Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
Permit Number - T10BU00919
Inspection Description - ENGINEERING PRE-CONSTRUCTION
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/07/2010 | ENGINEERING PRE-CONSTRUCTION | Approved | ||
09/28/2010 | ENGINEERING PRE-CONSTRUCTION | Correction Required | SITE IS IN NON-COMPLIANCE WITH NPDES/AZPDES, AND THE COT STORM WATER ORDINANCE. 1) CONTRACTOR NEEDS TO IMPLEMENT THE APPROVED STORM WATER PLAN FOR THE SITE PRIOR TO CONSTRUCTION. 2) PROVIDE A STABILIZED CONSTRUCTION ENTRANCE PER YOUR PLAN. - OK TO CHANGE LOCATION. 3) INSTALL SEDIMENT CONTROLS ALONG THE EAST PERIMETER. ELIMINATE SEDIMENT CONTROLS ALONG THE SOUTH AS SHOWN ON PLAN. 4) ENSURE PERIODIC STORM WATER MAINT INSPECTIONS ARE PERFORMED PER THE STORM WATER PLAN. 5) SWEEP UP TRACKED SOIL OFF OF PUBLIC ROADWAY ON A ROUTINE BASIS. 6) THESE RECOMMENDATIONS CAN CHANGE THROUGHOUT THE PROJECT TO MOST EFFECTIVELY PREVENT SOIL FROM LEAVING THE SITE. RODNEY W/ CONCORD CONSTR. 419-4966 |