Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
C of o
Type:
MULTI FAMILY NEW
Address:
1 E BROADWAY BL
Apply Date:
08/06/2012
Applicant:
N/A
Description:
MULTI-STORY MIXED USE
Contractors:
  • CAYLOR CONSTRUCTION COMPANY , RO

Permit Reviews

Permit Number - T12CM04806
Permit Status: C of o
Permit Description: MULTI-STORY MIXED USE
Start Date Submittal Complete Date Status  
01/31/2013 REVISION - - 2ND 02/26/2013 COMPLETED Review Details
02/26/2013 REVISION - - 2ND 05/17/2013 COMPLETED Review Details
08/06/2012 PLANS OK TO SUBMIT - COMM 08/06/2012 COMPLETED Review Details
08/06/2012 COMMERCIAL - NEW 08/31/2012 COMPLETED Review Details
09/10/2012 RESUBMITTAL 09/26/2012 COMPLETED Review Details
09/26/2012 RESUBMITTAL 11/01/2012 COMPLETED Review Details
11/01/2012 REVISION - - 1ST 11/01/2012 COMPLETED Review Details
11/01/2012 REVISION - - 1ST 11/26/2012 COMPLETED Review Details
11/27/2012 REVISION - - 1ST 11/27/2012 COMPLETED Review Details

Completed Inspections

Permit Status: C of o
Permit Number: T12CM04806
Permit Description: MULTI-STORY MIXED USE
Total Completed Inspections - 52
Date Description Inspector Results Comments
11/20/2012 ELECTRIC - UFER LHANLY Approved supplementary ground at transformer pad ok
12/05/2012 ELECTRIC - UNDERGROUND LHANLY Approved CONTINUATION OF SECONDARY INTO BASEMENT OK
12/12/2012 BUILDING - PROGRESS LHANLY Approved SHOTCRETE SHORING OK
12/28/2012 EXCAVATION/LAYOUT REBAR & ZON LHANLY Approved LINE 11/ E-H OK TO PLACE
12/28/2012 STEM WALL/RETAINING WALL LHANLY Approved LINE D / 3-4.5 BASEMENT LEVEL OK TO PLACE.
12/28/2012 STEM WALL/RETAINING WALL LHANLY Approved A.M. INSPECTION REQUEST FOR CIP WALL LINE D/ FROM 3 - 4.5 ONLY. CORRECTIONS STILL NOT MADE PER DISCUSSION WITH FOREMAN AND STEEL CONTRACTOR FROM YESTERDAY. IT IS NOT ACCEPTABLE TO FIELD BEND PARTIALLY EMBEDDED REINFORCING STEEL. PLEASE REFERENCE PLAN NOTES AND ACI 318 SECTION 7.3.2.
12/28/2012 EXCAVATION/LAYOUT REBAR & ZON LHANLY Approved CONT. LINE G / 5-8 AND SPREAD FOOTINGS LINE F/ 5 & 6

