 8 January. | |
| 01/06/2020 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | Contractor cancelled. | |
| 01/04/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level #12 South; 9 columns; South Core (elevator/stairwell): GL: E/7; E/8; E/9; F/7; F/8; F/9; G/7.3; G/8.8; G/9. Core at GL: C/8-9.3; 9.3C-D; D/9.3-8. Ok to place concrete in progress areas | |
| 01/03/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level #12; South 15 columns T GL: A/7.8; A/9; A/10/; A/12; B/7; B/7.8; B/9; B/10; B/12; C/7; C/11; C/12; D/7; D.3/11; D.3/12 | |
| 01/02/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | ||
| 12/30/2019 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | Contractor cancelled. | |
| 12/26/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level 12, pour 1, columns grid line D6, C6, B6,B5,B4,A4,B3,A3,A1.8, A.2/1, B.5/1, B.5/2, C.3/1, C.3/2, D.4/1. | |
| 12/24/2019 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | Contractor cancelled, Level #12 North slab pour rescheduled for 26 December (early am) | |
| 12/23/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level #12 North, Post Tension Cable System. Ok to place concrete in progress areas. | |
| 12/20/2019 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | 12 North Post Tension Cable System to be ready for inspection 23 December at 1000 hours. | |
| 12/20/2019 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | . Level #12 North Post Tension Cable System to be ready for inspection 23 December at 1000 hours. | |
| 12/17/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level #11 South Core, Elevator/Stairwell #2. Concrete columns at GL: E/7; F/7; G/7.1; G7.9; G/9.1; F/9; F/8; E/9; E/8. Ok to place concrete in progress areas. | |
| 12/14/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level #11 South; Post Tension Cable System, OK to place concrete in progress area. After hours inspection (1345-1545) 12.14.19. Please charge APA account $165 for inspection performed. |
|
| 12/13/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level #11 North, concrete columns at GL: E.6/1; E.6/2; F.5/1; F.5/2; G.5/1; G/3; G/4; H/3; H/4; H/1.8. Ok to place concrete in progress areas. | |
| 12/12/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level #11 North, columns at GL: A/1.8; A.2/1; A/3; A/4; B/3; B/4; B/5; B/6; B.5/1; B.5/2; C.3/1; C.3/2; C/6; D.4/1; D.4/2; D/6; E/3.4; E/4; F/3.4; F/4. Ok to place concrete in progress areas. | |
| 12/11/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level 11 North; Post Tension Cable System. Ok to place concrete in progress areas. | |
| 12/09/2019 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | Contractor cancelled, rained out. | |
| 12/06/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level #10 South Core (Elevator/Stairwell #2) shear walls. Ok to place concrete in progress areas. Concrete columns at GL: E/7; E/8; E/9; F/8; F/9; F/7; G/7.1; G/7.9; G/7.9; G9.1. Ok to place concrete in progress areas. | |
| 12/03/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level #10 North concrete columns at GL: A/1.8; B.5/1; B.5/2; B/3; C.3/1; C.3/2; C/3.4; A/1.2; A/3; A/4; B/4; B/5; B/6; D.4/1; D.4/2; E.6/1; E.6/2; E/4; E/6; F.5/1; F.5/2; F/3.4; F/4; G.5/1.8; G/3; G/4; E.5/1; H/1.8; H/3.4; H/4. At k to place concrete in progress areas. | |
| 12/02/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level #10 North, Post Tension Cable System. Ok to place concrete in progress areas. | |
| 11/27/2019 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | Post Tension Cable System inspection to be rescheduled for 2 December. | |
| 11/26/2019 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | Level #10 North Post Tension Cable System will be ready for inspection on 27 November. | |
| 11/25/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level 9 South; columns at GL: E/7; E/8; E/9; F/7; F/8; F/9; G/7.1; G/7.9; G/9.1 | |
| 11/23/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level #9 South columns at GL: A/9; A/12; B/9; B/12; B/7.8 A/7.8 C/7; C/9; C.1/11; C/12; A/10; B/10; D/11; D.3/12; . Ok to place concrete in progress areas. | |
