Permit: T17CM07583
Permit Details
Status:
C of o
Type:
MULTI FAMILY NEW
Address:
40 E ADAMS ST BLDG#1
Address NEW:
40 E ADAMS ST BLDG#1
Apply Date:
10/06/2017
Applicant:
CARHUFF, PHILIP ANDREW
Description:
APARTMENTS
Architects:
- CARHUFF, PHILIP ANDREW
Contractors:
- CANYON BUILDING AND DESIGN LLC *APA*
Permit Reviews
Permit Number - T17CM07583
Permit Status: C of o
Permit Description: APARTMENTS
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/23/2018 | REVISION - - 1ST | 05/24/2018 | COMPLETED |
| 07/06/2018 | REVISION - - 2ND | 07/06/2018 | COMPLETED |
| 07/24/2018 | REVISION - - 3RD | 07/24/2018 | COMPLETED |
| 10/06/2017 | PLANS OK TO SUBMIT - COMM | 10/06/2017 | COMPLETED |
| 10/12/2017 | COMMERCIAL - NEW | 11/15/2017 | COMPLETED |
| 11/15/2017 | RESUBMITTAL | 05/04/2018 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T17CM07583
Permit Status: C of o
Permit Description: APARTMENTS
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 10/06/2017 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T17CM07583
Permit Description: APARTMENTS
Total Completed Inspections - 45
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2017 | FIRE SPKLR - FINAL | RHERNANDEZ | Approved | P2I MAY BE DELETED WHEN ROOF/FLOOR TRUSS DESIGN CALCULATIONS AND DRAWINGS HAVE BEEN REVIEWED AND APPROVED. |
| 07/20/2018 | ELECTRIC - TEMPORARY SERVICE | BBENEDO1 | Approved | IVRS - Inspection :* |
| 08/23/2018 | SITE - SEWER | ESTEVEN1 | Approved | PROPER PIPE SIZES FROM THE SIDEWALK TO THE MANHOLE COVER AND CLEAN-OUTS ON SITE. |
| 08/28/2018 | PLUMBING - YARD WTR LINE/TEST | ESTEVEN1 | Approved | FROM THE BACKFLOW, 2" PIPE LINE TO "T", FROM "T" 2" LINE TO S.W. CORNER OF BUILDING 31. FROM "T" 1 1/4 " PIPE LINE to center of building #2. |
| 09/25/2018 | PLUMBING - SEWER HCS CONNECT | MHASSAN | Approved | |
| 10/26/2018 | REINFORCED MASONRY PRE-GROUT | ESTEVENS | Approved | Top out, 35’ elevator, 30’ stairs. |
| 11/02/2018 | PLUMBING - ROUGH, SOIL | JBURGE | Approved | All damaged plumbing in footings must be repaired. |
| 11/02/2018 | ELECTRIC - UFER | JBURGE | Approved | |
| 11/02/2018 | EXCAVATION/LAYOUT REBAR & ZON | JBURGE | Approved | Building footings (East and West). Ok to place concrete |
| 11/19/2018 | ELECTRIC - PROGRESS | TVALENCIA | Approved | |
| 11/19/2018 | ELECTRIC - UNDERGROUND | TVALENCIA | Approved | 1- Electric conduits located on the South side of the bldg are okay to cover. |
| 11/19/2018 | BUILDING PRE-SLAB | TVALENCIA | Approved | |
| 12/18/2018 | EXT METAL CLIPS/EXT SHEATHING | DMCCARTHY | Approved | 1- attended a walk through on the first bldg. with the Superintendent in reference to the installation of pre fab shear wall panels. |
| 01/30/2019 | ROOF NAILING | TVALENCIA | Approved | |
| 03/04/2019 | TEP CLEARANCE - PM | DQUINN | Approved | UNITS 1102-1111, 1201 to 1209, 1301 and 1302, 3 MAIN SERVICES CODE ECO |
| 03/04/2019 | ELECTRIC - CONSTRUCTION POWER | DQUINN | Approved | 40 E Adams apartment #’s 1102 to 1111, 1201 to 1209, 1301 and 1302. 3 main services at 40 E Adams ok to clear eco |
| 03/08/2019 | ELECTRIC - SERVICE UPGRADE | ESTEVENS | Approved | no clearance needed, 2065 is NA |
| 03/08/2019 | PLUMBING - BACK WATER VALVE | ESTEVENS | Approved | |
| 03/08/2019 | ELECTRIC - TEMPORARY POLE | ESTEVENS | Approved | |
| 03/08/2019 | STEM WALL/RETAINING WALL | ESTEVENS | Approved | |
| 03/18/2019 | STUCCO MESH | ESTEVENS | Approved | |
| 03/25/2019 | U VALUE FOR WINDOW | RCHANDLER | Approved | |
| 03/27/2019 | ELECTRIC - INTERMEDIATE | ESTEVENS | Approved | |
| 04/05/2019 | FRAMING | JBURGE | Approved | |
| 04/09/2019 | MECHANICAL - INTERMEDIATE | TVALENCIA | Approved | |
| 04/09/2019 | SHEET ROCK NAILING | TVALENCIA | Approved | |
| 04/09/2019 | FIREWALL/FIREBARRIER/FIRESTOP | TVALENCIA | Approved | |
| 04/09/2019 | BUILDING ABOVE CEILING | TVALENCIA | Approved | |
| 04/10/2019 | ELECTRIC - ABOVE CEILING | ESTEVENS | Approved | Above community center |
| 07/23/2019 | PLUMBING - PROGRESS | TVALENCIA | Approved | |
| 07/23/2019 | OUTDOOR LIGHTING FINAL | TVALENCIA | Approved | |
| 07/26/2019 | MECHANICAL - ABOVE CEILING | TVALENCIA | Approved | |
| 07/26/2019 | MECHANICAL - FINAL | TVALENCIA | Approved | |
| 07/26/2019 | PLUMBING - FINAL | TVALENCIA | Approved | |
| 07/26/2019 | ELECTRIC - FINAL | TVALENCIA | Approved | |
| 07/26/2019 | ELECTRIC - OUTDOOR LIGHTING | TVALENCIA | Approved | |
| 07/26/2019 | BUILDING - PROGRESS | TVALENCIA | Approved | |
| 08/14/2019 | PLUMBING - INTERMEDIATE | MHASSAN | Approved | |
| 08/14/2019 | BUILDING - FINAL | MHASSAN | Approved | |
| 08/14/2019 | CERTIFICATE OF OCCUPANCY | MHASSAN | Approved | |
| 08/14/2019 | TEP CLEARANCE - AM | BBENEDON | Approved | CODE TMPP |
| 08/14/2019 | FIRE - FINAL | CBASALDUA | Approved | |
| 08/14/2019 | FIRE - ALARM FINAL | CBASALDUA | Approved | |
| 08/14/2019 | CERTIFICATE OF OCCUPANCY | MHASSAN | Approved | full approval only pending fire departments approval they are scheduled to inspect today as well. |
| 08/14/2019 | BUILDING - FINAL | MHASSAN | Approved | full approval only pending fire departments approval they are scheduled to inspect today as well. |