PREVIOUSLY APPROVED LINE D AND LINE 1, PLUS STAIR 1 AND ELEVATOR PIT
07/09/2013 REINFORCED MASONRY PRE-GROUT LHANLY Approved
08/14/2013 PLUMBING - PRE SLAB LHANLY Approved
08/14/2013 PLUMBING - ROUGH, SOIL LHANLY Approved
08/14/2013 EXT METAL CLIPS/EXT SHEATHING LHANLY Approved
08/14/2013 BUILDING PRE-SLAB LHANLY Approved
09/09/2013 MECHANICAL - HYDRONIC PIPING LHANLY Approved
09/09/2013 ELECTRIC - CABLE DROP LHANLY Approved
09/09/2013 ELECTRIC - TEMPORARY SERVICE LHANLY Approved OK TO CLEAR ECO FOR OWNER METER , CEC CLEARANCE ONLY FOR OTHER SES SECTIONS.
09/09/2013 FRAMING LHANLY Approved
10/02/2013 PLUMBING - BACK WATER VALVE LHANLY Approved
10/02/2013 PLUMBING - SEWER HCS CONNECT LHANLY Approved
10/02/2013 PLUMBING - ROOF DRAINS LHANLY Approved
10/15/2013 MECHANICAL - ABOVE CEILING LHANLY Approved
10/15/2013 PLUMBING - ABOVE CEILING LHANLY Approved
10/15/2013 ELECTRIC - ABOVE CEILING LHANLY Approved
10/22/2013 PLUMBING - INTERMEDIATE LHANLY Approved
10/22/2013 ELECTRIC - INTERMEDIATE LHANLY Approved
10/22/2013 ROOF NAILING LHANLY Approved
11/08/2013 TEP CLEARANCE - AM LHANLY Approved ECO UNITE 601-612 & 701-712 (24 UNITS TOTAL)
11/19/2013 MECHANICAL - INTERMEDIATE LHANLY Approved
11/19/2013 PLUMBING - YARD WTR LINE/TEST LHANLY Approved
11/19/2013 ELECTRIC - PROGRESS LHANLY Approved
11/19/2013 BUILDING ABOVE CEILING LHANLY Approved
11/20/2013 PLUMBING - PROGRESS LHANLY Approved
11/20/2013 PLUMBING - GAS PRESS TEST FNL LHANLY Approved
11/20/2013 PLUMBING - GAS PRESSURE TEST LHANLY Approved
11/20/2013 SHEET ROCK NAILING LHANLY Approved
11/20/2013 FIREWALL/FIREBARRIER/FIRESTOP LHANLY Approved
11/20/2013 U VALUE FOR WINDOW LHANLY Approved
11/20/2013 STUCCO MESH LHANLY Approved
12/18/2013 FIRE - ALARM FINAL CSCHULTZ Approved 1. Wire fire bell
2. Wire and test elevator operations
3. Install outside horn/strobe on roof top
4. All fire/smoke dampers shall close when fire alarm actives
5. Need to test smoke for elevators
12/20/2013 MECHANICAL - FINAL LHANLY Approved LEVEL 6 OK
12/20/2013 PLUMBING - FINAL LHANLY Approved LEVEL 6 OK
12/20/2013 ELECTRIC - FINAL LHANLY Approved LEVEL 6 COMPLETE
12/20/2013 BUILDING - FINAL LHANLY Approved LEVEL 6 DWELLING UNITS OK
12/26/2013 FIRE - FINAL CSCHULTZ Approved Temporary fire final Approved for residents to move in to get final fire final the following shall be completed:
Emergency generator back power was tested and all floors passed.
1. 7th floor east stairwell failed to shut closed
2. 6th floor finish tape and mud on fire rate ceilings
3. Between 4th and 5th stair landing emergency lighting failed east
4. 4th floor east stairwell smoke gasket needed
5. 3rd floor east stairwell not closing
6. 4th floor exit signs not working on emergency power in lobby
7. Emergency phones do not work
8. Doors in stairwells failed to unlock during emergency power
9. Sprinkler bell failed when tested
10. When fire pump was switched off came in as 7th floor trash chute and fire pump??
11. In key boxes need label all keys and need key for the electrical room added
12. 3rd floor by west stairwell sprinkler head blocked by led lights 18" to 24" away from led
13. For interior exit stairway IBC & IFC 2006 & 2012 section 1020.1.5. & 1022.8 - add a directional exit sign(s) on ground level floor and an approved barrier is provided at level of exit discharge to prevent persons from unintentionally continuing into levels below.
14. Need elevator keys in key box and 3 recall and one elevator door opener
15. Per 2006 IBC section 716.3.2.1 you will need all fire/smoke dampers to close by detectors and fire alarm activation.
16. Need to install and test emergency key switch for main entrance doors
12/26/2013 FIRE SPKLR - UG, PIPING, HYDRO CSCHULTZ Approved
12/26/2013 FIRE SPKLR - UG PIPING FLUSH CSCHULTZ Approved
12/26/2013 FIRE SPKLR - FINAL CSCHULTZ Approved
01/17/2014 RIGHT OF WAY - FINAL TWOLFGAN Approved
01/17/2014 SIGN - FINAL MRUSSO Approved
01/17/2014 LANDSCAPE - FINAL MRUSSO Approved
01/17/2014 ENGINEERING - FINAL MRUSSO Approved
01/21/2014 FIRE - LANE SIGNS CSCHULTZ Approved
01/22/2014 FIRE - KITCHEN EXH HOOD FINAL CSCHULTZ Approved No hood system installed