| 11/14/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level #8 South, Core, Elevator #2, Stairwell #2. Ok to place concrete in progress areas. | |
| 11/13/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Concrete columns on Level #8; South at GL: A/7.8; A/9; A/10; A/12; B/7.8; B/7; B/9; B/10; B/12; C.1/11; C.1/12; C/7; D.3/11; D.3/12; D/7; E/7; E/8; F/7. | |
| 11/12/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level #5 pour back; South. Ok to place concrete. | |
| 11/09/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level #8, North; Core - Elevator/Stairwell #2: Ok to place concrete in progress area. Please charge Katerra acct 165.00 for after hours inspection on this date 11/09 |
|
| 11/08/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level #8; North, concrete columns at GL: A/1.8; A.2/1; A/3; A/4; B/3; B/4; B/5; B.5/1; B.5/2; C/6; C.3/1; C.3/2; C/6; D.4/1; D.4/2; D/6; E/3.4; E.6/1; E/6.2; E/4; F/3.4; F/4; F.5/1; F.5/2; G/3; G.5/1; G/4; H/1.8; H/3; H/4. | |
| 11/07/2019 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | Contractor cancelled. | |
| 11/06/2019 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | Unable to complete Post Tension Cable slab due to morning electrical storm. Reschedule for 7 November | |
| 11/05/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level #7 South, CC1 columns at GL: E/9; F/7; F/9; G/7.1; G/7.9; G/9. Level #7 South Core shear walls (Stairwell #1). Ok to place concrete in progress areas. | |
| 11/04/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level #7, South: C1 columns at GL: A/7.8; A/9; A/10; A/12; B/7; B/7.8; B/9; B/10; B/12; C/7; C.1/11; C.1/12; D.3/11; D.3/12; D/7; E/7; E/8; F/8. Ok to place concrete in progress areas. | |
| 11/01/2019 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | Post Tension Cable System inspection will be performed on 2 November. | |
| 10/31/2019 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | Contractor cancelled. | |
| 10/30/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level #7; North, Columns at GL: E/3.4; E/4; D.4/2; F/3.4; F/4; F.5/1; F.5/2; G/3; G/4. Level #7 North Core; Elevator/Stairwell #2; shear walls. Ok to place concrete in progress areas. | |
| 10/29/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level #7 (North), Column cages at GL: A.2/1; A/1.8; A/3; A/4; B/3; B/4; B/5; B.5/1; B.5/2; C.3/1; C.3/2; C/6; D/6; D.4/1; E.6/1; E.6/2; G.5/1; H/1.8; H/3; H/4. | |
| 10/28/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level #7; North slab, Post Tension Cable system. Ok to place concrete for slab | |
| 10/25/2019 | EXCAVATION/LAYOUT REBAR & ZON | Cancelled | Canceled on site-wind | |
| 10/24/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | 6 columns on 6th level. Grid lines D7,E8,F8-9,G8-9 | |
| 10/23/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level #6 South; columns at GL: B/7; C/7; B/7.8; D/.3/11; D.3/12; C.1/12; B/12; A/12; D/7; E/7; F/7; G/7. Shear walls in South Core (elevator and stairwell). Ok to place concrete in progress areas. | |
| 10/22/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level #6 South; Post Tension Cable Sysyem. Ok to place concrete in progress areas. | |
| 10/21/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level #6 North, 3 each columns. Ok to place concrete in progress areas. | |
| 10/18/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Shear walls/elevator walls (South core). Columns at GL: A/1.8; A.2/1; A/3; A/4; B/3; B/4; B/5; B/6; B.6/2; B.5/1; C.3/1; C.3/2; C/6; D/6, D.4/2; D.4/1; E/3.4. Ok to place concrete in progress areas. | |
| 10/17/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Post Tension Cable System: Level #6 North. Ok to place concrete in progress areas. | |
| 10/16/2019 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | Contractor cancelled; reschedule PT Inspection for 18 October. | |
