Permit: T18CM08523
Permit Details
Apply Date:
10/25/2018
Applicant:
METRO TUCSON EXPEDITING & DEVELOPMENT
Description:
FOUNDATION FOR MULTI USE BUILDING
Contractors:
- U E B BUILDERS INC *** APA ***
Permit Reviews
Permit Number - T18CM08523
Permit Status: L of c
Permit Description: FOUNDATION FOR MULTI USE BUILDING
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/25/2019 | 3RD PARTY REVIEW - REVISION/OTHER | 01/28/2019 | COMPLETED |
| 03/20/2019 | 3RD PARTY REVIEW - REVISION/OTHER-2ND | 03/20/2019 | COMPLETED |
| 10/25/2018 | PLANS OK TO SUBMIT - COMM | 10/25/2018 | COMPLETED |
| 10/30/2018 | 3RD PARTY REVIEW - COMMERCIAL | 12/31/2018 | COMPLETED |
| 12/31/2018 | POST 3RD PARTY REVIEW | 01/10/2019 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T18CM08523
Permit Status: L of c
Permit Description: FOUNDATION FOR MULTI USE BUILDING
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 10/25/2018 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: L of c
Permit Number: T18CM08523
Permit Description: FOUNDATION FOR MULTI USE BUILDING
Total Completed Inspections - 37
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/21/2019 | ELECTRIC - UNDERGROUND | JBURGE | Approved | Temporary power at South perimeter wall: 3 each 4" conduits and 8 each 2" conduits. Primary power conduits from vaults to penetration of west perimeter wall; approximately 100': 30 each 4" conduits and 10 each 2" conduits. Ok to cover progress areas |
| 07/03/2019 | TEP CLEARANCE - PM | JBURGE | Approved | CODE TMPP |
| 07/03/2019 | ELECTRIC - SERVICE UPGRADE | JBURGE | Approved | Switch gear and power cabinets. Ok to set meter and energize system. CLEARANCE: CODE; TMPP |
| 07/18/2019 | PLUMBING - PRE SLAB | JBURGE | Approved | Hilti sleeves in place for floor penetrations |
| 10/07/2019 | STEM WALL/RETAINING WALL | JCLAXTON | Approved | |
| 10/14/2019 | PLUMBING - ROUGH, SOIL | JBURGE | Approved | 2 each 4". Grease lines from building to grease trap (approximately 50 feet). Ok to cover progress areas. Roof drains; 2each at 8" from Level #1 to South manhole. Ok to cover progress areas. |
| 11/13/2019 | SHEET ROCK NAILING | JBURGE | Approved | Contractor cancelled. |
| 11/15/2019 | PLUMBING - ABOVE CEILING | JBURGE | Approved | Levels 1 & 2; waste and Vent lines at East and South areas |
| 11/15/2019 | EXT METAL CLIPS/EXT SHEATHING | JBURGE | Approved | Level #3 exterior walls North and East, South wall partial. Ok to waterproof progress areas. |
| 11/22/2019 | MECHANICAL - FINAL | JBURGE | Approved | Contractor cancelled. |
| 12/03/2019 | PLUMBING - INTERMEDIATE | RCHANDLER | Approved | PREVIOUSLY AP REOPENED FOR REINSPECTION |
| 12/03/2019 | ELECTRIC - ABOVE CEILING | JBURGE | Approved | In wall electric at Level #3; Rooms 315; 317; 319; 322. Rooms at 3 South are not ready. |
| 12/03/2019 | MECHANICAL - ABOVE CEILING | JBURGE | Approved | Level #3; Rooms 315; 317; 319; 321; 322. Rooms at 3 South not ready |
| 12/03/2019 | BUILDING ABOVE CEILING | JBURGE | Approved | Contractor cancelled |
| 12/03/2019 | PLUMBING - FINAL | RCHANDLER | Approved | |
| 12/23/2019 | MECHANICAL - INTERMEDIATE | JBURGE | Approved | In wall Mechanical. |
| 12/23/2019 | ELECTRIC - INTERMEDIATE | JBURGE | Approved | In wall electric in room 310. Ok to cover walls. |
| 12/26/2019 | FRAMING | ESTEVENS | Approved | Level 5 unit # 531. |
| 12/30/2019 | REINFORCED MASONRY PRE-GROUT | JBURGE | Approved | Level #1; Curved arc, topped out at GL: B-9/C-8. Level #2; Northwest, Pump Room #124, at 4’-8’. Level #1; CMU wall at GL: 7/H-C.8. Ok to grout progress areas. |
| 12/30/2019 | BUILDING PRE-SLAB | JBURGE | Approved | Contractor cancelled. |
| 12/30/2019 | EXCAVATION/LAYOUT REBAR & ZON | JBURGE | Approved | Contractor cancelled. |
| 05/01/2020 | GAS CLEARANCE | JBURGE | Approved | CODE |
| 05/20/2020 | BUILDING - FINAL | JBURGE | Approved | INSPECTOR APPROVED BUILDING FINAL. PENDIN FIRE AND ZONING. |
| 05/20/2020 | PLUMBING - SEWER HCS CONNECT | JBURGE | Approved | |
| 05/20/2020 | PLUMBING - MD GAS/PRECONST MTG | JBURGE | Approved | |
| 05/20/2020 | ELECTRIC - CABLE DROP | JBURGE | Approved | |
| 05/20/2020 | ELECTRIC - UFER | JBURGE | Approved | |
| 07/15/2020 | TEP CLEARANCE - AM | JBURGE | Approved | CODE ECO/ Level #6; Meter sets at #600; 601; 602; 603; 604; 605; 607; 609; 610; 611; 630; 631; 632; 633; 634; 636. |
| 08/20/2020 | ENGINEERING - FINAL | DROBERTS | Approved | OK FOR A TCO, BUT NOT READY FOR A FINAL. WALKED THE SITE AND HAVE ADDRESSED SOME AREAS THAT NEED TI BE ATTENDED TO PRIOR TO ALLOWING PEDESTRIAN WITHIN THE PATHWAYS. GENERAL CLEANUP OF WORK AREAS THAT HAVE BEEN WORKED ON THROUGH THE NIGHT. MINOR SWEEPING OF ALL AREAS THAT WILL BE UTILIZED FOR ACCESS INTO THE BUILDING. THE CONTRACTOR IS HAULING PLANTING MATERIAL ALONG THE EAST SIDE OF THE BUILDING BYT IS PLANNING ON HAVING IT COMPLETE BY 8:00 am THIS MORNING. ADA COMPLIANCY HAS NOT BEEN FULLY CHECKED AND WILL BE EVALUATED AND CORRECTED OVER THE NEXT FEW WEEKS AS NEEDED. |
| 11/12/2020 | BUILDING - PROGRESS | JBURGE | Approved | 1090 |
| 11/12/2020 | FIREWALL/FIREBARRIER/FIRESTOP | JBURGE | Approved | 1090 |
| 11/12/2020 | ELECTRIC - FINAL | JBURGE | Approved | 1090 |
| 11/12/2020 | ELECTRIC - CONSTRUCTION POWER | JBURGE | Approved | 1090 |
| 02/16/2021 | NPPO - FINAL | DROBERTS | Approved | |
| 02/16/2021 | SIGN - FINAL | DROBERTS | Approved | |
| 02/16/2021 | LANDSCAPE - FINAL | DROBERTS | Approved | |
| 02/17/2021 | RIGHT OF WAY - FINAL | DR | Approved | Punchlist items completed per Jack Kokot. |