Documents

File Name Document Type  
None CERT OF OCC VIEW
001_T101.TIF CONSTRPLANS VIEW
002_A001.TIF CONSTRPLANS VIEW
003_A011.TIF CONSTRPLANS VIEW
016_A011.TIF CONSTRPLANS VIEW
004_A012.TIF CONSTRPLANS VIEW
005_A101.TIF CONSTRPLANS VIEW
006_A102.TIF CONSTRPLANS VIEW
007_A103.TIF CONSTRPLANS VIEW
008_A104.TIF CONSTRPLANS VIEW
009_A105.TIF CONSTRPLANS VIEW
010_A106.TIF CONSTRPLANS VIEW
011_A107.TIF CONSTRPLANS VIEW
012_A108.TIF CONSTRPLANS VIEW
010_A109.TIF CONSTRPLANS VIEW
013_A207.TIF CONSTRPLANS VIEW
014_A301.TIF CONSTRPLANS VIEW
015_A302.TIF CONSTRPLANS VIEW
016_A401.TIF CONSTRPLANS VIEW
017_A402.TIF CONSTRPLANS VIEW
018_A403.TIF CONSTRPLANS VIEW
019_A405.TIF CONSTRPLANS VIEW
020_A406.TIF CONSTRPLANS VIEW
021_A501.TIF CONSTRPLANS VIEW
022_A502.TIF CONSTRPLANS VIEW
023_A503.TIF CONSTRPLANS VIEW
024_A504.TIF CONSTRPLANS VIEW
025_A505.TIF CONSTRPLANS VIEW
026_A510.TIF CONSTRPLANS VIEW
027_A511.TIF CONSTRPLANS VIEW
028_A512.TIF CONSTRPLANS VIEW
029_A601.TIF CONSTRPLANS VIEW
030_A602.TIF CONSTRPLANS VIEW
031_A611.TIF CONSTRPLANS VIEW
032_A701.TIF CONSTRPLANS VIEW
033_A801.TIF CONSTRPLANS VIEW
029_AC013.TIF CONSTRPLANS VIEW
034_S1.0.TIF CONSTRPLANS VIEW
035_S1.1.TIF CONSTRPLANS VIEW
036_S1.2.TIF CONSTRPLANS VIEW
037_S1.3.TIF CONSTRPLANS VIEW
038_S1.4.TIF CONSTRPLANS VIEW
039_S1.5.TIF CONSTRPLANS VIEW
040_S1.6.TIF CONSTRPLANS VIEW
041_S1.7.TIF CONSTRPLANS VIEW
042_S1.8.TIF CONSTRPLANS VIEW
043_S1.9.TIF CONSTRPLANS VIEW
044_S1.10.TIF CONSTRPLANS VIEW
045_S2.0.TIF CONSTRPLANS VIEW
046_S3.0.TIF CONSTRPLANS VIEW
047_S3.1.TIF CONSTRPLANS VIEW
048_S3.2.TIF CONSTRPLANS VIEW
049_S3.3.TIF CONSTRPLANS VIEW
050_S3.4.TIF CONSTRPLANS VIEW
051_S3.5.TIF CONSTRPLANS VIEW
052_S3.6.TIF CONSTRPLANS VIEW
053_S3.7.TIF CONSTRPLANS VIEW
054_S3.8.TIF CONSTRPLANS VIEW
055_S3.9.TIF CONSTRPLANS VIEW
056_S3.10.TIF CONSTRPLANS VIEW
057_S3.11.TIF CONSTRPLANS VIEW
058_S3.12.TIF CONSTRPLANS VIEW
059_S3.13.TIF CONSTRPLANS VIEW
060_S3.14.TIF CONSTRPLANS VIEW
061_S4.0.TIF CONSTRPLANS VIEW
062_S4.1.TIF CONSTRPLANS VIEW
063_S5.0.TIF CONSTRPLANS VIEW
064_S5.1.TIF CONSTRPLANS VIEW
065_S5.2.TIF CONSTRPLANS VIEW
066_S6.0.TIF CONSTRPLANS VIEW
067_S6.1.TIF CONSTRPLANS VIEW
068_S6.2.TIF CONSTRPLANS VIEW
069_S7.0.TIF CONSTRPLANS VIEW
070_S7.1.TIF CONSTRPLANS VIEW
071_S7.2.TIF CONSTRPLANS VIEW
055_S7.3.TIF CONSTRPLANS VIEW
056_S7.4.TIF CONSTRPLANS VIEW
072_M101.TIF CONSTRPLANS VIEW
073_M102.TIF CONSTRPLANS VIEW
074_M103.TIF CONSTRPLANS VIEW
075_M104.TIF CONSTRPLANS VIEW
076_M105.TIF CONSTRPLANS VIEW
077_M106.TIF CONSTRPLANS VIEW
078_M107.TIF CONSTRPLANS VIEW
079_M108.TIF CONSTRPLANS VIEW
080_M109.TIF CONSTRPLANS VIEW
081_M110.TIF CONSTRPLANS VIEW
082_M201.TIF CONSTRPLANS VIEW
083_M202.TIF CONSTRPLANS VIEW
084_M203.TIF CONSTRPLANS VIEW