| 10/14/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Twenty-four column cages at GL: A/7.8; A/9; A/10; A/12; B/7.8; B/7; B/9; B/10; B/12; C.1/11; C.1/12; C/7; D/7; D.3/11; D.3/12; E/ 7; E/8; F/7; F/8; F/9; E/9; G/7.1; G/7.9; G/9. Ok to place concrete in progress areas. | |
| 10/11/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Post Tension Cable System on Level #5 South. Ok to place concrete in progress areas. | |
| 10/08/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level #5; North Section; C1 columns at GL: A/1; A/1.8; A/3; A/4; B/3; B/4; B/5; B/6; C.3/1; C.3/2; D.4/1; D.4/2; E.6/1; E.6/2; E/3.4; E/3.9; F/3.4; F/3.9; F.5/1; F.5/2; G/3; G/4; G.5/1; H/1.8; H/3; H/4. Ok to place concrete in progress areas. | |
| 10/07/2019 | EXCAVATION/LAYOUT REBAR & ZON | Cancelled | ||
| 10/04/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level #3 crash walls. Ok to place concrete in progress areas.Level #5; North portion: Post Tension Cable System. Ok to place concrete in progress areas. | |
| 10/03/2019 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | will reschedule for 4 October. | |
| 10/02/2019 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | Will recall when Level #5 North deck is ready for inspection. | |
| 10/01/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level #4 South, four concrete columns at GL: A/12; B/12; C.2/12; D.4/12. Ok to place concrete in progress areas. | |
| 09/30/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level #4; South: Columns t GL: A/7.8; A/9; A/10; B/7; B/7.8; B/9; B/10; C/7; C.2/11; D/7; D/9; D.4/11; E/7; E/8; E/9; F/7; F/8; F/9; G/7.1; G/7.9; G/9. South elevator shear walls; Ok to place concrete in progress areas. | |
| 09/27/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Post tension cable system on Level #4; South portion at GL: 7.5-12/A-H. Ok to place concrete in progress areas. | |
| 09/26/2019 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | Will reschedule for a Post Tension Cable inspection for 27 September. | |
| 09/25/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level two, strips on south east and west side. | |
| 09/24/2019 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | Rained out. | |
| 09/24/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Please disregard prior inspection result. The sun came out and inspections were performed. Level #2 East and West pour strips. Ok to place concrete in progress areas | |
| 09/23/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level #4 North Section: Columns and shear walls: Columns at GL: A.2/2; A/1.8; A/3; A/4; B/3; B/4; B/5; B/6; C/6; D/6; D.4/1; D.4/2; E/3.4; E/3.9; E.6/1; E/6.2; F/3.4; F/3.9; F/4.5; F.5/1; F.5/2; G/3; G/4; G.5/1; H/1.8; H/3; H/4. Shear walls at north stairwell. Ok to place concrete in progress areas. | |
| 09/20/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Pour-back strips at Level #1; Southeast corner; Garage, Level #2 mid ramp. Ok to place concrete. Crash walls at basement level to Level #1. | |
| 09/19/2019 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | Contractor cancelled | |
| 09/19/2019 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | Contractor cancelled | |
| 09/18/2019 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | Contractor cancelled, will reschedule for 9 September. | |
| 09/17/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Shear walls at Elevator in South Core; concrete columns at GL: E/7; D/7; C/7; B/7; G/7.9; H/7.1; G/7.1; G/9.1; F/8; E/9; F.2/12; E.5/11; C.1/11; B/10; A/9; A/7.8; A/9; A/12; B/12; C.1/12; H/7.9; H/8.8; F/7; F/9; E/8; F.2/11; E.5/12; D.3/12; D.3/11; B/9; B/7.8 | |
| 09/16/2019 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | Reschedule for 17 September, column inspections. | |
| 09/13/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level 3 North half. Post tension cable assembly. Ok to place concrete in progress areas. | |
| 09/12/2019 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | Contractor cancelled. Rescheduled for 9/13 10 AM | |
| 09/11/2019 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | Contractor cancelled | |
