Permit: T10CM01503
Permit Details
Apply Date:
06/02/2010
Applicant:
N/A
Description:
ADDITION:CLASSROOM:RESTROOMS
Contractors:
- CONCORD COMPANIES INC
Permit Reviews
Permit Number - T10CM01503
Permit Status: C of o
Permit Description: ADDITION:CLASSROOM:RESTROOMS
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/05/2011 | REVISION - - 1ST | 04/05/2011 | COMPLETED |
06/02/2010 | PLANS OK TO SUBMIT - COMM | 06/02/2010 | COMPLETED |
06/07/2010 | 3RD PARTY REVIEW-COMMERCIAL TI | 08/19/2010 | COMPLETED |
08/19/2010 | POST 3RD PARTY REVIEW | 08/24/2010 | COMPLETED |
08/24/2010 | RESUBMITTAL | 09/01/2010 | COMPLETED |
09/01/2010 | RESUBMITTAL | 09/09/2010 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T10CM01503
Permit Status: C of o
Permit Description: ADDITION:CLASSROOM:RESTROOMS
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
06/02/2010 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T10CM01503
Permit Description: ADDITION:CLASSROOM:RESTROOMS
Total Completed Inspections - 46
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/16/2010 | PLUMBING - ROUGH, SOIL | RMYERS | Approved | 1) PRE-SLAB 500-600 OK FOR CONCRETE 2) ROUGH SOIL FOR 300 OK TO COVER |
12/01/2010 | ELECTRIC - INTERMEDIATE | DSANTACR | Approved | IVRS - Inspection :* 1) OK HOME RUNS SE. AREA TO ELECTRIC ROOM AND CONUITS IN MASONRY WALLS EAST ROOMS |
12/13/2010 | BUILDING PRE-SLAB | AQUIROZ | Approved | 1) 302-508 |
12/13/2010 | PLUMBING - PRE SLAB | RMYERS | Approved | IVRS - Inspection :* |
12/14/2010 | ELECTRIC - UNDERGROUND | DSANTACR | Approved | IVRS - Inspection :* 1) 4" PVC FEEDER CONDUIT FROM EXIST. SES TO CORNER OF NEW BLDG BY PALM TREE |
04/12/2011 | ELECTRIC - UFER | RHOLLAND | Approved | IVRS - Inspection :*OK PVC TO CHILLER YARD & 4/0 TO REAM PLUS 40' OK RIGID 90 DEGREES |
08/03/2011 | TEP CLEARANCE - AM | JWEATHER | Approved | TEC CLEARED FOR "CHILLER METER" PER R. HOLLANDER |
08/09/2011 | PLUMBING - GAS PRESS TEST FNL | RMYERS | Approved | IVRS - Inspection :* |
08/09/2011 | FIRE - ALARM FINAL | DSIWARSKI | Approved | Not ready for inspection per State Fire Marshal Fred Durham. |
08/09/2011 | FIRE SPKLR - FINAL | DSIWARSKI | Approved | Not ready for inspection per State Fire Marshal Fred Durham. |
08/16/2011 | MECHANICAL - INTERMEDIATE | MRAMBER | Approved | IVRS - Inspection :* |
08/16/2011 | SHEET ROCK NAILING | JBURGE | Approved | IVRS - Inspection :* |
08/16/2011 | BUILDING ABOVE CEILING | JBURGE | Approved | IVRS - Inspection :* |
08/16/2011 | FRAMING | JBURGE | Approved | IVRS - Inspection :* |
08/24/2011 | ELECTRIC - ABOVE CEILING | RHOLLAND | Approved | RECEIVED CHECK #120 FOR 165.00 |