085_M301.TIF CONSTRPLANS VIEW
086_M302.TIF CONSTRPLANS VIEW
087_M401.TIF CONSTRPLANS VIEW
088_E101.TIF CONSTRPLANS VIEW
089_E102.TIF CONSTRPLANS VIEW
090_E103.TIF CONSTRPLANS VIEW
091_E104.TIF CONSTRPLANS VIEW
092_E201.TIF CONSTRPLANS VIEW
093_E202.TIF CONSTRPLANS VIEW
094_E203.TIF CONSTRPLANS VIEW
095_E204.TIF CONSTRPLANS VIEW
096_E205.TIF CONSTRPLANS VIEW
097_E206.TIF CONSTRPLANS VIEW
098_E207.TIF CONSTRPLANS VIEW
099_E208.TIF CONSTRPLANS VIEW
100_E209.TIF CONSTRPLANS VIEW
101_E210.TIF CONSTRPLANS VIEW
102_E211.TIF CONSTRPLANS VIEW
103_E212.TIF CONSTRPLANS VIEW
104_E301.TIF CONSTRPLANS VIEW
105_E302.TIF CONSTRPLANS VIEW
106_E303.TIF CONSTRPLANS VIEW
107_E304.TIF CONSTRPLANS VIEW
108_E305.TIF CONSTRPLANS VIEW
109_E306.TIF CONSTRPLANS VIEW
110_E307.TIF CONSTRPLANS VIEW
111_E308.TIF CONSTRPLANS VIEW
112_E309.TIF CONSTRPLANS VIEW
113_E401.TIF CONSTRPLANS VIEW
114_E402.TIF CONSTRPLANS VIEW
115_E403.TIF CONSTRPLANS VIEW
116_E404.TIF CONSTRPLANS VIEW
117_E405.TIF CONSTRPLANS VIEW
118_E406.TIF CONSTRPLANS VIEW
119_E407.TIF CONSTRPLANS VIEW
115_E407.TIF CONSTRPLANS VIEW
120_E408.TIF CONSTRPLANS VIEW
121_E409.TIF CONSTRPLANS VIEW
122_E410.TIF CONSTRPLANS VIEW
123_P101.TIF CONSTRPLANS VIEW
124_P102.TIF CONSTRPLANS VIEW
125_P103.TIF CONSTRPLANS VIEW
126_P104.TIF CONSTRPLANS VIEW
127_P105.TIF CONSTRPLANS VIEW
128_P106.TIF CONSTRPLANS VIEW
129_P107.TIF CONSTRPLANS VIEW
130_P108.TIF CONSTRPLANS VIEW
131_P109.TIF CONSTRPLANS VIEW
132_P110.TIF CONSTRPLANS VIEW
133_P201.TIF CONSTRPLANS VIEW
134_P202.TIF CONSTRPLANS VIEW
135_P203.TIF CONSTRPLANS VIEW
136_P204.TIF CONSTRPLANS VIEW
137_P205.TIF CONSTRPLANS VIEW
138_P206.TIF CONSTRPLANS VIEW
074_P207.TIF CONSTRPLANS VIEW
139_P207E.TIF CONSTRPLANS VIEW
140_P207W.TIF CONSTRPLANS VIEW
141_P208E.TIF CONSTRPLANS VIEW
142_P208W.TIF CONSTRPLANS VIEW
143_P209E.TIF CONSTRPLANS VIEW
144_P209W.TIF CONSTRPLANS VIEW
145_P210.TIF CONSTRPLANS VIEW
146_P301.TIF CONSTRPLANS VIEW
147_P302.TIF CONSTRPLANS VIEW
148_P401.TIF CONSTRPLANS VIEW
149_P402.TIF CONSTRPLANS VIEW
150_P403.TIF CONSTRPLANS VIEW
151_P404.TIF CONSTRPLANS VIEW
152_P405.TIF CONSTRPLANS VIEW
153_P501.TIF CONSTRPLANS VIEW
154_P502.TIF CONSTRPLANS VIEW
155_P601.TIF CONSTRPLANS VIEW
156_P602.TIF CONSTRPLANS VIEW
002_SHEET 3 OF 14.TIF CONSTRPLANS VIEW
003_SHEET 4 OF 14.TIF CONSTRPLANS VIEW
004_SHEET 5 OF 14.TIF CONSTRPLANS VIEW
005_SHEET 6 OF 14.TIF CONSTRPLANS VIEW
006_SHEET 7 OF 14.TIF CONSTRPLANS VIEW
007_SHEET 8 OF 14.TIF CONSTRPLANS VIEW
008_SHEET 9 OF 14.TIF CONSTRPLANS VIEW
009_SHEET 10 OF 14.TIF CONSTRPLANS VIEW
010_SHEET 11 OF 14.TIF CONSTRPLANS VIEW
011_SHEET 12 OF 14.TIF CONSTRPLANS VIEW
012_SHEET 13 OF 14.TIF CONSTRPLANS VIEW
013_SHEET 14 OF 14.TIF CONSTRPLANS VIEW
None DOCUMENTS VIEW