| 09/10/2019 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | Contractor cancelled | |
| 09/09/2019 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | Contractor cancelled. | |
| 09/06/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level #3; North core(elevator/stairwell); Level #3 to Level #4. Ok to place concrete in progress areas. Level #3; 28 each C1 columns at GL: A.2/1; B.5/1; B.5/2; C/6; C.3/1; C.3/2;; D/6; D.4/2; D.4/1; E.5/1; E.5/2; E/4; E/3.4; F.5/1; F.5/2; F/3.4; F/4; F/6; G.5/1; G/3; G/4; G/5; F/4.5; H/1.8; H/3; H/4; H/6.2. Ok to place concrete in progress areas. | |
| 09/05/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level #3; Post Tension Cable System at GL: A/7.5-12; 12/A-H; A-H/7.5; H/7.5-12. Ok to place concrete in progress areas. | |
| 09/05/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Seven C1 columns at GL: A/1.8; A/3; B/3; A/4; B/4; B/5; B/6. Ok to place concrete in progress areas. | |
| 09/03/2019 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | Contractor cancelled Level #3 Post Tension Cable System inspection. | |
| 08/30/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level #2; C1 columns at GL: A/9; B/9; A10; crash walls at Levels #1 and #2 in parking garage. Ok to place concrete in progress areas. | |
| 08/29/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level #2; C1 columns at GL: C/7; C.3/7; D/7. Ok to place concrete in progress areas. | |
| 08/28/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level #2; C1 columns at GL: B/5; B/6; A/6; C/6. Ok to place concrete in progress areas. | |
| 08/27/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level #2 columns at GL: D/6; A/2; D/10; B/12; C.1/12; C.1/10. OK to place concrete in progress areas | |
| 08/26/2019 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | South core (elevator/stairwell). Contractor cancelled. | |
| 08/24/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | 15 each C1 columns at Level 2 at GL: A/7.8; B.3/11; B/7; B/7.8; D.3/12; E.5/11; E/6; F.2/12; F.2/11; F/6; G.5/12; G/6; G/7.8; H/7.8; H/8.8. Ok to place concrete in progress areas. Please charge APA account for after hours inspection: $165.00. |
|
| 08/23/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Columns (C1) at GL: G/6.2; H/7.1 on Level. | |
| 08/22/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level #2 8 each C1 columns at GL: G.5/1; H/5; H/6.2; G/7.1; F.5/1; F.5/2; F/6; F/4.5; E/4; E/6. 01015. Partial. Level #2. Post Tension Cable System at GL: A/8-12; 12/A-F.2; F.2/8-12; A-F.2/8. Ok to place concrete in progress areas. | |
| 08/21/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level #2; C1 columns at GL: E/4.5; F/4; F/3.4; G.5/1; G/4; H/4; H/5; H/7. Ok to place concrete in progress areas. | |
| 08/20/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level #2: 10 each C1 columns at GL: B.5/2; C.3/1; E.6/2; E.6/1; E/3.4; A/4; G/3; H/3; H/1.8; H/4. Ok to place concrete in progress areas. | |
| 08/19/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | 7 each C1 columns at GL: A/1.8; A.2/1; A/3; B/3; A/4; B.5/1; C.3/1. Ok to place concrete in progress areas. |
|
| 08/16/2019 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | Will schedule for after hours inspection 17 August at 1000 hours. | |
| 08/15/2019 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | Contractor cancelled. Will reschedule for 16 August. | |
| 08/14/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | 2 each C1 columns at GL: A/9; C/6. Ok to place in progress areas. | |
| 08/13/2019 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | Contractor cancelled, will reschedule for 14 August. | |
| 08/12/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level #2 ramp area at GL: B-C/4-6.6; Slab at C-D/7'8; South core. Ok to place concrete in progress areas. | |
| 08/09/2019 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | Contractor cancelled, rained out. | |
| 08/08/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level #2: C1 column at B/7 at 12’11". Ok to place concrete in progress areas. | |