08/26/2011 | PLUMBING - GAS RECONNECT | LHANLY | Approved | |
08/26/2011 | PLUMBING - ABOVE CEILING | LHANLY | Approved | |
08/26/2011 | PLUMBING - INTERMEDIATE | LHANLY | Approved | |
08/26/2011 | SITE - SEWER | LHANLY | Approved | |
08/26/2011 | PLUMBING - SEWER HCS CONNECT | LHANLY | Approved | |
08/26/2011 | PLUMBING - GAS PRESSURE TEST | LHANLY | Approved | |
09/16/2011 | MECHANICAL - ABOVE CEILING | MRAMBER | Approved | IVRS - Inspection :* |
12/28/2011 | ELECTRIC - PROGRESS | RHOLLAND | Approved | IVRS - Inspection :* 1) BOND POLE AND GEC 250.54 2) USE CORRECT SIZE LUGS 3) PROVIDE PHYSICAL PROTECTION #8 AT POLE BASE 4) VERIFY LISTING OF ELECTRIC IN GROUND PULL BOX CHILLER: 1) LOOSE FITTINGS 2) SUPPORT SEAL TITE PER CODE 3) BOND CONTROL ENCLOSURE (NOTE INSPECTION 8/9/11) 4) 4" CONNECTOR CROSS THREADED |
12/28/2011 | ELECTRIC - OUTDOOR LIGHTING | RHOLLAND | Approved | IVRS - Inspection :* |
12/30/2011 | ELECTRIC - FINAL | LHANLY | Approved | ELECTRICAL INSPECTOR TO VERIFY INTERLOCK FROM RESTROOM EXHAUST FANS TO A/C |
12/30/2011 | BUILDING - FINAL | LHANLY | Approved | WAITING FOR FIRE AND ELECTRICAL FINALS, EXHAUST FANS SHOULD ALSO BE INTERLOCKED TO A/C...ELECTRICAL INSPECTOR SHOULD VERIFY. |
12/30/2011 | BUILDING - PROGRESS | LHANLY | Approved | |
12/30/2011 | REINFORCED MASONRY PRE-GROUT | LHANLY | Approved | |
12/30/2011 | EXCAVATION/LAYOUT REBAR & ZON | LHANLY | Approved | |
12/30/2011 | STEM WALL/RETAINING WALL | LHANLY | Approved | |
12/30/2011 | MECHANICAL - FINAL | LHANLY | Approved | |
12/30/2011 | MECHANICAL - HOOD SYSTEMS | LHANLY | Approved | |
12/30/2011 | PLUMBING - FINAL | LHANLY | Approved | |
12/30/2011 | PLUMBING - PROGRESS | LHANLY | Approved | |
01/04/2012 | ELECTRIC - SERVICE UPGRADE | RHOLLAND | Approved | IVRS - Inspection :* |
01/04/2012 | ELECTRIC - RECONNECT | RHOLLAND | Approved | IVRS - Inspection :* |
02/14/2012 | RIGHT OF WAY - FINAL | R.Hnat | Approved | |
02/17/2012 | NPPO - FINAL | MRUSSO | Approved | |
02/17/2012 | SIGN - FINAL | MRUSSO | Approved | |
02/22/2012 | LANDSCAPE - FINAL | MRUSSO | Approved | |
03/07/2012 | FIRE SPKLR - OH PIPING & HYDRO | WMOTTO | Approved | Approved by W. Motto on 09/20/2011 under permit #T11BU00339 |
03/07/2012 | FIRE - KITCHEN EXH HOOD FINAL | CSCHULTZ | Approved | No hood system was installed |
03/07/2012 | FIRE SPKLR - UG PIPING FLUSH | CSCHULTZ | Approved | STATE FIRE MARSHALL OFFICE DID UNDERGROUND LINE |
03/07/2012 | FIRE SPKLR - UG, PIPING, HYDRO | CSCHULTZ | Approved | STATE FIRE MARSHALL OFFICE DID UNDERGROUND LINE |
03/07/2012 | FIRE - FINAL | CSCHULTZ | Approved | |
06/28/2012 | ENGINEERING - FINAL | MRUSSO | Approved |