Permit: T12CM04806
Permit Details
Apply Date:
08/06/2012
Applicant:
N/A
Description:
MULTI-STORY MIXED USE
Contractors:
- CAYLOR CONSTRUCTION COMPANY , RO
Permit Reviews
Permit Number - T12CM04806
Permit Status: C of o
Permit Description: MULTI-STORY MIXED USE
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/31/2013 | REVISION - - 2ND | 02/26/2013 | COMPLETED |
02/26/2013 | REVISION - - 2ND | 05/17/2013 | COMPLETED |
08/06/2012 | PLANS OK TO SUBMIT - COMM | 08/06/2012 | COMPLETED |
08/06/2012 | COMMERCIAL - NEW | 08/31/2012 | COMPLETED |
09/10/2012 | RESUBMITTAL | 09/26/2012 | COMPLETED |
09/26/2012 | RESUBMITTAL | 11/01/2012 | COMPLETED |
11/01/2012 | REVISION - - 1ST | 11/01/2012 | COMPLETED |
11/01/2012 | REVISION - - 1ST | 11/26/2012 | COMPLETED |
11/27/2012 | REVISION - - 1ST | 11/27/2012 | COMPLETED |
Completed Inspections
Permit Status: C of o
Permit Number: T12CM04806
Permit Description: MULTI-STORY MIXED USE
Total Completed Inspections - 52
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/20/2012 | ELECTRIC - UFER | LHANLY | Approved | supplementary ground at transformer pad ok |
12/05/2012 | ELECTRIC - UNDERGROUND | LHANLY | Approved | CONTINUATION OF SECONDARY INTO BASEMENT OK |
12/12/2012 | BUILDING - PROGRESS | LHANLY | Approved | SHOTCRETE SHORING OK |
12/28/2012 | EXCAVATION/LAYOUT REBAR & ZON | LHANLY | Approved | LINE 11/ E-H OK TO PLACE |
12/28/2012 | STEM WALL/RETAINING WALL | LHANLY | Approved | LINE D / 3-4.5 BASEMENT LEVEL OK TO PLACE. |
12/28/2012 | STEM WALL/RETAINING WALL | LHANLY | Approved | A.M. INSPECTION REQUEST FOR CIP WALL LINE D/ FROM 3 - 4.5 ONLY. CORRECTIONS STILL NOT MADE PER DISCUSSION WITH FOREMAN AND STEEL CONTRACTOR FROM YESTERDAY. IT IS NOT ACCEPTABLE TO FIELD BEND PARTIALLY EMBEDDED REINFORCING STEEL. PLEASE REFERENCE PLAN NOTES AND ACI 318 SECTION 7.3.2. |
12/28/2012 | EXCAVATION/LAYOUT REBAR & ZON | LHANLY | Approved | CONT. LINE G / 5-8 AND SPREAD FOOTINGS LINE F/ 5 & 6 PREVIOUSLY APPROVED LINE D AND LINE 1, PLUS STAIR 1 AND ELEVATOR PIT |
07/09/2013 | REINFORCED MASONRY PRE-GROUT | LHANLY | Approved | |
08/14/2013 | PLUMBING - PRE SLAB | LHANLY | Approved | |
08/14/2013 | PLUMBING - ROUGH, SOIL | LHANLY | Approved | |
08/14/2013 | EXT METAL CLIPS/EXT SHEATHING | LHANLY | Approved | |
08/14/2013 | BUILDING PRE-SLAB | LHANLY | Approved | |
09/09/2013 | MECHANICAL - HYDRONIC PIPING | LHANLY | Approved | |
09/09/2013 | ELECTRIC - CABLE DROP | LHANLY | Approved | |
09/09/2013 | ELECTRIC - TEMPORARY SERVICE | LHANLY | Approved | OK TO CLEAR ECO FOR OWNER METER , CEC CLEARANCE ONLY FOR OTHER SES SECTIONS. |
09/09/2013 | FRAMING | LHANLY | Approved | |
10/02/2013 | PLUMBING - BACK WATER VALVE | LHANLY | Approved | |
10/02/2013 | PLUMBING - SEWER HCS CONNECT | LHANLY | Approved | |
10/02/2013 | PLUMBING - ROOF DRAINS | LHANLY | Approved | |
10/15/2013 | MECHANICAL - ABOVE CEILING | LHANLY | Approved | |
10/15/2013 | PLUMBING - ABOVE CEILING | LHANLY | Approved | |
10/15/2013 | ELECTRIC - ABOVE CEILING | LHANLY | Approved | |
10/22/2013 | PLUMBING - INTERMEDIATE | LHANLY | Approved | |
10/22/2013 | ELECTRIC - INTERMEDIATE | LHANLY | Approved | |
10/22/2013 | ROOF NAILING | LHANLY | Approved | |
11/08/2013 | TEP CLEARANCE - AM | LHANLY | Approved | ECO UNITE 601-612 & 701-712 (24 UNITS TOTAL) |