| 08/07/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level #2; North core walls. Ok to place concrete. | |
| 08/06/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level #2; C1 columns at GL: G/7.1; H/9. Ok to place concrete in progress areas. | |
| 08/05/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | LEVEL #2; CI COLUMNS AT GL: G/7.9 AT 16'5"; F/8 AT 16'5"; E/8 AT 16'5"; E/9 AT 16'2"; F/9 AT 16'2"; F.2/11 AT 16'2"; F.5/11 AT 16'2"; D.3/11 AT 16"2"; C.1/11 AT 15'5"; C.1/12 AT 15'5"; D.3/12 AT 15'5". OK TO PLACE CONCRETE IN PROGRESS AREAS. | |
| 08/02/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level #2; C1 columns at GL: H/7.1; G/7.1; F/7; H/7.9; G/9.1; E.5/12. Ok to place concrete in progress areas. | |
| 08/01/2019 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | Contractor cancelled. | |
| 07/31/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level #2; Part #4; double matted rebar reinforcement system. Ok to place concrete in progress areas. | |
| 07/30/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level #2 columns; C1 at GL: A/10; C1 at GL: B/10; C1 at GL: B/9; C1 at GL: B/7.8; C1 at GL: C/7; C1 at GL: B/12; C1 at GL:A/12. Ok to place concrete in progress areas. | |
| 07/26/2019 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | Contractor cancelled; rescheduled for 0800 hours 29 July | |
| 07/25/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level #1; multi level slab at GL: F.3/9-12; A-F.3/12; A-C/12; C/5-12; A-B/7.8-12; F.3/9-12; A-C.3/5; F.3-H/12; G-H/9. Ok to place concrete in progress areas. | |
| 07/24/2019 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | Double mat rebar system not ready. Will reschedule for 25 July at 12:00. | |
| 07/23/2019 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | Contractor cancelled, will reschedule for 24 July. | |
| 07/22/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level #1; columns: C1 at GL: F/4.5 at 11’10"; C1 at GL: G/4 at 13’5"; C1 at GL: H/6.2 at 13’2"; C1 at GL: F.5/1 at 12’9"; C1 at GL: E.6/1 at 13’3"; C1 at GL: D.4/1 at 13’3"; C1 at GL: D.4/2 at 12’9"; C1 at GL: C.3/2 at 12’9". South stairwell #1 (core) from top of level #1 to bottom of level #2; OK to place concrete in progress areas. | |
| 07/20/2019 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | Scheduled inspection of columns; no columns ready for inspection | |
| 07/19/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level #2 columns: 1 at C1 at F.5/2, 12’9"; 1 at C1 at GL: E.6/2. 12’9"; 1 C1 at GL: F/3.4. 13’4"; 1 at C1 at E/3.4. 12’9"; 1 at C1 at E/4 at 13’4"; 1 at C4 at GL: E/4.5 13’11"; 1 at C1 at GL: F/6 at 13’3"; 1 at C1 at GL: H/3 at 15’5"; 1 at C1 at GL: H/1.8 at 15’5"; 1 at C1 at GL: 1/G.5 at 15’5"; 1 at C1 at GL: G/3. 12’9"; 1at C1 at GL:H/4 15’5"; 1 at C3 at GL: H/5. 12’4. Ok to place concrete. | |
| 07/18/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level #1 pre slab, double matted rebar reinforcement at GL: A/1-5; 1-5/A-B, 1/A-H; H/1-6; 6/B-H. Ok to place concrete. | |
| 07/17/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Column at C1 at 1/C.3; 16’9". Ok to place concrete. Level #2; East double matted slab to be ready for inspection 18 July. | |
| 07/16/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Eight columns on Level #2: 1 at C1, GL: B.5/2 at 15’6"; 1 at C1, GL: B/5 at 12’2"; 1 at C4, GL: A/5 at 13’6"; 1 at C4, GL: A/6 at 20’11"; 1 at C4, GL: A/7 at 19’5"; 1 at C1, GL: A/7.8 at 19’5"; 1 at C1, GL: A/1.1 at 16’9"; 1 at C1, GL: A/4 | |
| 07/15/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level #2; 4 each columns: 1 at GL: C1 at 1/B.5, 16'2"; 1 at GL: C2 at A/1.8, 16'2"; 1 at GL: C1 at 4/B, 13'11"; 1 at GL: C1 at 3/A, 15'6". Ok to place concrete. | |
| 07/12/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level #1; Building Slab at GL: 1/A-D; 1/A-D; A/1-3; A/1-8.5; 8.5/A-B.5; B.5/ 3-8.5. Ok to place concrete in progress areas. Double Matt rebar system; #80 grade rebar throughout | |
| 07/11/2019 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | Will recall for 12 July. | |
