Permit Details

Status:
Final
Type:
Grading
Address:
266 E PASTIME RD
Apply Date:
06/08/2010
Applicant:
RICHARD CLUTTER
Description:
GRADING:
Contractors:
  • CONCORD COMPANIES INC

Permit Reviews

Permit Number - T10BU00919
Permit Status: Final
Permit Description: GRADING:
Start Date Submittal Complete Date Status  
06/08/2010 PLANS OK TO SUBMIT - GRADING 06/08/2010 COMPLETED Review Details
06/08/2010 GRADING 07/19/2010 COMPLETED Review Details
07/27/2010 RESUBMITTAL - GRADING 08/27/2010 COMPLETED Review Details
08/27/2010 RESUBMITTAL - GRADING ALL 09/16/2010 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T10BU00919
Permit Status: Final
Permit Description: GRADING:
Total Outstanding Activity Conditions - 1
Date Name
06/08/2010 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T10BU00919
Permit Description: GRADING:
Total Completed Inspections - 8
Date Description Inspector Results Comments
10/07/2010 ENGINEERING PRE-CONSTRUCTION MRUSSO Approved
10/07/2010 STORMWATER INSTALL OF CONTROLS MRUSSO Approved NO ACTIVITY ON SITE. >.5" RAIN, W/SOME TRACKING OF SOIL

1) INSTALL A STABILIZED CONSTRUCTION ENTRANCE
2) INSTALL SILT FENCE CORRECTLY, WITH BOTTOM OF FENCE TRENCHED INTO GROUND.
3) SWEEP UP TRACKING OFF OF PARKING AREA AND ADJACENT ROADWAY.
12/17/2010 GRADING - INTERMEDIATE MRUSSO Approved NO STORM WATER CONCERNS AT THIS TIME.
SOME SITE WORK COMPLETED, CALL FOR ANY CHANGES TO THE APPROVED GRADING PLAN.
08/10/2011 STORMWATER FOLLOW-UP INSP MRUSSO Approved SWEEP UP SOIL OFF PUBLIC ROADWAY. SEDIMENT CONTROLS MUST REMAIN IN PLACE UNTIL THE SITE IS 100% STABILIZED.
08/10/2011 GRADING - FINAL MRUSSO Approved SITE IS NO WHERE NEAR COMPLETION, HOWEVER CONTRACTOR CALLED IN FOR A FINAL INSPECTION.
SIDEWALKS NOT COMPLETE, STORM DRAIN BASINS NOT COMPLETE, PAVING NOT COMPLETE, OVERHEAD AWNING STRUCTURES NOT COMPLETE. TOO MANY ITEMS TO LIST THAT ARE LEFT TO DO.
SITE IS NOT SAFE FOR OCCUPANCY.
02/22/2012 STORMWATER FINAL INSPECTION MRUSSO Approved
05/14/2012 GRADING - CHECK FOR ACTIVITY MRUSSO Approved
06/26/2012 GRADING - TIER REV MRUSSO Approved AN AS-BUILT WAS SUBMITTED TO THE CITY OF TUCSON ALONG WITH A CERTIFICATION STATEMENT FROM THE ENGINEER OF RECORD. ALL REQUIRED ITEMS HAVE BEEN COMPLETED

Documents

File Name Document Type  
001_C0.0.TIF GRADING PLANS VIEW
002_C0.1.TIF GRADING PLANS VIEW
003_C1.0.TIF GRADING PLANS VIEW
004_C2.0.TIF GRADING PLANS VIEW
005_C3.0.TIF GRADING PLANS VIEW
006_C4.0.TIF GRADING PLANS VIEW
007_SD01.TIF GRADING PLANS VIEW
008_SD02.TIF GRADING PLANS VIEW
009_SD03.TIF GRADING PLANS VIEW
None DOCUMENTS VIEW
PERFORMANCE BOND RELEASE 2012_08_15.PDF DOCUMENTS VIEW