11/19/2013 | MECHANICAL - INTERMEDIATE | LHANLY | Approved | |
11/19/2013 | PLUMBING - YARD WTR LINE/TEST | LHANLY | Approved | |
11/19/2013 | ELECTRIC - PROGRESS | LHANLY | Approved | |
11/19/2013 | BUILDING ABOVE CEILING | LHANLY | Approved | |
11/20/2013 | PLUMBING - PROGRESS | LHANLY | Approved | |
11/20/2013 | PLUMBING - GAS PRESS TEST FNL | LHANLY | Approved | |
11/20/2013 | PLUMBING - GAS PRESSURE TEST | LHANLY | Approved | |
11/20/2013 | SHEET ROCK NAILING | LHANLY | Approved | |
11/20/2013 | FIREWALL/FIREBARRIER/FIRESTOP | LHANLY | Approved | |
11/20/2013 | U VALUE FOR WINDOW | LHANLY | Approved | |
11/20/2013 | STUCCO MESH | LHANLY | Approved | |
12/18/2013 | FIRE - ALARM FINAL | CSCHULTZ | Approved | 1. Wire fire bell 2. Wire and test elevator operations 3. Install outside horn/strobe on roof top 4. All fire/smoke dampers shall close when fire alarm actives 5. Need to test smoke for elevators |
12/20/2013 | MECHANICAL - FINAL | LHANLY | Approved | LEVEL 6 OK |
12/20/2013 | PLUMBING - FINAL | LHANLY | Approved | LEVEL 6 OK |
12/20/2013 | ELECTRIC - FINAL | LHANLY | Approved | LEVEL 6 COMPLETE |
12/20/2013 | BUILDING - FINAL | LHANLY | Approved | LEVEL 6 DWELLING UNITS OK |
12/26/2013 | FIRE - FINAL | CSCHULTZ | Approved | Temporary fire final Approved for residents to move in to get final fire final the following shall be completed: Emergency generator back power was tested and all floors passed. 1. 7th floor east stairwell failed to shut closed 2. 6th floor finish tape and mud on fire rate ceilings 3. Between 4th and 5th stair landing emergency lighting failed east 4. 4th floor east stairwell smoke gasket needed 5. 3rd floor east stairwell not closing 6. 4th floor exit signs not working on emergency power in lobby 7. Emergency phones do not work 8. Doors in stairwells failed to unlock during emergency power 9. Sprinkler bell failed when tested 10. When fire pump was switched off came in as 7th floor trash chute and fire pump?? 11. In key boxes need label all keys and need key for the electrical room added 12. 3rd floor by west stairwell sprinkler head blocked by led lights 18" to 24" away from led 13. For interior exit stairway IBC & IFC 2006 & 2012 section 1020.1.5. & 1022.8 - add a directional exit sign(s) on ground level floor and an approved barrier is provided at level of exit discharge to prevent persons from unintentionally continuing into levels below. 14. Need elevator keys in key box and 3 recall and one elevator door opener 15. Per 2006 IBC section 716.3.2.1 you will need all fire/smoke dampers to close by detectors and fire alarm activation. 16. Need to install and test emergency key switch for main entrance doors |
12/26/2013 | FIRE SPKLR - UG, PIPING, HYDRO | CSCHULTZ | Approved | |
12/26/2013 | FIRE SPKLR - UG PIPING FLUSH | CSCHULTZ | Approved | |
12/26/2013 | FIRE SPKLR - FINAL | CSCHULTZ | Approved | |
01/17/2014 | RIGHT OF WAY - FINAL | TWOLFGAN | Approved | |
01/17/2014 | SIGN - FINAL | MRUSSO | Approved | |
01/17/2014 | LANDSCAPE - FINAL | MRUSSO | Approved | |
01/17/2014 | ENGINEERING - FINAL | MRUSSO | Approved | |
01/21/2014 | FIRE - LANE SIGNS | CSCHULTZ | Approved | |
01/22/2014 | FIRE - KITCHEN EXH HOOD FINAL | CSCHULTZ | Approved | No hood system installed |