| 07/10/2019 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | Contractor cancelled, will reschedule for 12 July | |
| 07/09/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Information only, RFI for deck slab at Level #1: double matt #4 rebar at grade #80. | |
| 07/08/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | North elevator/stairwell core at Level #2; GL: C/3.4-4.5; 3.4/C-D, D/3.4-4.5; 4.5/C-D. Ok to place concrete in progress areas. | |
| 07/05/2019 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | Job site closed | |
| 07/03/2019 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | Contractor cancelled, will reschedule for 8 July. | |
| 07/02/2019 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | Inspection should be for building pre-slab: 01015. | |
| 07/01/2019 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | Contractor cancelled, will reschedule for 2 July at 1200 hours. | |
| 06/25/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | North elevator core walls at level #2; GL: C/3.4-4.5; D/3.4-4.5; 3.4/C-D, 4.5/C-D. Ok to place concrete at progress areas. | |
| 06/20/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | South elevator shaft core walls and columns at GL: 8-9.3/D.2-C. | |
| 06/19/2019 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | Contractor cancelled. | |
| 06/18/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Ramp wall at 4’-8’ at GL:6.5/B-B.7. Ok to place concrete. | |
| 06/17/2019 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | Contractor cancelled. | |
| 06/14/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Columns: C1 at A/10; C1 at A/12; C1 at A/9. Ok to place concrete in progress areas. | |
| 06/13/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Columns: C1 at H/3; C1 at G.5/1; C1 at D.4/2; C6 at G/5; C3 at G/6.2; C1 at B.5/1; C1 at A/7.8. Ok to place concrete in progress areas. | |
| 06/12/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Ramp wall at B/6-7.8 at 4’ by 10". Columns: C1 at H/1.8; C3 at H/7.9; C3 at H/8.8. Ok to place concrete in progress areas. | |
| 06/11/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Perimeter wall at 12/A-B at 10’2”. Ramp wall at C/6.5-7.8 at 4’. Columns: C1 at F/3.4; C1 at A.1/1; C1 at F/9. Ok to place concrete in progress areas. |
|
| 06/10/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Perimeter wall at 9’8”, GL: A/9-12. Columns; C1 at F/4; C1 at F/6; C1 at E/4; C1 at E/3.4; C1 at E.6/2; C1 atB/3; C3 at B.5/11, C1 at B.3/11. Shear walls #5, 6, 7, 8. Ok to place concrete in progress areas. |
|
| 06/07/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Columns and footings: C1-F3 at B/9; C1-F3 at B/7.8; C2-F1 at C/7; C1-F4 at B/4; C2-F1 at G/8; C1-F1 at G/5; C1-F1 at G/3.4; C1-F8 at A/1.8; C1-F8 at A/3; C1-F8 at A/4; C1-F9 at A/5; C1-F9 at A/6. Perimeter wall at A/7.5-9. Ok to place concrete in progress areas. |
|
| 06/06/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Columns and footings: C1-F1 at F/3.4; C1-F1 at E/4; C1-F1 at E/4; C1-F1 at F/4; C4-F6 at E/4.5; C3-F5 at F/4.5. Columns: C1 at F/9; C1 at G/9; C1 at G/10; C1 at D.3/12. Perimeter wall at 1/A-B.5. Ok to place concrete in progress areas. |
|
| 06/05/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Columns and footings: C1-F2 at C.1/11; C2-F1 at C/7; C2-F3 at D/11; C3-F6 at F.2/11; C5-F6 at G/10; C1-F4 at 9/G; C1-F9 at F/9; C2-F1 at F/8; C1-F5 at F/7; C3-F5 at F/6; C1-F5 at F/.5; C1-F6 at E/4.5; C1-F5 at E/4; C1-F1 at E/4.5; C1-F6 at F/4.5; C1-F5 at F/4; C1-F1 at F/3.4. Columns: C1 at G/3; C1 at D.4/1; C1 at C.3/2; C1 at B.5/2; C1 at B/6; C1 at B/7; C1 at B/9. South elevator walls at 10’6". Ok to place concrete in progress areas. |
|
| 06/04/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Columns and footings: C1-F2 at GL: B/10; C-1-F/8 at GL:A/10; C-1 at B/4. Ok to place concrete in progress areas. Will call for inspection at 0630 hours 5 June. | |
| 06/03/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Exterior perimeter wall at GL: A/1-5. OK to place concrete. | |
