Inspection History Details
Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/26/2013 | EXCAVATION/LAYOUT REBAR & ZON | Approved | ||
| 01/11/2013 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | ALL FOOTINGS SOUTH OF LINE B (SPREAD AND CONTINUOUS HAVE NOW BEEN PLACED. | |
| 12/28/2012 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | CONT. LINE G / 5-8 AND SPREAD FOOTINGS LINE F/ 5 & 6 PREVIOUSLY APPROVED LINE D AND LINE 1, PLUS STAIR 1 AND ELEVATOR PIT |
|
| 12/28/2012 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | LINE 11/ E-H OK TO PLACE | |
| 12/24/2012 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* GL 2/F-G ONLY FROM COLUMN 4-7 ALONG LINE D FROM COLUMN 5-8 ALONG LINE H |
|
| 12/21/2012 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* | |
| 12/14/2012 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Pads for elevator pit, stair and crane footing placed without C.O.T. inspection. Rebar placement and concrete testing done by Justin Manchester..these reports accepted for these pads only. Superintendent notified that PDSD inspectors are only agents who may authorize placement of concrete for all future pours. elevator footing ok to place. |