| 05/31/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Footings: A/1-6; Columns: C-1 at 1/B, C-1 at B/5 F5; C-1 at B/4. F-4; C-1 at B/6 F3; C-4 at A/6; C-4 at A/5; South columns: C-3 at F.2/11; C-3 at E.2/11; C-1 at C/11; C-3 at B/12. Ok to place concrete in progress areas. Additional footing at GL: A/6-10. Columns: C-2 at C/6 F1; C-1 at B/7 F4; C-1 at B/7.8 F3; C-1 at B/9. F3 |
|
| 05/30/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Perimeter wall at 10’ - 13’4" at GL: 1/B.5 - E.8; Columns: 1 each C-1 at GL: E/9; 1 C-2 at GL: E/8. North elevator and stairwell slab at GL: 3.4-4.5/C-D. Ok to place concrete at progress areas. | |
| 05/29/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | South perimeter wall at 10’6” at GL: 12/D-B. C-1 column and F-10 footing at GL: A/10.5-12. Ok to place concrete in progress areas. | |
| 05/28/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | South elevator slab (Elevators #4,5,6). Columns: C-1 columns at GL: G/7.1, G/7.5, G/7.9; C-3 at H/7.1; C-6 at G/6.2. Ok to place concrete in progress areas. | |
| 05/24/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | 11 to 12 g to h, 12 -f to g Ok to pour Gl1 - a to e.6 Horizontals and verts ok. Still need column steel. |
|
| 05/23/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | North and South elevator/stairwell slabs (center sump pump sections). Columns: C1 columns at GL: H/4; G/7; C3 columns at GL: H/5; F/6; H/7; C1 at GL: G/8. Ok to place concrete in progress areas | |
| 05/22/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Perimeter wall at GL: H/9-10 at 10 feet. Footings: at GL: 12/D-A. Column footings; 2 each C1 at GL: D/11-12; 2 each C1 at GL: C/11-12; 1 each C1 at GL: B.2/12. Ok to place concrete in progress areas. | |
| 05/21/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Perimeter wall at 12’6" at GL: 6-7.1/H, Footings at GL: D-H/12; Columns C3 at F/11; C3 at E.2/11; C1 at D/11. Ok to place concrete at progress areas. | |
| 05/20/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Perimeter wall at 12’6" on. GL: 7.1-9/H. Ok to place concrete. | |
| 05/17/2019 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | Will reschedule for 20 May. | |
| 05/16/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Perimeter wall at 13’8" at GL: H/4-6.2. Ok to place concrete. | |
| 05/15/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Footings at GL: H/4-10: 7 each C-3 column footings included. Column footing C-1 at GL: G/4. Ok to place concrete in progress areas. | |
| 05/14/2019 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | Contractor cancelled, will reschedule for 15 May. | |
| 05/13/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Perimeter wall at 13’6"; at GL: H/3-4. Ok to place concrete. Columns C-1; at GL: 1/F.5; 1/E.8. Ok to place concrete. | |
| 05/10/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Perimeter wall at 13’6”; at GL: H/1-4. Ok to place concrete | |
| 05/09/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | I beam at GL: G-G.7/4; C-1 column footing at GL: G/4. Ok to place concrete in progress areas. | |
| 05/08/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Perimeter wall at 12’2"; approximately 60’: GL: 1/E.6-H. (North) | |
| 05/07/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Columns, footings, I-beams: Columns Gl; E.6-H/1-3; F2/H, F8/H.3; 2/H, G.5/1; footings at GL: 2/F.5; 1/F.5; 2/E.6; 1/E.6. I-beams at GL: 2-1/3.6; 2-1/F.5; H-F.5/2; H-G/2. Ok to place concrete in progress areas. | |
| 05/03/2019 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | rescheduled for 6 May | |
| 04/19/2019 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | Contractor cancelled | |
| 04/18/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Concrete columns at GL: D-E/6-7: 3 each CC-1; 1 each CC-4. Ok to place concrete in progress areas | |
| 04/10/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Crane foundation and four columns | |
| 04/09/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Crane footing, first rebar mat and second rebar mat complete. |